phil davies and tim surgenor
TRANSCRIPT
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Perth International Airport T1 Domestic Pier & International Terminal Expansion
4th busiest airport in Australia with over 151,000 aircraft movements in 2012/13
Services Australian and Indian Ocean destinations, as well as Johannesburg, Auckland, Dubai, Guangzhou and Doha.
Passenger numbers have trebled in the past 10 years with 12.6 million people travelling through the airport in 2012.
Based on the average growth rate, this figure will double to 24 million by 2019.
Passengers wanting to make a connecting international flight have a 10min journey by road to get to the International Terminal
In 2012, the Australian Competition and Consumer Commission released a report rating the Perth Airport as the worst in Australia, as judged by airlines
International Terminal (T1)
Passenger Statistics…
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Domestic Terminals (T3 & 4)
International Terminal (T1)
Passenger Statistics…
Perth International Airport T1 Domestic Pier & International Terminal Expansion
On the eastern side of the airfield stands the International Terminal (T1)
First operational in 1986
Total number of international passengers in 2012/13 = 3.7 million
International Terminal and Domestic Terminal 2
Perth International Airport T1 Domestic Pier & International Terminal Expansion
To the south of T1 lies the new Domestic T2
Commenced operations in April 2013
Caters for up to 36 aircraft
16 check-in counters
14 aircraft gates
T2 Airline operators:
International Terminal and Domestic Terminal 2
Perth International Airport T1 Domestic Pier & International Terminal Expansion
On the western side of the airfield stand the domestic terminals T3 & T4
Total number of domestic passengers
in 2012/13 = 9.9 million
T3 Airline Operators:
T4 Airline Operators:
Domestic Terminals 3 &4
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Key Objectives:
Increase the capacity of the International Terminal
Relieve Terminal & Apron Congestion
Relocate of Some Domestic Operations
Improve Customer Facilities
Provide Flexible Infrastructure
T1 Major Development Plan
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Existing T1 Building – 1986 -2011
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m
Perth International Airport T1 Domestic Pier & International Terminal Expansion
• Substantial re-configuration of the existing accommodation
• An expansion of T1 to the east to cater for new Arrivals area
Value proposition for Perth Airport is to create a terminal upgrade that will provide a positive passenger experience thereby helping to brand the airport as a world class facility
Major enhancements:
• New 1st floor Immigration primary line
• Increased arrivals duty free area
• Expanded baggage hall facilities
• Secondary search area
Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m
Perth International Airport T1 Domestic Pier & International Terminal Expansion
T1 Domestic Pier & International Expansion 2013 – Completion 2014 Area: Approx. 44,000m2 Value: $380m
Perth International Airport T1 Domestic Pier & International Terminal Expansion
• Addition of major new facilities for both arrivals and departures
Major enhancements:
• 2 gates to accommodate Airbus A380
• Substantial new international departures lounge
• New pier serving 8 stands and 12 aerobridges
• Increased arrivals duty free area
• Expanded baggage reclaim hall facilities
• Secondary search area
T1 Domestic Pier & International Expansion 2013 – Completion 2014 Area: Approx. 44,000m2 Value: $380m
Perth International Airport T1 Domestic Pier & International Terminal Expansion
T1 Domestic Pier & International Expansion
Perth International Airport T1 Domestic Pier & International Terminal Expansion
• Hydraulic
• Mechanical
• Electrical
• Fire
• Structural
• Architecture
BIM Benefits
Federated model created in Navisworks
Cross discipline clash detection performed in Navisworks
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Tight project deadlines
Improve documentation quality
Exchange of information
Market pressure
Better testing
Early identification of errors
Clearer communication
A single, reliable, source of information
Fewer coordination errors
BIM Drivers
Perth International Airport T1 Domestic Pier & International Terminal Expansion
An ideal BIM methodology involves:
Developing
Assessing
Establishing
Collaborating
Managing
It requires that all participants:
Commit
Contribute
Ensure
Adopt
BIM Methodology
Perth International Airport T1 Domestic Pier & International Terminal Expansion
The key to success with BIM delivery is dependent on:
a clear understanding of the client and project team's objectives
a careful assessment of the capabilities of the team, timeframe and budget
The ideal BIM process is one in which:
all stakeholders are committed to developing, and deriving information from the digital model
roles and responsibilities are clearly defined
a contractual framework that encourages greater collaboration.
BIM Success
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Through Coordination
BIM From Design to Construction
From Design
To Construction
…and beyond?
Perth International Airport T1 Domestic Pier & International Terminal Expansion
BIM process seeks to facilitate and encourage higher levels of collaboration - not just 3D drafting
Frequent information sharing - Airport single modelling team
Sub-contractor, engineer and architect design teams stationed together
BIM In Construction
Team approach to projects in Design / Construction
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Potential Benefits to Sub-contractors
• Significantly reduced project delivery risk
• Ultimately total lower cost and improved profitability
• Reduced site meetings
• Improved coordination and reduction in on-site clashes
• Reduction in re-works and material wastage
• Scheduling and planning accuracy
BIM In Construction
Perth International Airport T1 Domestic Pier & International Terminal Expansion
“The mobile app is the next horizon of coordination and communication with the field. As a contractor, I think the field is in a position to really leverage this technology in exciting ways”
Lincoln Wood
Engineer
Turner Construction Company
Potential Benefits to Sub-contractors
• Measuring, take-offs, procurement
• Shop drawing processes
• Pre-fabrication
• BIM to Field – iPads e.g. BIM glue
BIM In Construction
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Benefits of Sub-contractors using BIM to the consultant and client in:
• Reduced RFI’s
• Less variations
• As-build Model as an asset for owner
BIM In Construction
Perth International Airport T1 Domestic Pier & International Terminal Expansion
However…
• All depends on early engagement of Sub-contractors and…
• Their attitude to and experience of BIM
• 3D drafting vs Collaborative BIM
BIM In Construction
Perth International Airport T1 Domestic Pier & International Terminal Expansion
Conclusion…
• We’re on a journey worth taking
• Clients driving BIM
• BIM champions in management
BIM In Construction