philadelphia district 2008 – 2012 dredging program
TRANSCRIPT
NJNJ
PAPAPhiladelphiaPhiladelphia
TrentonTrenton
DoverDover DelawareDelawareBayBay
BaltimoreBaltimore
Manasquan Manasquan InletInlet
NAP Navigation Projects
Cold Springs Inlet (Cape may Inlet)
C&D CanalDelaware River, Phila to the Sea
Delaware River, Phila to Trenton
L&R Canal
Barnegat Inlet
Absecon Inlet
Schuylkill River
Mispillion River
Murderkill RiverNJIWW
Maurice River
Cohansey River
Salem River
Indian River Inlet
Delaware River, Ph to the Sea
FY08-FY12 Dredging Schedule FY08-FY12 Dredging Schedule Philadelphia DistrictPhiladelphia District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
Hydraulicl2M
Upland
UplandMechanical500K
Hydraulicl1M
Upland
MaintenanceDredging
MechincalHopper300K
Upland
Hydraulic~40K
Upland
Hydraulic Upland
UplandHydraulicl~250K
Site 92open
Mechanical~600K
Delaware River, Ph to Trenton
Wilmington Harbor
C&D CanalProper
Schuylkill River
Salem River
C&D CanalApproaches
C&D CanalLower approach.
Delaware River, Phila. to SeaDelaware River, Phila. to SeaMaintenance Dredging - HydraulicMaintenance Dredging - Hydraulic
US Army CorpsUS Army Corpsof Engineersof EngineersPhiladelphia DistrictPhiladelphia District
Cubic Yards – 2,000,000Type of Material – Maintenance – Silt/Sand Type of Equipment – PipelineType of Disposal – Confined Upland DisposalBid Opening Date – Spring Frequency - Annual
Conditions: Issue work assignments for different ranges. First work assignment is normally issued by September.
New Castle Range/ Killcohook Disposal AreaNew Castle Range/ Killcohook Disposal Area
Disposal Area – upland
Delaware River – 5,246 acresC&D Canal - 7,623 acresNJIWW - 36 acresWilmington Harbor - 277 acres
Wilmington Harbor, DEWilmington Harbor, DEMaintenanceMaintenance
US Army CorpsUS Army Corpsof Engineersof EngineersPhiladelphia DistrictPhiladelphia District
Cubic Yards – 650,000
Type of Material – Silt
Type of Equipment – Pipeline
Type of Disposal – Confined Upland Disposal
Frequency - Annual
Remarks – No dredging allowed between 1 April and
15 June
IWW, Delaware River – IWW, Delaware River – Chesapeake BayChesapeake Bay
Lower Approach MaintenanceLower Approach MaintenanceUS Army CorpsUS Army Corpsof Engineersof EngineersPhiladelphia DistrictPhiladelphia District
Cubic Yards – 600,000Type of Material – SiltsType of Equipment – Open water - Bucket and scows
Type of Disposal – Open water
Special Conditions – Placement of material in the disposal area Environmental Windows/ Constraints – Open Water placement
Remarks – Site 92 closes after 2009
C&D Canal
Del
awar
e R
iver
Del
awar
e R
iver
Baltimore
MD DE
Dover
Chesapeake Bay
Poole’sIsland
DelawareCityChesapeake
City
IWW from Delaware IWW from Delaware River to Chesapeake River to Chesapeake
Bay, DE & MDBay, DE & MD
Site 92Site 92
Schuylkill RiverSchuylkill RiverMaintenanceMaintenance
US Army CorpsUS Army Corpsof Engineersof EngineersPhiladelphia DistrictPhiladelphia District
Cubic Yards – 500,000
Type of Material – Silt
Type of Equipment – Pipeline
Type of Disposal – Confined Upland Disposal
Frequency Every other year
Environmental Windows/ Constraints – None
Remarks – Numerous pipeline crossings.
NJNJ
PAPAPhiladelphiaPhiladelphia
TrentonTrenton
DoverDover DelawareDelawareBayBay
BaltimoreBaltimore
Manasquan Manasquan InletInlet
WilmingtonWilmington
C&D CanalC&D Canal
Delaware RiverDelaware RiverMain ChannelMain ChannelDeepeningDeepeningDE, NJ & PADE, NJ & PA
AtlanticAtlanticOceanOcean
Beckett Street TerminalBeckett Street Terminal(Project Limit)(Project Limit)CamdenCamden
Cape MayCape May
CapeCape Henlopen Henlopen
ProjectProjectLimitLimit
NJNJ
PAPAPhiladelphiaPhiladelphia
DoverDover DelawareDelawareBayBay
BaltimoreBaltimore
MDMD
DEDE
ManasquanManasquanInletInlet
Barnegat InletBarnegat Inlet
Absecon InletAbsecon Inlet
Coastal Navigation ProjectsCoastal Navigation Projects
Cape May Inlet
Indian River InletN
JIW
W
NJI
WW
FY08-FY12 Dredging Schedule FY08-FY12 Dredging Schedule Philadelphia DistrictPhiladelphia District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
Hydraulic300K
Upland
Open Beach
Gov’tPlant95K
Gov’t Plant100K
Open Beach
MaintenanceDredging
Gov’tPlant60K
OpenBeach
NJIWW
Cold Spring Inlet
Barnegat Inlet
Manasquan Inlet
New Jersey Intracoastal WaterWayNew Jersey Intracoastal WaterWay Maintenance Maintenance
US Army CorpsUS Army Corpsof Engineersof EngineersPhiladelphia DistrictPhiladelphia District
Cubic Yards – 350,000
Type of Material – Sand and silt
Type of Equipment – Pipeline
Type of Disposal – Confined Upland and Open Water
Environmental Windows/ Constraints – N/A
Remarks – Small Business set aside
Rehoboth &Rehoboth &Dewey BeachesDewey Beaches
20052005
Bethany – Bethany – S. BethanyS. Bethany
(initiated 2007)(initiated 2007)
Fenwick IslandFenwick Island20052005
DEDE
MDMD
1
Ocean CityOcean City
DE Shore Protection ProjectsDE Shore Protection Projects
KEYKEYConstructed projects (date)Constructed projects (date)
KEYKEYConstructed projects (date)Constructed projects (date)
Lewes – Lewes – RooseveltRoosevelt
20042004
Updated October 2007
Philadelphia District Coastal Storm Damage Reduction Projects
Barnegat Inlet toBarnegat Inlet toLittle Egg Inlet (LBI)Little Egg Inlet (LBI)
20052005
Barnegat Inlet toBarnegat Inlet toLittle Egg Inlet (LBI)Little Egg Inlet (LBI)
20052005
Brigantine Is. – 2005Brigantine Is. – 2005
Great Egg Inlet to Townsends Inlet
Great Egg Inlet to Townsends Inlet
Cape May City - 1990Cape May City - 1990
Ocean City - 1992Ocean City - 1992
Hereford Inlet to Cape MayHereford Inlet to Cape May
Lower Cape May MeadowsCape May Point - 2004
Lower Cape May MeadowsCape May Point - 2004
Avalon – Stone Harbor - 2002Avalon – Stone Harbor - 2002
Absecon Is. - 2003Absecon Is. - 2003
Manasquan Inlet toBarnegat Inlet
Manasquan Inlet toBarnegat Inlet
KEYKEY
Constructed Project (Date Initiated)Constructed Project (Date Initiated)
Authorized, not ConstructedAuthorized, not Constructed
Not Yet AuthorizedNot Yet Authorized
Oakwood Beach
Reeds Beach
Villas
Updated: October 2007
Barnegat Inlet to Little Egg Inlet (LBI)
FY08-FY12 Dredging Schedule FY08-FY12 Dredging Schedule Philadelphia DistrictPhiladelphia District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
Mechanical500K
Beach
BeachHydraulic-Hopperl
1.6M
HydraulicHopperl
500K
Beach
Beach FillDredging -NJ
Hydraulic-Hopper~1.1M
Beach
Hydraulic-Hopper~800K
Beach
Hydraulic-Hopper~650K
Beach
BeachHydraulic-Hopper~400K
Brigantine Island
Absecon Island
Ocean City Beach fill
7 Mile Island
Cape May City& CG Base
Cape May Point
Roosevelt Inlet- Lewes
FY08-FY12 Dredging Schedule FY08-FY12 Dredging Schedule Philadelphia DistrictPhiladelphia District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
Hydraulic132K
Beach
UplandHydraulic – Hopperl
320K
Hydraulic-Hopperl
360K
Upland &
HARS
Beach FillDredging - DE
Hydraulic~Hopper
480K
Upland
Rehoboth – Dewey Beach
Fenwick Island
Bethany – SouthBethany