phone address

26
Phone: +964 (0) 773-775 5117 http://www.mwholding.org [email protected] Address: No.12/1, 42nd Street, Al-Wahda, Karrada, Baghdad, Iraq

Upload: others

Post on 11-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Phone Address

Phone: +964 (0) 773-775 5117

http://www.mwholding.org

[email protected]

Address: No.12/1, 42nd Street, Al-Wahda, Karrada, Baghdad, Iraq

Page 2: Phone Address

PART1 : INTRODUCTION

– MW HODING MISSION & VISION

– ABOUT US

– TARGETS , MISSION & VISION

– SUPPLIED SERVICES

– FIELD OF ACTIVITY

– REGISTERATION DOCUMENTS

– GRADES & CERTIFICATES

PART2 : REFERENCE LIST

– REFRENCE LIST ( DONE AND ONGOING

PROJECTS )

– DESCRIPTION

PART3 : ORGANIZATIONAL TOP CHART

– ORGANIZATION CHART

– HUMAN RESOURCE

– PART4 : MACHINERY & TURN OVER

– FINANCIAL CREDITS

– MACHINARIES

– OFFICE FACILITIES

Page 3: Phone Address

Madinat al- wafa

City of fidelity

Fidelity to earth (water, soil, resources, living things, human beings and human values)

Fidelity to time (past, now and future) and trying to improve the earth and making it more beautiful

for the posterities

In line with alignment with “Think globally, act locally”, this company has targeted its

organizational mission for taking 14 big, vital, effective and valuable steps for earth and improving

the life condition of the living things in it.

Taking each step will make one of the letters green

Because of the first step that is the birth of this idea and the company establishment in 2015, the M

letter has turned green.

The logo of the company is resulted from combining the green earth and whatever on it (M in green)

and soil and whatever in it (W in gray).

Also it has been matched with the company motto and it can be seen like the Infinity sign.

An infinite team in an infinite world; the motto that has been pinned to the company name. This

company will do its best to reach its organizational and sacred goals.

Page 4: Phone Address

•The was founded in 2015 and since its establishment, it has been working as a

contractor in various engineering, procurement and construction departments. Acquiring various

experiences in the implementation of national projects in the fields of gas & oil, petrochemicals,

industry and environment during the activity, the company has been introduced as one of the active

EPC contractor companies with the ability to implement large projects from engineering to

commissioning And delivery to the client and after-sales service.

•Utilizing the knowledge of experienced and young professionals and insisting on observing the

principle of commitment and responsibility has been the guarantor of the dynamism and success of

this company in the implementation of industrial projects. Accordingly, effective cooperation with

clients and their satisfaction during and after the implementation of projects has been considered as

one of the strengths points of this company.

•The considers it its duty to provide the desired quality services and tries to complete

the assigned projects on time in accordance with the requirements of its clients, relying on quality

control, observance of safety principles and schedule.

•The specializes in the design and construction of storage and pressure tanks,

transmission lines, water and wastewater treatment units, refinery and power plant systems, all

activities related to reduction stations (GRS) and gas pressure boosting (GCS), petrochemical and

chemical industries, all matters related to industrial ICT, electricity, instrumentation, steam and

power generation, environmental protection, technical inspection and MC management.

Page 5: Phone Address

Targets:To be one of the top ten contractors in Iraq and to do high tech, fundamental and

strategic projects by (2030) horizon.

Mission:Creating systematic organization respecting knowledge with proper ability for

executing high scale and strategic projects and increasing national wealth.

Values:Integration and conformity Result Orientated Organization commitment Credit and

acceptability Responsibility Innovation Mission & Vision.

Strategy:

Observe and predict market's requirements Extending area of activity to the neighbor

countries Try to achieve better performance through managing and executing

improvement projects Entering new markets Using new technologies with research

and development methods containing technology transfer Employing professional ,

committed and genius staffs respecting priority for jobs based on knowledge.

Page 6: Phone Address

Construction

• Civil works• Erection of Fixed & rotary equipment.

• Piping

• Electrical & Instrumentation

• Painting , Insulation & Cathodic protection

• Pre - Commissioning

• Commissioning

• Operation & maintenance

Investment

• Market Research

• Finance and investment of project

Engineering

• Feasibility study

• Basic design

• Detail design

• Site Supervision

• Training

Procurement

• Suppliers Evaluation

• Letter of credit openings

• Inspection

• Insurance

• Shipping

Page 7: Phone Address

Activity Water & Wastewater

• Water Treatment

• Wastewater treatment

• Water & wastewater pipeline Pumping Station

• Concrete storage tanks

Industry

• Industrial ICT

• Cement Factory

• Steel Factory

• Food Industries

• Medical industries

• others

Field

petrochemical

OIL &

GAS

Environment

water & wastewater

Industry

Power Plan

Oil , Gas & Petrochemical

• Oil and Gas refineries

• Oil & Gas pipelines

• Storage tanks

• Gas pressure reducing station

• Gas compressing station

• Petrochemical complexes

• Wellhead equipment & desalination

Power plants

• Combined cycle, gas & steam turbine power plants

• Cooling systems

• MV / LV substation

• Transmission & Distribution Networks

Page 8: Phone Address

Company Name:

Type: Limited Liability Company; Ltd. Co

Subject of Activity: (EPCC) Contractor in Oil and Gas petrochemicals, industry ICT ,

environment and Energy.

Date of establishment: 2015

Bank account number:

Registered capital: 1 billion Iraqi Dinar

Members of the board of directors: 2 members

Registration Information

Page 9: Phone Address

ProgressClientDateProject

%100Iraq Oil

Ministry

(OPC)

2015Civil and Mechanical implementation for AL-QUDS branch

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%100Iraq Oil

Ministry

(SCOP)

2016FOC Tests and installation Fiber Optic Cable and Enclosure

48 Inch Gas Pipe Line Abadan - Basrah Project

%100Iraq Oil

Ministry

(OPC)

2017Procurement, cabling, Wiring, Pre– Commissioning and

Commissioning, Operation, Maintenance AL-SADR Gas Reducing

Station(GRS)

%100Iraq

Electrical

Ministry

201726 Km Fiber Optic Cable implementation in separate trench for

AL-MANSOURIA branch

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%100Iraq Oil

Ministry

(OPC)

2017Civil and instrument implementation(include: Shelter, instrument

equipment, trenches, Cabling and wiring and atc)AL-QUDS Gas Reducing Station(GRS)

activeIraq Oil

Ministry

(OPC)

2018Commission, Operation and MaintenanceAL-QODS Gas Reducing Station(GRS)

Page 10: Phone Address

ProgressClientDateProject

%100Iraq

Electrical

Ministry

2018

Civil and Foundation implementation for Solar system,

Telecommunication Container, VHF Tower in LBV Stations

and Telecom Node

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%50Iraq Oil

Ministry

(OPC)

2018

43 Km Right Of Way(R.O.W)implementation

AL-MANSOURIA branch

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%30

Iraq

Electrical

Ministry

(MOE)

2019

Civil and Construction implementation for 2 Unit

(Each Unit 160 Megawatt)

DIBIS Power Plant – Iraq

%100Iraq

Electrical

Ministry

2019Engineering, Tooling , construction of workshop implementation

North of Basrah – SHATT AL- ABRAB Water Project

%80Iraq Oil

Ministry

(OPC)

2018

Fiber Optic Cable Tests, Enclosure installation

Programing and Electronic markers installation

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%80Iraq

Electrical

Ministry

2020installation and implementation Power Supply system(Include: Earthing,

Lighting, Lightning, Solar and rectifier charger)

48 Inch Gas Pipe Line Naftkhane – Baghdad Project

%20

Iraq

Electrical Ministry

(MOE)

2020Piping and Mechanical implementation for 2 Unit

(Each Unit 160 Megawatt)

DIBIS Power Plant – Iraq

Page 11: Phone Address

Project: 48 Inch Gas Pipe Line Naftkhane - Baghdad

Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new

gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length

48" pipeline as the main route including three main branches considered:

• AL-MANSOURIA branch with about 43 Km length 32" pipeline.

• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.

• AL-SADR branch with about 9 Km length 32" pipeline.

•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and

Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the

Baghdad.Activities

Civil and Mechanical implementation for AL-QUDS branch with about 30 Km length 32"

pipeline(include: excavation, Pipe Line, Welding, Tests, Boring, CCW, Geotextile, Backfill .

all implementation about Civil and Mechanical for LBV Stations and Interconnections for AL-QUDS

and AL-SADR branches

Client: Iraq Oil

Ministry (OPC)

Start Date: 2015

Progress: %100

Page 12: Phone Address

Project: Fiber Optic Cable - 48 Inch Gas Pipe Line Abadan - Basrah

Description: Petroleum and Electric Ministries of Iraq are developing and implementing 48" and 16" Gas

Pipeline Project. The objective of the Project is to Design, Procurement, Construction and Commissioning of all

required facilities (Such as pipeline, LBV station, Gas reducing station and all other related equipment) to

transport the natural gas from IRAN to IRAQ. This pipeline (Main route) will be constructed from

ABADAN to SHATT AL-BASRAH, AL-NAJIBIYIA, RUMAILAH Electrical power station and

RUMAILAH Compressor station. It is a branch of IGAT-VI pipeline. The length of this pipeline is about 94

km, its diameter is 48" and the design pressure is 1400 psi. The 16" pipe line is about 11.5 Km will be branched

from main line to AL-NAJIBIYIA electrical power station. The main route branches as the following pipelines:

SHATT AL-BASRAH Branch:

•SHATT AL-BASRAH 36" pipeline will be branched from main pipe line to Shatt AL-Basrah electrical power

station. The design pressure is 1400 psi. SHATT AL-BASRAH gas reducing station will be constructed in this

branch to reduce the pressure to 40 bar (588psi).

Page 13: Phone Address

AL-NAJIBIYIA Branch:

•AL-NAJIBIYIA 16" pipeline will be branched from main pipe line to AL-NAJIBIYIA electrical power station.

The design pressure of this branch is 1050 psi. AL-NAJIBIYIA pressure control station will be constructed the

start point of this branch and reduce the design pressure from

•1400 psi to 1050 psi. AL-NAJIBIYIA gas reducing station will be constructed to reduce the pressure to 40 bar

(588psi).

• RUMAILAH Branch:

•RUMAILAH 36" pipeline will be branched from main pipe line to RUMAILAH electrical power station. The

design pressure is 1400 psi. RUMAILAH gas reducing station will be constructed in this branch to reduce the

pressure to 40 bar (588psi).Activities

Fiber Optic Cable implementation in common trench with Gas Pipe line, according to Omnisense factory

procedure(Include: sand soil under & up the FOC, installation FOC, warning tape, backfill and FOC Tests,

program and install electronic markers, install 3M(2178s) FOC Enclosures).

This FOC will use for Gas Leak Detection(GLDS) and Intrusion Detection System(IDS)

The 24 core armored FOC has made by Prysmian Draka factory from Spain.

Client: Iraq Oil

Ministry(SCOP)

Start Date: 2016

Progress: %100

Page 14: Phone Address

Project: Cabling, Wiring & Instrument GRS – AL-SADR

Description: The Iraqi Ministry of Electricity plans to use its natural gas and other countries to

increase electricity production and reduce environmental problems.

Thus, the OPC(a branch of Oil ministry) has implemented, Pipe line and has operated Gas Reducing

Station(GRS) in AL-SADR power plant.

AL-SADR power plant Near Baghdad Plays a Key Role in Helping to Meet the Iraq Country's Growing

Energy Needs.

Activities

Procurement, cabling, Wiring, Pre–Commissioning and Commissioning,

Operation, Maintenance AL-SADR Gas Reducing Station(GRS)

Client: Iraq Oil

Ministry (OPC)

Start Date: 2017

Progress: %100

active

Page 15: Phone Address

Project: Piping and Mechanical implementation – DIBIS Power plant

• Description: The Iraqi Ministry of Electricity(MOE(a branch of Electricity ministry)) plans to build

two new 110-megawatt units to solve the electricity problem in the north of the country.

The equipment of new units (V94/2(SGT5)) will supply by SIEMENS factory.

The DEBIS power plant between Kirkuk and Erbil Plays a Key Role in Helping to Meet the Iraq

Country's Growing Energy Needs.

Activities

Full implementation and of the excavation , piping and mechanical.

Full implementation and of the LFO, HFO, Oil & Gas for Units.

Full implementation and of the Forwarding / On Loading, Auxiliary Boilers, Rotating Machinery and

GRS.

Client: Iraq Electricity

Ministry(MOE)

Start Date: 2020

Progress: %20

Page 16: Phone Address

Project: Fiber Optic Cable 48 Inch Gas Pipe Line Naftkhane - Baghdad

Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new

gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length

48" pipeline as the main route including three main branches considered:

• AL-MANSOURIA branch with about 43 Km length 32" pipeline.

• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.

• AL-SADR branch with about 9 Km length 32" pipeline.

•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and

Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the

Baghdad.Activities

26Km Fiber Optic Cable implementation in separate trench for AL-MANSOURIA branch according to

procedure(Include: trench excavation, sand soil under & up the FOC, backfill and FOC Tests.

The 24 core FOC has made Nexans factory from Grecce

Client: Iraq

Electricity Ministry

Start Date: 2017

Progress: %100

Page 17: Phone Address

Project: Cabling, Wiring & Instrument, Commissioning GRS – AL-QUDS

Description: The Iraqi Ministry of Electricity plans to use its natural gas and other countries to

increase electricity production and reduce environmental problems.

Thus, the OPC(a branch of Oil ministry) has implemented, Pipe line and has operated Gas Reducing

Station(GRS) in AL-QUDS power plant.

AL-QUDS power plant Near Baghdad Plays a Key Role in Helping to Meet the Iraq Country's Growing

Energy Needs.

Activities

Procurement, cabling, Wiring, Pre–Commissioning and Commissioning,

Operation, Maintenance AL-QUDS Gas Reducing Station(GRS)

Client: Iraq Oil

Ministry (OPC)

Start Date: 2018

Progress: %100

active

Page 18: Phone Address

Project: (R.O.W) 48 Inch Gas Pipe Line Naftkhane - Baghdad

Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new

gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length

48" pipeline as the main route including three main branches considered:

• AL-MANSOURIA branch with about 43 Km length 32" pipeline.

• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.

• AL-SADR branch with about 9 Km length 32" pipeline.

•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and

Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the

Baghdad.Activities

43 Km Right Of Way(R.O.W)implementation in AL-MANSOURIA branch according to procedure

and Under tight security

Client: Iraq Oil

Ministry (OPC)

Start Date: 2018

Progress: %50

active

Page 19: Phone Address

Project: Civil and Construction implementation – DIBIS Power plant

• Description: The Iraqi Ministry of Electricity(MOE(a branch of Electricity ministry)) plans to build

two new 110-megawatt units to solve the electricity problem in the north of the country.

The equipment of new units (V94/2(SGT5)) will supply by SIEMENS factory.

The DEBIS power plant between Kirkuk and Erbil Plays a Key Role in Helping to Meet the Iraq

Country's Growing Energy Needs.

Activities

Full implementation the Civil and Construction(Include: Pipe Rack, Concrete Sleepers

Full implementation the duct walls for the LFO, HFO, Oil & Gas for Units.

Full implementation the Cable trench for BOP and Units, The trenches under the road

Full implementation & Constructions the Duct Bank for the Units & BOP

Client: Iraq Electricity

Ministry(MOE)

Start Date: 2020

Progress: %20

Page 20: Phone Address

Project: Fiber Optic Cable - 48 Inch Gas Pipe Line

Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new gas pipe

line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length 48" pipeline as the

main route including three main branches considered:

• AL-MANSOURIA branch with about 43 Km length 32" pipeline.

• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.

• AL-SADR branch with about 9 Km length 32" pipeline.

•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and

Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the Baghdad.Activities

Fiber Optic Cable implementation in separate trench with Gas Pipe line, according to OPTASENSE

factory procedure(Include: sand soil under & up the FOC, installation FOC, warning tape, backfill and

FOC Tests, program and install 3M EMS 1421-XR/ID Electronic Ball markers, install FOC

Hellermann Tyton Enclosures from Enlgand), Under tight security

This FOC will use for Gas Leak Detection(GLDS) and Intrusion Detection System(IDS)

The 24 core FOC has made Nexans factory from Grecce.

Client: Iraq

Electricity Ministry

Start Date: 2018

Progress: %80

Page 21: Phone Address

Project: Civil and Foundation implementation - 48 Inch Gas Pipe Line

Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new gas pipe

line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length 48" pipeline as the

main route including three main branches considered:

• AL-MANSOURIA branch with about 43 Km length 32" pipeline.

• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.

• AL-SADR branch with about 9 Km length 32" pipeline.

•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and

Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the Baghdad.Activities

Civil and Foundation implementation for Solar system, Telecommunication Container, VHF Tower in

LBV Stations and Telecom Node

Client: Iraq Oil

Ministry (OPC)

Start Date: 2018

Progress: %100

Page 22: Phone Address

Managing

Director

Executing

Dept

Technical

Dept

Financial

Dept

Administration

Dept

Commercial

Dept

Business

Development

Dept

Quality

ControlProcess

Mechanical

&

Piping

Electrical

Industry

ICT

Civil

Internal

Procurement

overseas

Procurement

Archive

Human

Resources

Project

Control

HSSE logistics

Warehouse

Accounting

Cost

Control

Legal

Dept

Instrument

Page 23: Phone Address

Staff Person

Managers 2

Engineers 10

Suppliers 4

Executive Team 20

Business

Development Team2

Financial &

administration3

Academic

EducationPerson

Ph.D 1

MS 3

BS 9

Technician 7

Diploma 21

Academic Education

Ph.D

MS

BS

Technician

Diploma

Human Resources

manager

engineers

suppliers

executive team

Page 24: Phone Address

Machineries

• Tower Crane

• Lift Truck

• Air Compressor

• Cars

• Trucks

Piping Equipment & Tank Erection

• Welding Diesel Equipment

• Rectifier

• Automatic Cutting Machine

• Plate Rolling Equipment

• Oven

• Tackle Magnet Drill Machine

• Erection Tools

• Hydro test Pumps

• Vacuum Box

• Chain block

Painting & Insulation

• furniture Painting Airless sprays

• Blasting Equipment

• DFT and WFT meter

• Roughness gauge

Electrical & Instrumentation

• Winch

• Cable Cutting Tool

• Conduit Bending Tool

• Calibrating Equipment

• OTDR

• Fusion

• Enclosure Tool kit

General Equipment

Total camera station

Portable Water Storage Tank

Portable Fuel Storage Tank

Container ( 20 & 40 ft )

Electricity Generator

Electrical panels

UPS

Cement Mixer

Scaffold system

Steel frame and jacks

Page 25: Phone Address

The head office of company is allocated in a building with an area of 200m2 and

also with an area of 1000m2 workshop at the hart of business area of Baghdad.

To have a better performance in accomplishing tasks, the office is equipped with

all the required facilities consisting modem computer systems , Internet and

Intranet , technical and project control software to achieve exact reports and

documents. Furthermore, relying on our integrated management system and

SHARE POINT software, we have been trying to omit papers from our

bureaucracy. Our company has been successful in increasing its staff's efficiency

and empowering its relations with through a powerful coordination

Page 26: Phone Address

26

Phone: +964 (0) 773-775 5117

http://www.mwholding.org

[email protected]

Address: No.12/1, 42nd Street, Al-Wahda, Karrada, Baghdad, Iraq