Pilot PPP projects in the
infrastructure of Ukraine
February 2017
Kyiv, Ukraine
Investment opportunities
MINISTRY OF INFRASTRUCTURE
OF UKRAINE
2
KEY DEVELOPMENTS IN PPP LEGISLATION
LEGISLATION
The Interagency Work Group on Concession Legislation Reforming with the participation of
representatives of the Ministry of Infrastructure approved the Concept for Concessions Legal
Framework
The Ministry of Economic Development and Trade with financial support from EBRD is drafting a
new law "On Concession"
The Ministry of Infrastructure is drafting an order of the Cabinet of Ministers of Ukraine regarding the
pilot concession projects in infrastructure
PPP Project Office is working on the methodical recommendations on the implementation of PPP
projects
The work on elaboration of a unified approach to the private sector participation in
modernization of infrastructure and the provision of public services on PPP basis is
underway:
3
RussiaEU
EURussia
Black Sea
STEVEDORING COMPANY “OLVIA”
Key factsTotal area of the seaport: 178.8 ha
Outdoor storage: 277 200 m²; indoor storage: 41 135 m²
Total berth length (7 berths): 1.53 km
Depth near berths: 9.75-11.5 m
Total processing capacity of the port is about 3 mln tones
Main cargos: construction materials, ferrous metals, grain
Train station capacity is 828 wagons / day
1
Revenue (2016)
$15.4 mln
EBITDA margin (2016)
47%
Cargo turnover (2016)
2.2 mln tones
Unique opportunity for the concession in Black Sea region
SC “Olvia”
Located on the west
bank of the Dnieper-Bug
estuary in a Southern
agricultural region of
Ukraine
2.21.8
2.4 2.52.2
2012 2013 2014 2015 2016
Cargo turnovermillion tones
CONCESSION
4
RussiaEU
EURussia
Black Sea
KHERSON SEA COMMERCIAL PORT
Key factsTotal area of the seaport: 47 ha
Outdoor storage: 38 560 m²; indoor storage: 12 328 m² including 3 silos of 608 m² and 12 000 tones capacity
Total berth length (4 berths): 600 m
Depth near berths: 6.9-8.2 m
Total processing capacity of the port is about 2.5 mln tones
Main cargos: grain, construction materials, food products, mineral fertilizers
The port has a sand pit with total reserves of 12 mln tones
2
Revenue (2016)
$7.9 mln
EBITDA margin (2016)
14%
Cargo turnover (2016)
1.2 mln tones
Future potential for development of multimodal cargo hub
Located on both
banks of the
Dnieper river (key
inland waterway in
Ukraine) 28 km
away from the
Dnieper-Bug
estuary and 90 km
from the Black Sea.
1.3 1.31.5
1.7
1.2
2012 2013 2014 2015 2016
Cargo turnovermillion tones
Kherson SCP
Kherson city
CONCESSION
Kyiv
5
RAILWAY FERRY COMPLEX OF THE SEA COMMERCIAL PORT
CHORNOMORSK
Key factsThe Railway Ferry Complex is a part of Sea Commercial Port “Chornomorsk”
The only facility in Ukraine, which handles rail and auto ferry lines, as well as “ro-ro” vessels
It has two berths (#26, 27) with total length of 210 m and one “ro-ro” berth with total length of 269 m (#28)
The depth of port berths is 9.7 m
Total handling capacity is 4.5 mln tones of cargoes in wagons, 150 000 trucks and 250 000 vehicles per year
The complex is a part of rail ferry lines functioning on the Black Sea and the “New Silk Road” trade corridor
3
Revenue (2016)
$3.7 mln
EBITDA margin (2016)
37%
Cargo turnover (2016)
1.8 mln tones
Niche and unique potential for development of Silk Road logistic
Cargo turnovermillion tones
1.4 1.6
2.2
1.41.8
2012 2013 2014 2015 2016
Ferry
complex
CONCESSION
Located on
the north-
western shore
of the Black
Sea in
Chornomorsk
sea port
Ukraine
Russia
Georgia
Turkey
Bulgaria
Romania
6
OUR KEY PARTNERS
PARTNERSHIP
MINISTRY OF INFRASTRUCTURE
OF UKRAINE
Ukrainian Institute for the Future
WWW.SPILNO.IN.UA
Contact details:Ministry of Infrastructure of Ukraine
“SP3ILNO” PPP Project Management Office
14 Peremohy avenue
01135, Kyiv, Ukraine
Artem Khoroshun
Project Manager
Mobile: +38 067 999 45 03
E-mail: [email protected]
Yuriy Husyev
Head of PPP PMO
Mobile: +38 067 440 88 99
E-mail: [email protected]
Taras Boichuk
Project Manager
Mobile: +380 63 585 13 85
E-mail: [email protected]