pingston hydroelectric project application for a project … · 2010-05-26 · successful in this...

96
PINGSTON HYDROELECTRIC PROJECT Application for a Project Approval Certificate Prepared by Canadian Hydro Developers (B.C.) Inc. Klohn Crippen Consultants Ltd. UMA Engineering Ltd. April, 1998 Table of Contents Acknowledgement and Authentication Executive Summary List of Tables List of Figures List of Drawings List of Appendices 1.0 INTRODUCTION 1.1 Background 1.2 Project Purpose and Justification 1.3 Project Overview 1.3.1 Project Location and Access 1.3.2 Project Components 1.4 Project Timing 1.5 Proponent Identification 1.6 Land Tenure and Water Rights 1.6.1 Land Tenure 1.6.2 Water Rights

Upload: others

Post on 08-Aug-2020

3 views

Category:

Documents


0 download