pipeline project news - national fuel gas · pdf fileline d expansion: project milestones...
TRANSCRIPT
![Page 1: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/1.jpg)
Pipeline Project News
Andrew EmhofFacilities Engineer, Interstate Marketing
National Fuel Gas Supply Corp.
Empire Pipeline, Inc.
Appalachian Pipeliners Association Speaker Dinner
May 16, 2017
![Page 2: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/2.jpg)
National Fuel Gas Company
• 1.8 Tcfe Proved Reserves (1)
• 785,000 net acres in Marcellus Shale
• 3 million Bbls/year of crude oil
production in California
• $1.3+ billion midstream investments
since 2010
• Coordinated infrastructure build-out
in Appalachia with NFG Upstream
• 740,000 Utility customer accounts
Upstream
Midstream
Downstream
(1) Total proved reserves are as of September 30, 2016.2
![Page 3: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/3.jpg)
Planned Expansion ProjectsMeeting the Demands of an Evolving Market
![Page 4: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/4.jpg)
Planned Expansion Projects
Northern Access
• Capacity:
• 497,000 Dth/d on NFGSC
• 350,000 Dth/d on Empire
• Market:
• Seneca Resources
• Transportation Path: Seneca’s Clermont production area to TGP 200 Line and Chippawa (TCPL)
• Facilities:
• 99.0 Miles of 16” and 24” pipeline
• New 22,214 HP Pendleton CS
• Enhanced 5,350 HP Porterville CS
• Dehydration facility
• Various M&R facilities
• Project in-service not expected before 2019 due to regulatory delays
Delivery Point
Northern
Access
Chippawa
(TCPL)
Clermont
TGP 200
Line
4
![Page 5: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/5.jpg)
Northern Access: Project Milestones
• Summer 2014: Open season held
• Capacity subscribed by foundation shipper
• Summer 2014-Winter 2015: Conducted environmental and engineering studies
• July 24, 2014: Began FERC Pre-filing process
• March 17, 2015: Submitted initial FERC 7(b)/7(c) applications
• Summer 2015-Winter 2016: Conduct right-of-way negotiations
• November 2, 2015: Submitted amended FERC 7(b)/7(c) applications
• Relocated Pendleton Compressor Station
• February 2016: Submitted NYS DEC 401 Water Quality Certification application
• July 27, 2016: Received favorable FERC Environmental Assessment
• February 3, 2017: FERC 7(c) certificate received
• April 7, 2017: NYS Water Quality Certificate and air permits denied by DEC
• April 21, 2017: Filed petition with US Court of Appeals for the 2nd Circuit
• Anticipate at least a 12-month review before decision ruled
5
![Page 6: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/6.jpg)
Northern Access: Modernized Gas Storage Engine
6
![Page 7: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/7.jpg)
Planned Expansion Projects
Line D Expansion
• Capacity: 77,500 Dth/d
• Market:
• Increased On-System Demand
• Transportation Path: Lamont (TGP 300 Line) to Erie, PA region
• Facilities:
• 4,140 HP of compression at new Keelor CS
• Lamont M&R Upgrades and station modifications
• Satisfied FERC Prior Notice Blanket Requirements in February 2016
• Targeted in-service: Fall 2017
Delivery Point
Line D
ExpansionErie
North East
Lamont
Warren
7
![Page 8: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/8.jpg)
Line D Expansion: Project Milestones
• Fall 2014: Open season held
• 77,500 Dth/d of capacity subscribed
• December 21, 2015: Applied for FERC Prior Notice Blanket Certificate
• February 26, 2016: Received FERC approval
• Summer 2016-Winter 2017: Commence initial construction activities
• Keelor CS site development
• Complete pipeline MAOP remediation work
• Install upgrades at Bowen CS
• Increase meter capacity at Lamont
• April 17, 2017: PADEP Air Permit granted
• Fall 2016-Summer 2017: Construction of mechanical facilities
• Installation of new compressors at Keelor CS
• Commission new facilities
• Fall 2017: Projected in-service date
8
![Page 9: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/9.jpg)
Line D Expansion: Keelor CS Site as of May 2017
9
![Page 10: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/10.jpg)
Planned Expansion Projects
Mainline Extension to Pennsylvania Chemicals Project
• Capacity: 133,000 Dth/d
• Market:
• New ethylene cracker facility being built by Shell Chemical Appalachia
• Other delivery locations as available
• Transportation Path: Holbrook (TETCO) and New MAPP to Potter Township, PA region
• Facilities:
• 4-mile extension from Line N
• Other minor Line N enhancements
• Open Season closed May 4, 2017
• Foundation Shipper signed
• Targeted in-service: July 2019
10
![Page 11: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/11.jpg)
Planned Expansion Projects
Empire North Project
• Capacity: 300,000 Dth/d (scalable)
• Market:
• Negotiating with key subscribers
• Transportation Path: Jackson and Corning (Millennium) to Hopewell (TGP 200 Line) and Chippawa (TCPL)
• Facilities:
• 3 compressor stations
• Other M&R facilities
• No new pipeline construction required
• Open Season closed Fall 2015
• Foundation shipper agreement in place for substantial portion of expansion capacity
• Targeted in-service: As early as November 2019
11
![Page 12: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/12.jpg)
Potential Future Expansion ProjectsBroadening Our Reach
![Page 13: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/13.jpg)
Potential Future Expansions
Line N Expansion
• Replacement of remaining older-vintage pipeline, increasing System Maximum Operating Pressure
• Expand or develop new interconnections with other pipelines (Columbia, DTI, NEXUS, Rover, TETCO, TGP)
• Develop market-area delivery points
Production-related expansions
• Replacement/expansion of existing pipelines in Marcellus/Utica Shale fairway
• Development of new facilities for delivery to TGP, Transco, DTI, or Canada
13
![Page 14: Pipeline Project News - National Fuel Gas · PDF fileLine D Expansion: Project Milestones • Fall 2014: Open season held • 77,500 Dth/d of capacity subscribed • December 21, 2015:](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab6bfdc7f8b9a1a048e2484/html5/thumbnails/14.jpg)
Thank You