Pipelines & Flow Assurance
Angus Macaulay
Subsea Engineering Team Lead
Paradigm Flow Services
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
SUBSEA EXPO 2016
Free the Pigs - Case Study
Angus Macaulay – Subsea engineering co-ordinator
Paradigm Flow Services Ltd
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipeline blockages
blockages occur as the oil cools off in the
colder environment and the cloud point is
reached, wax begins to form.
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipelines
Two regions are identified during this process:
the liquid and gel regions. dissolved wax
molecules moving from the pipe centre toward
the wall due to temperature gradient.
L
G
Pipe wall
Gel region containing liquid oil and precipitated wax
crystals
Liquid region
Dissolved wax moleculesMigrating towards the liquid-gel
Interface where T=WAT
Mass flux of wax molecules from the interface to the pipe wall
Inside Pipe temperature
profile
O Tamb Twat Tl
R, m
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pigging
Pigging;
• Less downtime
• Reduced waste processing
• Improved plant efficiency
• Lower overall service costs
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipeline Overview
Details;
• Constructed in 1968
• 20” ID
• 92 km in length
• 7.9mm Wall thickness (9.5mm at river crossings)
• Design pressure 1280 Psi (88.3 Barg)
• Design Temp 10⁰C – 43.3⁰C
• Total fill volume 17,675 mᶟ
Pipeline Topography200 m
Sea level
River crossings
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Problems with Pigging
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Potential solutions
Options;
• Pumping at higher pressures in both directions
• Volumetric test to approximate blockage location
• Localised Hot oil flush
• Excavation of pipeline
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Potential solutions
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Potential solutions
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Potential solutions
Poor chap
doing the
work
Human
resource
manager
Marketing
manager
IT manager
Technologie
s manager
Logistics
manager
Project
manager
Product
developer
Health
and
safety
PR
manager
Business
analyst
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
48hr from initial call with client
until arrival of crew & equipment
onsite
Pipe-Pulse™ option
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
REVISIONS
No Date Description
JOB NOLATEST REVISION
DRAWING NO SCALE
DRAWN BYCHECKED
N/A
1
Angus Macaulay
Choke valve (CV) PRV
Plug valve (PV)
Ball valve (BV)
Needle valve (NV) PRV dump line
High pressure line
Kinneil site rig up P&ID
PFSL
101A
PFSL
101B
High pressure pump
Tank
Pipe-Pulse units
Control cabin
Data transfer Ethernet cable
Air hydro pump
To Tie in point HV-001 Ref DWG N371-1004
Vent to Sump
Vent to Sump
PT
0732Rev A3 K Thomson
PLR
To Finnart
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Find-Block™ results
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Find-Block™ results
Initial pulse
Reflection
Time response
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
REVISIONS
No Date Description
JOB NOLATEST REVISION
DRAWING NO SCALE
DRAWN BYCHECKED
N/A
1
Angus Macaulay
Choke valve (CV) PRV
Plug valve (PV)
Ball valve (BV)
Needle valve (NV) PRV dump line
High pressure line
Finnart site rig up P&ID
PFSL
101A
PFSL
101B
High pressure pump
Tank
Pipe-Pulse units
Control cabin
Data transfer Ethernet cable
Air hydro pump
HV696 2" RF600 - 2" 1502Pulsing Tie in point
Vent to Sump
PT
0732Rev A3 K Thomson
HV701 4" RF600 - 2" 1502 Flushing Tie in point
Crude feed from HV258. Flanged 4" RF150 - 4" 206
Heat exchanger
Warm fluid out
Cold fluid in
Pipe-Pulse injection Line
Pumping injection Line
Vent to SumpVent to Sump
PLR
To Kinneil
20" Finnart Export line
Heat exchanger
Warm fluid out
Cold fluid in
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Pipe-Pulse™ set up
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Wax removal
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
Success
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
To Conclude
• Ability to pulse into large diameter lines over long distances
• Accurately locate blockage within +/- 50m using Find-Block™
• Reduce/Eliminate the need for pipeline Intervention reducing
costs of pipeline blockages and restrictions
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
It’s time for a Paradigm Shift in Flowline Intervention