DETAIL ENGINEERING DESIGN OF WHP CONTRACT PIPING PRESSURE TESTING DOCUMENT NO. REV . DATE DESCRIPTION PREP’D CHK’D APP’D COMPANY A 23-Aug- 2013 Internal Discipline Check B 03-Sep- 2013 Issued for Review C 18-Sep- 2013 Issued for Approval This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

Upload: hadisupriadi

Post on 14-Dec-2015

70 views

Category:

Documents


9 download

DESCRIPTION

Pressure Test for Piping, including Hydrotest and Pneumatic test

TRANSCRIPT

Page 1: Piping Pressure Testing

DETAIL ENGINEERING DESIGN OF WHPCONTRACT

PIPING PRESSURE TESTINGDOCUMENT NO.

REV.

DATE DESCRIPTION PREP’D CHK’D APP’D COMPANY

A 23-Aug-2013 Internal Discipline Check

B 03-Sep-2013 Issued for Review

C 18-Sep-2013 Issued for Approval

This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

RECORD OF REVISIONThe revisions listed below have been incorporated in this copy of the document.

Page 2: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

REV NO. SECTION PAGE NO. DESCRIPTION OF CHANGES

C All All Issued for Approval

Page 2 of 25

Page 3: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

TABLE OF CONTENTS

1. GENERAL............................................................................................................................................. 4

1.1 Scope of Specification..................................................................................41.2 Definition....................................................................................................41.3 Terminology................................................................................................41.4 Work Not Included.......................................................................................51.5 Codes and Specification...............................................................................51.6 Pressure Testing.........................................................................................6

2. PRODUCT............................................................................................................................................ 7

2.1 Temporary Welded End Closures..................................................................72.2 Temporary Non Welded End Closures...........................................................72.3 Pressure Test Blinds....................................................................................7

3. EXECUTION......................................................................................................................................... 7

3.1 Preparation.................................................................................................73.2 Vessel and Equipment..................................................................................83.3 Instrument..................................................................................................93.4 Test Water Criteria......................................................................................93.5 Test Methods and Pressures for ASME B31.3 Piping Systems.......................103.6 Hydrostatic Testing of Piping Designed for External Pressure......................103.7 Test Preparation-Field Procedure...............................................................123.8 Hydrostatic Test Procedure........................................................................133.9 Pneumatic Test Procedure..........................................................................143.10 Test Records............................................................................................143.11 Test Completion.......................................................................................15

ATTACHMENT – 1.................................................................................................................................... 17

MAXIMUM HYDROSTATIC TEST PRESSURE (PSIG) FOR FLANGES AND VALVES.........................17

ATTACHMENT – 2.................................................................................................................................... 19

STATUS OF INSTRUMENTS DURING PRESSURE TEST......................................................................19

ATTACHMENT - 3..................................................................................................................................... 22

SCHEDULE OF MAXIMUM ALLOWABLE HYDROSTATIC TEST PRESSURE (PSIG) OR THE LISTED TEST BLIND THICKNESS........................................................................................................................ 22

Page 3 of 25

Page 4: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

1. GENERAL

1.1 Scope of Specification

This specification prescribes minimum requirement for the methods, tasks, scope and criteria

during testing installed piping systems. Any deviation from this specification requires written

authorization from EPC Contractor and Company.

1.2 Definition

Company :

Purchaser :

Contractor : The party that carries out all or part of the design, engineering, procurement, construction, commissioning or management of a project or operation of a facility. The Principal may undertake all or part of the duties of the Contractor

Vendor : The Manufacturer of the equipment or the Manufacturer’s agent with the unit responsibility

1.3 Terminology

1.3.1 Category D Fluid Service (ASME B31.3)

Owner’s designation for a fluid service in which all the following apply:

A. The fluid handled is non-flammable, nontoxic, and not damaging to the human tissues.

B. The design gage pressure does not exceed 150 psi (1035 kPa).

C. The design temperature is between minus 20 degrees F (-29 degrees C) through 366 degrees F (186 degrees C).

1.3.2 Category M Fluid Service (ASME B31.3)

Owner’s designation for a fluid service in which the potential for personnel exposure is judged to be significant, and in which a single exposure to a very small quantity of a toxic fluid, caused by leakage, can produce serious irreversible harm to persons on breathing or bodily contact, even when prompt restorative measures are taken.

1.3.3 Damaging to Human Tissues (ASME B31.3)

A fluid which, under expected operating conditions, can harm skin, eyes, or exposed mucous membranes so that irreversible damage may be done unless prompt restorative measures are taken. (Restorative measures may include flushing with water, administration of antidotes, and medication.)

1.3.4 Calculated Test Pressure

The test pressure determined in accordance with Section 3.5 and 3.7, of this specification.

Minimum Test Pressure:

The lowest allowable test pressure gage reading. (The calculated test pressure plus the additional pressure resulting from the static head of the test fluid)

1.3.5 Maximum Test Pressure

The highest allowable test pressure gage reading. (The pressure test rating of the weakest component in the test system.)

1.3.6 Piping

An assembly of piping components being tested at one time using a single test procedure.

Page 4 of 25

C

Page 5: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

1.3.7 Test Temperature

The minimum temperature occurring during the test period of either the metal temperature of the piping being tested (including any vessels or equipment included in the test) or the test fluid temperature.

1.3.8 System Test

A test that includes multiple sections of piping, having the same or different design pressures, but which is tested together at one time using a single test procedure and pressure.

1.4 Work Not Included

The following are excluded from the requirements of this specification:

A. Any package unit previously tested by the Vendor in accordance with the applicable codes.

B. Atmospheric sewers and drains.

C. Plumbing systems, which are tested in accordance with the applicable plumbing code.

D. Lines and systems open to the atmosphere.

E. Instrument piping lead lines between the root valve at the process or utility line and the connected instrument and control piping used to connect air or hydraulically operated control apparatus.

F. Liquid petroleum transportation piping systems under the jurisdiction of ASME B31.4.

G. Gas transmission and distribution piping systems under the jurisdiction of ASME B31.8.

1.5 Codes and Specification

The latest editions of all applicable codes, specifications, and references shall define the minimum requirements applicable to the subject work and no statement contained in this Specification shall be construed as limiting the work to such minimum requirements.

The limits of piping covered by codes other than ASME B31.3 shall be indicated on the P&IDs (piping and instrumentation diagrams). This specification may be used with other sections of the ASME B31 Code and Section 1 of the ASME Code, where applicable.

Wherever conflicts or omissions between codes, specifications, and contract occur, the most onerous condition shall apply. Contractor is responsible for reviewing the list below and informing the Company of any omissions. All conflicts shall be formally brought to the attention of the Company.

1.5.1 Applicable Codes

American Society of Mechanical Engineers (ASME)

ASME B16.1 : Cast Iron Pipe Flanges and Flange Fittings

ASME B16.5 : Pipe Flanges and Flanged Fittings

ASME B16.9 : Factory-Made Wrought Steel Butt Welding Fittings

ASME B16.10 : Face to Face and End to End Dimension of Valves

ASME B 16.11 : Forged Steel Fittings, Socket Welding and Threaded

ASME B16.20 : Metallic Gasket for Pipe Flanges – Ring Joint, Spiral Wound and Jacketed

ASME B16.21 : Non Metallic Flat Gaskets for Pipe Flanges

ASME B16.24 : Cast Copper Alloy Pipe Flanges and Flanged Fittings: Classes 150, 300, 400, 600, 900, 1500, and 2500

ASME B16.25 : Buttwelding Ends

Page 5 of 25

Page 6: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

ASME B16.34 : Valves-Flanged, Threaded, and Welding End

ASME B16.36 : Orifice Flanges

ASME B16.42 : Ductile Iron Pipe Flanges and Flanged Fittings

ASME B16.47 : Large Diameter Steel Flanges NPS 26 Through NPS 60

ASME B16.48 : Steel Line Blanks

ASME B31.1 : Power Piping

ASME B31.3 : Process Piping

ASME B31.4 : Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids

ASME B31.8 : Gas Transmission and Distribution Piping Systems

ASME B36.10M : Welded and Seamless Wrought Steel Pipe

ASME B36.19M : Stainless Steel Pipe

American Petroleum Institute (API)

API 5L : Specification for Line Pipe

API 6D : Specification for Pipeline Valves (Gate, plug, Ball & Check valve)

API Std. 594 : Check Valves: Wafer, Wafer lug & double-flanged type

API Std. 598 : Valve Inspection and Testing

API Std. 600 : Bolted bonnet Steel Gate Valves for petroleum industry

API Std. 602 : Compact Steel; Gate Valves – Flanges, Threaded, Welding and Extended Body Ends

API Std. 603 : Corrosion Resistant Gate Valves, Threaded, welded and flanged

API Std. 608 : Metal Ball Valves – Flanged, Threaded, and Welding Ends

API Std. 609 : Butterfly Valves: Double flanged, Lug and Wafer -Type

API RP 14C : Recommended Practice for Analysis, Design, Installation, and testing of basic Surface Safety System for Offshore Petroleum Platform

American Society for Testing Materials (ASTM)

ASTM A36 : Specification for Structural Steel

1.5.2 Project Specification

WHP-SPT-006 : Receiving, Warehousing, Installation, Cleaning, and Hydrostatic Pressure Testing of Instrumentation

1.6 Pressure Testing

1.6.1 The pressure test shall be performed after the NDE and before the internal cleaning of the pipe.

1.6.2 The calculated and maximum test pressure for each line shall be specified in the Pipe Line List. Additional data, as listed below, shall be provided by EPC Contractors Piping Engineering:

o Equipment test pressures

o Test pressures of special piping components such as ball valves and butterfly valves

Page 6 of 25

Page 7: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

o Special testing instructions and cautionary notes.

2. PRODUCT

2.1 Temporary Welded End Closures

2.1.1 The use of plate for temporary welded on end closures is not allowed.

2.1.2 Materials used for welded on end closures such as caps or blinded flanges must be per project approved piping material (line class) specifications. Project approved welding procedures and welding requirements must be adhered to. Exceptions or deviations to the approved specifications must be approved by the EPC Contractor piping engineer.

2.2 Temporary Non Welded End Closures

When required, non-welded temporary end closures, such as test plugs, must be selected and used per manufacturer’s recommendations and requirements.

2.3 Pressure Test Blinds

2.3.1 Plain test blanks with 1/16 of an inch (2mm) flat non-asbestos full face or ring type gaskets shall be used for blanking flat face, raised face, male and female, and tongue and groove type flanges. Provide full face blanks and gaskets at 125# CI connections. However, where permanent operational blinds are installed, they may be used for field pressure testing.

2.3.2 A field procedure must be established and care taken to ensure the installation and removal of material specified for testing. The following is one method for identifying test material:

Plate material, extra length bolts, and gaskets for testing shall be furnished by the field unless dictated otherwise by contract requirements. The outer periphery (edge) of each test gasket shall be dabbed with a spot of fluorescent yellow paint in 4 spots (90 degree equidistant) prior to installation. End points of studs and heads of bolts shall be dabbed with a spot of fluorescent yellow paint. Refer to Attachment 03 for maximum test pressures at various thicknesses for test blanks

2.3.3 Solution

A. Corrosion Inhibitor

A suitable non-toxic rust inhibitor for hydro testing of clean lines, and / or harden inhibitor in lines with stainless steel components

B. Soap Solution

A suitable soap solution for determining leaks during the pneumatic testing of systems.

3. EXECUTION

3.1 Preparation

3.1.1 Prior to initial operation, all installed piping shall be pressure tested except where otherwise qualified in this specification.

3.1.2 The test shall be hydrostatic using water unless there is a possibility of damage due to freezing; or, if the operating fluid or piping material would be adversely affected by water, any other suitable liquid may be used. Testing of ferritic piping, however, is limited to the temperature restrictions in Section 3.8.7. of this specification.

A. If a flammable liquid is used, its flash point shall be no less than 120 degrees F (49 ۫degrees C) and consideration shall be given to the test environment.

B. If testing with glycol water mixtures to prevent freezing, the disposal problem of the test fluid shall be considered

Page 7 of 25

C

Page 8: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

A. The following systems may be tested pneumatically (with authorization from

B. The weight of the hydro test liquid would overstress supporting structures or pipe wall in a gas, steam, or vapor lines.

C. Lined pipe could damage by the hydro test liquid

D. The instrument air headers shall be tested with dry air. A commodity test as described in Section 3.6.2 of this specification, may be used if the system is complete and the instrument air compressor is operational

E. The process or piping material would be adversely affected by water

3.1.3 Piping identified as Category M Fluid Service shall be subjected to a sensitive leak test in accordance with Section 3.6.7 of this specification, before pneumatic testing

3.1.4 As required, additional testing procedures shall be prepared for testing in the range of 5000 to 50,000 psi to supplement this specification

3.2 Vessel and Equipment

3.2.1 The following shall be excluded from hydrostatic tests:

A. Vessels or equipment supported by other vessels or equipment or by a support structure or foundation, not capable of supporting the hydro test load.

B. Vessels or equipment not capable of sustaining the hydro test load, and those with internals or linings that would be damaged by the test fluid.

C. Vessels, heat exchangers, heater coils and any other package unit that has been tested separately shall not be included in any system test.

D. Expansion joints, filter elements, flame arrestors, steam traps, and rupture discs should not be tested. Protection methods such as isolation through blinding, or removal shall be used.

3.2.2 The following shall be excluded from all pressure tests:

A. Pumps, compressors, and turbines.

B. Equipment and Vendor furnished piping specifically recommended by the Manufacturer not to be tested.

3.2.3 The pressure on any point in vessels or equipment included in the pressure test shall not be greater than the shop test pressure for that equipment as stated on the vessel drawing, Vendor's equipment drawing, or datasheets. In the event the piping test pressure is greater than the vessel or equipment test pressure, the piping shall be disconnected, blinded, and tested separately. If the piping cannot be disconnected (welded connection), one of the following shall be implemented:

A. Written approval from the Vendor to test at the required piping test pressure. Refer to Section 3.5.2. of this specification.

B. Reduce piping test pressure as necessary after review and approval of. Refer to Section 3.5.3. of this specification.

3.2.4 Certain types of exchangers are specifically designed for a low allowable differential pressure between shell and tubes, as stated on the Vendor drawings and datasheets. These should be checked; and, if necessary, test both shell and tubes simultaneously as one system, with the same pressure or exclude both sides from the test.

3.2.5 Pressure vessels with two or more pressure chambers are specifically designed for a low allowable differential pressure between pressure chambers as stated on the Manufacturers' drawings. These should be checked; and if necessary, test all adjacent pressure chambers simultaneously as one system, with the same pressure or exclude all pressure chambers from the test.

Page 8 of 25

C

C

C

C

Page 9: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.3 Instrument

Instrument shall be protected from damage when hydro testing process and utility piping systems. Attachment 02 outlines the status of instruments during testing to ensure protection.

3.4 Test Water Criteria

3.4.1 Care shall be taken to ensure the use of clean water for these tests. A suitable filter should be provided in the filling line, should foreign matter such as sand, rust, or other particles be in evidence in the proposed test water. The use of seawater is prohibited.

3.4.2 Water used for hydrostatic testing of austenitic stainless steel piping, vessels, and equipment including those with austenitic stainless steel claddings, linings, or internals shall conform to the requirements listed below. These requirements also apply to 12 chrome claddings or linings that are welded with austenitic stainless steel weld filler.

A. Water containing more than 200 ppm (Parts Per Million) chlorides shall not be used.

B. Water containing more than 50 ppm but fewer than 200 ppm chlorides shall be treated with an inhibitor of 1.5 percent soda ash and 0.5 percent sodium nitrate. The chloride content of the soda ash and sodium nitrate shall not exceed 500 ppm. These percentages are by weight. Systems containing water with up to 200 ppm chlorides should be flushed with condensate or demineralized water immediately after testing.

C. Water containing fewer than 50 ppm chloride does not require inhibitor treatment.

D. Steam Condensate and Demineralized water that meet the requirements of 3.4.2.C is preferred water

E. Other water sources need to be tested for MIC (Microbiologically Influenced Corrosion Causing Bacteria) by an accredited Biological Testing Laboratory. If MIC is detected, contact EPC Contractor for proper steps to eliminate the bacteria prior to use. The bacteria analysis from the lab is required for proper diagnosis

F. Piping, vessels, and equipment must be drained thoroughly after testing. Where complete drainage is impossible, when other than demineralized water or steam condensate has been used, the system shall be flushed free of all test water using boiler condensate or demineralized water containing 200 ppm hydrogen peroxide with less than 1 ppm chlorides, alcohol, petroleum distillate, or another suitable flushing solution. Hot air drying is not acceptable in lieu of flushing, but water may be blown out of pockets using instrument air or other dust filtered air.

G. It should be noted that risk of pitting corrosion is considerably diminished if the time between pressure testing and start-up is as short as possible. When other than steam condensate or demineralized water has been used and the time is anticipated to be longer than five (5) days, flushing with condensate or demineralized water containing 200 ppm hydrogen peroxide is recommended

H. The above rules also apply to medium and high nickel alloys and ferritic chromium stainless steel where pitting corrosion is a risk

3.4.3 Piping that has been internally cleaned by sandblasting shall be tested after installation using a water solution containing a suitable rust inhibitor. After piping has been tested, it shall be drained and blown dry with air or nitrogen. A suitable corrosion inhibitor not objectionable to process stream shall be used.

3.4.4 Piping that is to be chemically cleaned after installation shall be tested and all repairs made prior to cleaning.

Page 9 of 25

Page 10: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.5 Test Methods and Pressures for ASME B31.3 Piping Systems

3.5.1 Hydrostatic Testing of Piping Designed for Internal Pressure

The hydrostatic test pressure at any point due to Internal Pressure in the system shall be as follows:

A. For a design temperature above the test temperature, the minimum test pressure shall be as calculated by the following equation

Pt=1. 5PStS

whereStS

=6. 5 (maximum) (Equation 1)

Pt = Minimum hydrostatic gage pressure (psi)

P = Internal design gage pressure (psi)

St = Allowable stress at test temperature (psi)

S = Allowable stress at design temperature (psi) (Refer to Table 1, Appendix A, ASME B31.3)

B. Where the test pressure as defined above would produce a stress in excess of the yield strength at test temperature, the test pressure shall be reduced as follows

Pm=2YTD (Equation 2)

Pm = Maximum Test Pressure (psig)

Y = Minimum Specified Yield Strength (psi)

T = Specified Pipe Wall Thickness Minus Mill Tolerance (in)

D = Outside Diameter (in)

3.5.2 If the design conditions of piping attached to a vessel are the same as those of the vessel, the piping and vessel may be tested together at the test pressure of the vessel. However, if the piping may be subject to higher design conditions; if it requires a higher test than the connected equipment; or if the piping is designed for lesser operating conditions than the connected equipment and could be overstressed by a system test, it shall be isolated and tested separately.

3.5.3 Where the test pressure of the piping exceeds the vessel test pressure and it is not considered practical to isolate the piping from the vessel, the piping and the vessel may be tested together at the vessel test pressure, provided approves and the vessel test pressure is not less than 77 percent of the piping test pressure calculated in accordance with Equation 1.

3.6 Hydrostatic Testing of Piping Designed for External Pressure

3.6.1 Lines in external pressure service shall be subjected to an internal test pressure of 1½ times the external differential design pressure but no less than a gage pressure of 15 psi.

3.6.2 Pneumatic Testing

If the piping is tested pneumatically, the test pressure shall be 110 percent of the design pressure. The test procedure shall be in accordance with section 3.9. of this specification.

Page 10 of 25

C

C

Page 11: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.6.3 Hydrostatic-Pneumatic Testing

A combination hydrostatic-pneumatic test is permissible. The pneumatic test pressure shall be in accordance with Section 3.6.2. of this specification. The pressure in the liquid filled portion of the piping shall not exceed that given in Section 3.5.1. of this specification.

3.6.4 Sensitive Leak Test

Piping required to have a sensitive leak test shall be tested by the Gas and Bubble Formation Testing Method specified in Article 10, Section V, of the ASME Code. Sensitive leak test shall be performed after hydrostatic test.

3.6.5 Tightness Test

Except for piping systems identified as Category M Fluid Service, piping systems designed for internal gage pressures at or above 0 but less than 15 psig shall be tested for tightness in accordance with one of the following methods:

A. Hydrostatic

Fill with water to highest point in system and check all joints for leakage

B. Pneumatic

Pressurize system to 5 psi with air or other non-flammable gas and check all joints for leakage using a bubble forming solution.

The fluid handled shall be nontoxic and not damaging to human tissue and have a design temperature within the range of minus 20 degrees F to 366 degrees F (- 29 ºC to 186 ºC ), inclusive.

3.6.6 Initial Service Leak Test for Category D Fluid Service Only (ASME B31.3)

A. A piping system used only for Category D Fluid Service, not previously hydrostatic or pneumatic tested in accordance with this specification, may be tested at the normal operation conditions of the system during or prior to initial operation by examining for leaks at every joint. Commodity testing shall require 's authorization.

B. A preliminary check shall be made at no more than 25 psig pressure when the contained fluid is a gas or vapor. The pressure shall be increased gradually in steps providing sufficient time to allow the piping to equalize strains and to check leaks.

3.6.7 Alternative Tests Approval is required) in services other than Category D Fluid Service

A. In circumstances when neither hydrostatic nor pneumatic tests are considered practical, an alternative test in accordance with Section 3.6.7. B of this specification may be employed if both of the following conditions apply:

A hydrostatic test would do the following:

(1) Damage linings.

(2) Contaminate a process which would be hazardous, corrosive, or inoperative in the presence of moisture.

(3) Present a danger of brittle fracture from low metal temperature during test.

B. A pneumatic test would introduce considerable hazard due to possible release of stored energy in the system or would present a danger of brittle fracture from low metal temperature during test.

3.6.8 Under the conditions stated in Section 3.6.7. A of this specification, the following Alternate Leak Test shall be applied:

A. Welds, including those welds used in the manufacture of welding pipe and fittings that have not been subjected to hydrostatic or pneumatic leak tests in accordance with this specification shall be non-destructively examined as follows:

(1) Butt welds shall be 100 percent radiographed or 100 percent ultrasonically examined.

Page 11 of 25

C

C

C

Page 12: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

(2) All welds, including structural attachment welds, not covered in (1) above, shall be liquid penetrant examined. If the material is magnetic, magnetic particle examination may be used in lieu of liquid penetrant examination.

(3) When heat treatment is required, the above examinations shall be performed after heat treatment.

B. The system or joints to be tested shall be subjected to a sensitive leak test in accordance with Section 3.6.4 of this specification. Joints that have not been hydrostatic or pneumatic tested in accordance with this specification shall be examined for leakage.

C. A flexibility analysis of the piping system shall have been made in accordance with the requirements of ASME B31.3.

3.7 Test Preparation-Field Procedure

3.7.1 Joints, including welds, shall be left non-insulated and exposed for examination during the test, except that joints previously tested in accordance with this specification may be insulated or covered. If a sensitive leak test is required (according to Section 3.6.4. of this specification), all joints mentioned above also shall be left unprimed and unpainted.

3.7.2 Piping designed for vapor or gas shall be provided with additional temporary supports, if necessary to support the weight of the test liquid. If required, temporary supports shall be specified in the pressure test documents.

3.7.3 Lines that are counterweight supported shall be temporarily blocked during testing in order to sustain the weight of the test fluid. Spring hangers that have been provided with stops for carrying the test load normally do not require additional temporary supports; if this is not the case, temporary support must be provided before filling the system.

3.7.4 Before testing, the following procedures shall be carried out:

A. Verify that any required heat treatment has been performed.

B. Piping systems shall have been completely checked (punched out).

C. Lines, vessels, and equipment shall be checked to ensure that the entire system can be completely drained after testing.

D. Vents or other high point connections shall be opened to eliminate air from lines that are to receive a hydrostatic test.

E. System shall be purged of air before hydrostatic test pressure is applied.

Page 12 of 25

C

C

Page 13: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.7.5 Field personnel shall review all vessels and internals in order to determine best method to prevent air entrapment when filling and to prevent vacuum when draining.

3.7.6 Short pieces of piping that must be removed to permit installation of a blind or blank shall be tested separately.

3.7.7 Flanged joints at which a blank is inserted to isolate other equipment during a test need not be tested after blank is removed.

3.7.8 Lines containing check valves shall have the source of pressure located in the piping upstream of the check valve so that the pressure is applied under the seat. If this is not possible, remove or jack up the check valve closure mechanism or remove check valve completely, and provide necessary filler piece or blinds.

3.7.9 When conducting tests at freezing temperatures, the test shall not take more than 4 hours, and special precautions such as warming the line test water shall be observed to avoid freezing damage. Follow precautions to minimize the risk of brittle fracture as noted in Section 3.8.7. of this specification.

3.7.10 Systems that include expansion joints shall be investigated to refer to that any required temporary restraints, anchors, or guides are installed or removed prior to test.

3.7.11 When a pressure test is required to be maintained for a period of time during which the testing medium in the system would be subject to thermal expansion, provision shall be made for relief of any pressure greater than the maximum test pressure.

3.7.12 Piping or sections of piping, to be tested may be isolated by closed valves provided the valve closure is suitable for the test pressure.

3.7.13 Pressure test P&ID’s shall be developed for identifying test packages. Test packages shall be by circuits.

3.8 Hydrostatic Test Procedure

Page 13 of 25

C

Page 14: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.8.1 In order to hydrostatic test as much piping as possible at one time, a systems test may be employed. This test shall include one or more lines and, if possible, connected to vessels and equipment.

3.8.2 The minimum test pressure for a system test shall be such that each line in the system is subjected to a test pressure in accordance with Section 3.5 and 3.7, of this specification.

3.8.3 The maximum system test pressure shall not exceed the pressure test rating of any piping component, or the shop test pressure of any vessels or equipment included in the test system. Maximum test pressures for flanges and valves conforming to ASME B16.5 and ASME B16.34 are given in Attachment 01.

3.8.4 Systems or sections of systems to be tested may be isolated by closed valves, provided the valve body and seat are suitable for the test pressure.

3.8.5 Where a suitable valve is not available, vessels, equipment, or other piping not included in the system pressure test shall be either disconnected from the system or isolated by blinds or other means during the test.

3.8.6 The normal location for the pressure test gauge or recorder is at grade near the pressure test pump. Readings may be made at higher points providing the gage pressure reading and the static head (0.433 psi/ft) between grade and the point of measurement do not exceed the maximum test pressure. Test gauges or recorders shall be tagged with the date last calibrated, and this activity shall be recorded. Test gauges or recorders shall be recalibrated prior to or during use if the previous calibration date exceeds 3 months.

3.8.7 Hydrostatic test pressure shall not be applied until the vessel or equipment and its contents are at approximately the same temperature. To minimize the risk of brittle fracture, pressure tests through vessels and equipment shall not be conducted when the test liquid or metal temperature is below 60 degrees F (15.6 degrees C). Pressure tests in ferritic piping systems that do not include vessels or equipment may be conducted below 60 degrees F (15.6 ۫degrees C) but shall not be conducted when the test liquid or metal temperature is below 40 degrees F (4.5 degrees C).

3.8.8 Hydrostatic test pressure shall be maintained for a sufficient length of time to visually determine whether there are any leaks, but no less than 30 minutes. The pressure test shall be considered satisfactory if no inapplicable pressure loss has occurred during the test. On successful completion of pressure test, hydrotest chart shall be duly signed.

3.9 Pneumatic Test Procedure

3.9.1 Minimum Metal Temperature

At time of testing, the minimum pipe metal temperature shall be as listed below:

Minimum Temperature Nominal Wall thickness

60 degrees F (15.6 ۫۫ºC) Carbon steel 1-1/2 inches and less

60 degrees F (15.6 ۫۫ºC) Post heat treated ferritic 1 inch and less

40 degrees F (4.5 ۫۫ºC) Austenitic steels 1 inch and less

Minimum temperatures for materials not listed above shall be determined by Piping Engineering when required by field construction.

Page 14 of 25

C

C

Page 15: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.9.2 Close control shall be maintained to limit the stored energy and / or the reaction force of gas in any test system. The maximum stored energy level and maximum reaction force level should be calculated and should not exceed 9400KJ for stored energy and 215KN for reaction force.

3.9.3 Clear the test area before bringing the line up to test pressure. It may be desirable to conduct pneumatic tests during weekends when fewer personnel are present.

3.9.4 A pressure relief device shall be provided, having a set pressure no higher than the test pressure plus the lesser of 50 psi or 10 percent of the test pressure.

3.9.5 When the pneumatic test pressure exceeds 15 psig, a preliminary check at 15 psig shall be made to locate major leaks. The pressure shall be increased in gradual steps of 5 psig or 10 percent of the test pressure, whichever is greater.

3.9.6 A double block and bleed valve arrangement shall be included in the pressurizing line to the system being tested. A test pressure gage shall be downstream of the double block. After each pressure step has been reached, close the block valve and open the bleeder to atmosphere. If after a 5-minute period the step pressure is held, proceed to the next step pressure; if not, examine the entire system for leakage.

3.9.7 When the system has been brought up to the test pressure shown on the piping pressure test system record, the pressure shall then be reduced to the design pressure before being examined for leakage. Joints and welds shall be covered with soap solution in order to detect any leakage. Soap shall be a commercial preparation made specifically for leak detection.

3.9.8 Before soaping the joints, the entire line should be walked to determine whether there is any audible evidence of leakage. Any leaks found at the time shall be marked and repaired after first depressurizing the line.

3.9.9 Bolting shall not be tightened while systems being tested are pressured above 30 psig.

3.9.10 Pneumatic test pressure shall be maintained for a sufficient length of time to permit thorough visual inspection of all joint and weld seams but no less than 10 minutes. The contractor is not required to maintain test pressure in excess of 2 hours after notification of EPC Contractor's authorized inspector. Pressure shall be reduced gradually when depressurizing.

3.10 Test Records

3.10.1 Records shall be made of each piping system test utilizing EPC Contractor’s standard forms, when completed, shall be retained in the QC file as a permanent record. These records shall include the following information:

o Date of test

o Identification of piping system and any vessels or equipment tested with the piping system

o Test medium

o Test pressure

o Minimum ambient temperature

o Test medium temperature

o Certification by examiner

o Test results

o Name of test operator

o Minimum metal temperature (if applicable)

o Chart recorder

Page 15 of 25

C

Page 16: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3.10.2 Upon completion of the project, these records shall be transferred to as specified in the Job Closeout Procedure.

3.11 Test Completion

3.11.1 If leaks are found, their location shall be marked, the pressure shall be gradually released, and the piping shall be drained or vented. Appropriate repair or replacement shall be made. The affected piping shall be re-tested at the pressures originally specified for the test. Re-testing of minor repairs or additions may be waived, provided approval of is obtained and the welding is non-destructively examined according to Section 3.6.8. A.2. this specification.

3.11.2 After completion of testing, all temporary blanks and blinds shall be removed, all operating blinds returned to proper position, and all lines and piping components shall be completely drained. Valves, orifice plates, expansion joints, and short pieces of piping that have been removed shall be reinstalled with proper new gaskets in place. Valves that were closed during hydrotest shall be opened to ensure drainage of the bonnet cavity. Lines being drained after testing shall have all vents open. Piping systems downstream of check valves should be inspected to ensure complete drainage.

3.11.3 Direct connected transmitters at orifice flanges must be disconnected when replacing orifice plates to avoid distorting the connections.

3.11.4 Care shall be exercised in controlling the rate of drainage from vessels with respect to the inflow of air through the vent to ensure that the vessel is not subjected to vacuum. After vessels have been completely drained, vents, cyclones, and other internal closures that were opened before testing shall be closed.

3.11.5 After lines have been drained, temporary supports shall be removed, and insulation and painting completed. Spring hangers provided with stops to carry the test load shall have these stops removed.

3.11.6 The following are procedure after test completion:

1. Instruments which were removed or blocked out for test shall be reinstalled and blocks placed in the normal operating position.

2. Bolting and gaskets used for pressure testing shall be removed and replaced with bolts and gaskets specified in the Line Class.

3. Gaskets used for pressure testing shall be removed and replaced with line class gaskets.

4. Check valves that were jacked open or the internals were removed for pressure testing shall be returned to their proper operating position.

5. Vessel and equipment internal closures which were opened specifically for pressure testing shall be closed.

6. Instruments and process lead lines that were subjected to the hydrostatic pressure test shall be blown out with dry air or nitrogen.

7. Vent and drain connections that were added solely for pressure testing shall be closed and seal welded as required. Drains shall have either the valve closed and plugged or, if the valve is removed, the connection plugged and seal welded as required.

8. Painting and insulation shall be completed after inspection of seal welded vents and drains.

9. Strainer screens shall be removed, cleaned, and reinstalled.

End of Specification

Page 16 of 25

C

Page 17: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

Page 17 of 25

Page 18: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

ATTACHMENT – 1

MAXIMUM HYDROSTATIC TEST PRESSURE (PSIG) FOR FLANGES AND VALVES

Maximum Hydrostatic Test Pressure (psig) For Flanges And Valves

MaterialFlange Rating

Carbon Steel Carbon Moly

CR – Moly Stainless Steel

Page 18 of 25

Page 19: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

(Class)

Normal (1.1) C 1/2 (1.5)

1/2-1/2 11-1/4-1/2(1.9)2-1/4-1(1.10)5-1/2(1.13),9-1(1.14)

304(2.1)316(2.2)321(2.4)347.348(2.5)

304L,316L(2.3)

309(2.6)310(2.7)

Shell Seat Shell Seat Shell Seat Shell Seat Shell Seat Shell Seat

150 450 285 400 265 450 290 425 275 350 230 400 260

300 1125 740 1050 695 1125 750 1100 720 900 600 1025 670

400 1500 990 1400 925 1500 1000 1450 960 1200 800 1350 895

600 2225 1480 2100 1390 2250 1500 2175 1440 1800 1200 2025 1345

900 3350 2220 3150 2085 3375 2250 3250 2160 2700 1800 3025 2015

1500 5575 3705 5225 3470 5625 3750 5400 3600 4500 3000 5050 3360

2500 9275 6170 8700 5785 9375 6250 9000 6000 7500 5000 8400 5600

Notes:

1. The above chart is based on ASME B16.5, and provides the maximum allowable hydrotest pressures of 1/2-inch through 24-inch flanges (shell test) and flanged and standard class weld end valves (shell test, with valve open and seat test, with valve closed). Seat test is based on ASME B16.34, Paragraph 2.5.3.

2. Flanged valves manufactured according to API-600 and API-602 may be tested in accordance with the above chart. Carbon steel, Normal (1.1), 800# scrd. or S.W. valves manufactured according to API-602 and API-606 may be tested to 3000 psig (shell test) or 1975 psig (seat test).

3. For valves not conforming to the above standards or ASME B16.5, the Manufacturers' recommended test pressure limits for both shell and seat shall be used.

4. Maximum test pressures for flanges and valves over 24 inches and piping components not covered by this chart shall be provided by EPC Contractor Piping Engineering as applicable.

5. The maximum test pressure for pneumatic testing shall not exceed 75 percent of the stated values.

Page 19 of 25

Page 20: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

ATTACHMENT – 2

STATUS OF INSTRUMENTS DURING PRESSURE TEST

Page 20 of 25

Page 21: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

Status of Instruments during Pressure Test

1.0 GENERAL

1.1 This attachment defines additional requirements for pressure testing of instrumentation.

1.2 Pressure testing of instrument process piping after the piping root valve and control pneumatic piping are not covered by this specification.

2.0 SPECIFIC REQUIREMENT

2.1 The status of instruments during pressure testing shall conform to Table 1 on Sheet 2 of this attachment. Instruments not covered in Table 1 shall not be subjected to pressure testing without Owner's authorization.

2.2 When flanged instruments are removed from the test, the flange facings shall be protected over the entire gasket seating surface with hook or plastic covers, securely attached to the instrument, to exclude dirt and other foreign matter from the interior of the instrument and to protect the flange facings.

2.3 When threaded instruments are removed from the test, the threaded ends shall be closed with metal (of the same basic metallurgy as the instrument material) or plastic protectors, to exclude dirt and other foreign matter from the interior of the instrument.

2.4 Orifice tap shutoff valves shall be closed and drain valves shall be opened during testing.

2.5 If spacer plates are required to be installed during testing, to replace removed orifice plates, they shall be installed using test gaskets and test bolting.

2.6 Float type level instruments shall be drained during hydrostatic pressure testing.

2.7 The maximum allowable test pressure for displacer type level instruments shall be verified prior to inclusion in the test. If they shall not stand the test pressure, they shall be blocked from the test and drained.

2.8 Pressure instruments shall have their root valve closed and the drain valve shall be open during testing.

2.9 Analyzer tubing shall be disconnected during testing.

2.10 Control butterfly valves shall be removed during testing.

2.11 Do not reverse flow in Rotameters during testing.

2.12 Test gage may be used if one is furnished.

2.13 Blinds are not required on PSV outlets discharging into a system being tested at 15 psig or less.

2.14 Instruments shall be protected from damage due to freezing. In preparation for cold weather

and during cold weather, all instruments must be drained and process lead lines blown out

with air or nitrogen

Page 21 of 25

Page 22: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

Table 1. Status Of Instruments During Pressure Testing

Block And Vent

Remove For Test

Blank Off

Include In Test

Refer To

1. Analyzers X 2.92. Control valves (excluding pressure

regulators, pressure balanced, and butterfly)

X

Page 22 of 25

Page 23: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

3. Control valves (butterfly) X 2.10

4. Flow instruments (D/P cell and bellows) X

5. Flow instruments (metal tube rotameters) X 2.11

6. Flow meters (positive displacement) X

7. Flow meters (turbine) X

8. Flow indicating switches (bellows) X

9. Flow switches (vane) X

10. Sight and gage glasses X

11. Level instruments (displacer) X 2.7

12. Level instruments (D/P cell and bellows) X

13. Level switches (float) X 2.6

14. Orifice plates X 2.5

15. Pressure gages X

16. Pressure instruments X 2.8

17. PSV’s X 2.13

18. PSV’s TSV’s 3/4” and 1” screwed X

19. Pressure regulators X

20. Pressure switches X

Note: See ---- for reference.

Page 23 of 25

Page 24: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

ATTACHMENT - 3

SCHEDULE OF MAXIMUM ALLOWABLE HYDROSTATIC TEST PRESSURE (PSIG) OR THE LISTED TEST BLIND THICKNESS

Schedule of Maximum Allowable Hydrostatic Test Pressure (psig) For the Listed Test Blind Thickness

Nominal Pipe SizePlateThickness

2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 30" 36"

Page 24 of 25

Page 25: Piping Pressure Testing

PIPING PRESSURE TESTING

DOC NO. : REV. C

1/4" 2,013 931 563 260 153 99 70 58 45 35 29 20 13 93/8" 4,528 2,094 1,267 585 345 222 158 131 100 79 64 45 29 201/2" 8,050 3,722 2,252 1,041 614 395 281 233 178 141 114 79 51 355/8" 12,579 5,816 3,519 1,626 959 617 438 364 278 220 178 124 79 553/4" 8,376 5,067 2,341 1,381 888 631 523 401 317 257 178 114 797/8" 6,896 3,187 1,879 1,208 859 713 546 431 349 242 155 1081" 9,007 4,162 2,455 1,578 1,122 931 713 563 456 317 203 1411-1/8" 5,268 3,107 1,998 1,420 1,178 902 713 577 401 257 1781-1/4" 6,503 3,836 2,466 1,753 1,454 1,113 880 713 495 317 2201-3/8" 7,869 4,641 2,984 2,121 1,759 1,347 1,064 862 599 383 2661-1/2" 9,365 5,523 3,551 2,525 2,094 1,603 1,267 1,026 713 456 3171-5/8" 6,482 4,168 2,963 2,457 1,881 1,487 1,204 836 535 3721-3/4" 7,518 4,834 3,436 2,850 2,182 1,724 1,397 970 621 4311-7/8" 8,630 5,549 3,945 3,272 2,505 1,979 1,603 1,113 713 4952" 9,819 6,313 4,488 3,722 2,850 2,252 1,824 1,267 811 563

Notes:

1. Test blind plates listed in the Plate Thickness Schedule Attachment 3 (above) are intended for use between bolted flanges only. Use of the listed blind plates as welded end closures is not permitted. Also, see Paragraph 2.1 “Temporary Welded on End Closures.”

2. The tabulated pressures above are based on the formula stated in ASME B31.1 or ASME B31.3 using the following:

A. Flat non-asbestos gaskets conforming to ASME B16.21.

B. Structural grade carbon steel plate, ASTM A36 having a minimum specified yield strength of 36,000 psi.

3. For plate that is identified as having a lower minimum yield strength, the allowable hydrostatic pressure must be reduced in accordance with the following formula:

Pma=Yx

Y X Maximum Allowable Hydrostatic Test Pressure (from table above),

where:

Pma = Maximum allowable test pressure

Y = Minimum specified yield strength (= 36,000 psi for ASTM A36 material)

Yx = Minimum specified yield strength for material selected

4. Pneumatic test pressures shall not exceed 50 percent of the values indicated.

Page 25 of 25