planning and scheduling infographic - final copy and scheduling... · title: planning and...

1
Why Maintenance Planning and Scheduling Should be a Key Organizational Initiative Without Proper Planning & Scheduling Only Wrench-On Time 35% 15% Travel time to and from the job 12% Obtaining tools and materials 8% Coordination delays 5% Idleness at job site 5% Excess personal time 10% Authorized breaks 5% Receiving instructions 5% Late starts and early quits 65% Benefits of Investing in Proper Planning & Scheduling Wrench-On Time 65% Non Productive Time? Increase wrench time from 35% to 65% From 2.8 to 5.2 hours of actual work/8 hour shift Eliminate 10% of spare parts required Reduce current staff's backlog of work orders From reactive maintenance to preventive and reliability focused maintenance Efficient repairs and plant back online in less time MAINTENANCE EXCELLENCE Having an effective maintenance strategy that eliminates non-value added activities, maximizes condition based maintenance, and focuses resources on the most critical assets is of vital importance. Doing the right jobs, with the right parts, at the right time is essential.

Upload: others

Post on 05-Jul-2020

53 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Planning and Scheduling Infographic - Final Copy and Scheduling... · Title: Planning and Scheduling Infographic - Final Copy Author: Austin Hellman Keywords: DADmhJczFp0,BADeDP6YKNY

Why MaintenancePlanning and SchedulingShould be a Key Organizational Initiative

Without Proper Planning & Scheduling

Only Wrench-OnTime35%

15%Travel time to and

from the job

12%Obtaining tools and

materials

8%Coordination delays

5%Idleness at job site

5%Excess personal time

10%Authorized breaks

5%Receiving

instructions

5%Late starts and early

quits

65%Benefits of Investing in Proper Planning & Scheduling

Wrench-OnTime

65%Non Productive

Time?

Increase wrench time from 35% to 65% From2.8 to 5.2 hours of actual work/8 hour shift

Eliminate 10% of spare parts required

Reduce current staff's backlog of work orders

From reactive maintenance to preventiveand reliability focused maintenance

Efficient repairs and plant backonline in less time

MAINTENANCE EXCELLENCEHaving an effective maintenance strategy thateliminates non-value added activities,maximizes condition based maintenance, andfocuses resources on the most critical assets isof vital importance. Doing the right jobs, withthe right parts, at the right time is essential.