planning engineer project

4
Proje Repo Build Obj the A ect Master Schedu orting I Estimation ing I Self Motivate jective: - Se organization Successfully c (Full Time) in C Highly astute, Management scale Univers Biggest Unive having Leadin Excellent work 2010, &2013), Hands on exp Construction Strong ability supervision. Skilled at brin Demonstrated motivate and Proven skills planning, Inp Strong team l balance highteam leadersh PR Proj A.Summary of A Email: k ule I Project Plan n I Primavera I M ed I High Rise Bui eeking an op n. ompleted bac Civil Engineeri , energetic an as a Planning sity Projects) a rsity Building s ng Contractor a king knowledg , SAP, Auto CA pertise in man Projects in all to consistent ging together d ability to m provide effect in enhancing rocess Inspect leader builder level skills wit hip, and estab ROJECT PLAN JUNIOR ect Time an f Career and Man DC Address: Am kmmani264 nning I Project tim Microsoft Project I lding I University pportunity to helor’s Degree ng from DSPC d team spirite time/Cost Con nd Middle Eas sector as a Plan and Client (Dev ge and proven t AD, STADDPRO aging, plannin stages/phases tly get tasks d diverse individ manage human ive guidance to overall admin tion, Team Buil and facilitato h maximum p blished skills in NNING ENGI R EXECUTIVE d Cost Mana Expertise: nikanda CE in Civil En mman Street, 488@gmail.c me & Cost Contro SAP I Auto Cad Building I MEP I C Curric o utilize my e (Full Time) in in India. d Professiona ntrols, QS, Exe st/Gulf Out of w nning/Project veloper) backg track record o O, PCM (Primav g, scheduling, s like pre desig done despite d duals, organiza n, financial an o a team of pro nistration, wel lding, Client Int r, fostering an roductivity. Ca gathering, co INEER/ E agement an.M Mut ng, B.Eng. in , Block No 1 com I Contac ol I Process Coor I StaddPro I PCM Civil Engineering I culum Vita y knowledge n Civil Enginee l with an expe ecution, Sched which 1.3 year Time Managem ground. n Primavera (V vera Contract costing, Budg gn, design, predifficult securi tions, and cult nd material re ofessional and l versed with teractions and n atmosphere apability to ha ollating, and ut thumani Civil Eng. 11, Salmiya, ct Cell No: + rdination I Task M M Project Contract Construction Ma ae e and skills ering from Kar erience of 4ye ule MS Project rs in large scale ment Schedule VersionsP3.0, Management) geting, QS, Exe construction, ity environme tures to work t esources towa d support staff. efficiently ha d coordination that motivate andle pressure tilizing data ef i Kuwait. 965 663454 Monitoring I Plan t management I nagement I to contribu rpagam Univer ears of out of w t in India (High e projects Con er in Primaver , P5.0, & P6.0) ). ecution, coordi construction, a nts and unde towards a com ards achieving . andling all act with internal D es highly talent e, healthy plan fficiently. 422 ns Operations Ana Engineering I Lea te construct rsity in India a which 2.9 year h Rise Building struction of W ra P6 and orga , Microsoft Pro inating, and co and handing o r minimal res mmon goal. g stated targe tivities involvin Departments. ted profession nning, organiza Page 1 of 4 alysis I Projects adership I Team tively to nd Diploma rs in Middle g and large World’s nizations oject (2007, ontrolling of ver. sources and ets, to lead, ng resource nals to ational and

Upload: muthu-manikandan

Post on 12-Apr-2017

53 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: Planning Engineer Project

 

 

Proje

Repo

Build

       

Objthe

 

 

 

A

ect Master  Schedu

orting  I Estimation

ing I Self Motivate

                       

jective: - Se organization

Successfully c

(Full Time) in C

Highly astute,

Management

scale  Univers

Biggest Unive

having Leadin

Excellent work

2010, &2013),

Hands on exp

Construction 

Strong  ability 

supervision. 

Skilled at brin

Demonstrated

motivate and 

Proven  skills 

planning, In‐p

Strong team l

balance high‐

team leadersh

PR

Proj

A.Summary of

AEmail: k

ule  I Project Plan

n  I Primavera  I M

ed I High Rise Bui

                       

eeking an opn.

ompleted bac

Civil Engineeri

, energetic an

as a Planning 

sity Projects) a

rsity Building s

ng Contractor a

king knowledg

, SAP, Auto CA

pertise  in man

Projects in all 

to  consistent

ging together 

d  ability  to  m

provide effect

in  enhancing 

rocess Inspect

 leader builder 

level skills wit

hip, and estab

ROJECT PLANJUNIOR

ect Time an

f Career and 

ManDC

Address: Amkmmani264

nning  I Project  tim

Microsoft Project  I 

lding I University 

                       

pportunity to

helor’s Degree

ng from DSPC 

d team spirite

time/Cost Con

nd Middle Eas

sector as a Plan

and Client (Dev

ge and proven t

AD, STADDPRO

aging, plannin

stages/phases

tly  get  tasks  d

diverse individ

manage  human

ive guidance to

overall  admin

tion, Team Buil

 and facilitato

h maximum p

blished skills in

NNING ENGIR EXECUTIVEd Cost Mana

Expertise: 

nikandaCE in Civil Enmman Street,[email protected]

me & Cost  Contro

SAP  I Auto Cad 

Building I  MEP I C

                       

Curric

o utilize my

e (Full Time)  in

in India. 

d Professiona

ntrols, QS, Exe

st/Gulf Out of w

nning/Project 

veloper) backg

track record o

O, PCM (Primav

g, scheduling, 

s like pre desig

done  despite  d

duals, organiza

n,  financial  an

o a team of pro

nistration,  wel

lding, Client Int

r, fostering an

roductivity. Ca

 gathering, co

INEER/         E agement

an.MMutng, B.Eng. in , Block No 1com I Contac

 ol  I Process Coor

I StaddPro  I PCM

Civil Engineering I 

                       

culum Vita

y knowledge

n Civil Enginee

l with an expe

ecution, Sched

which 1.3 year

Time Managem

ground.  

n Primavera (V

vera Contract 

costing, Budg

gn, design, pre‐

difficult  securi

tions, and cult

nd  material  re

ofessional and

l  versed  with 

teractions and

n atmosphere 

apability to ha

ollating, and ut

           

thumaniCivil Eng. 

11, Salmiya, ct Cell No: +

rdination  I  Task M

M Project Contract

 Construction Ma

                       

ae 

e and skills

ering from Kar

erience of  4 ye

ule MS Project

rs in large scale

ment Schedule

Versions‐P3.0,

Management)

geting, QS, Exe

‐construction, 

ity  environme

tures to work t

esources  towa

d support staff.

  efficiently  ha

d coordination 

 that motivate

andle pressure

tilizing data ef

i

Kuwait. 965 663454

Monitoring  I Plan

t management  I   

nagement I 

                       

to contribu

rpagam Univer

ears of out of w

t in India (High

e projects Con

er in Primaver

, P5.0, & P6.0)

).  

ecution, coordi

construction, a

nts  and  unde

towards a com

ards  achieving

.  

andling  all  act

with internal D

es highly talent

e, healthy plan

fficiently.  

422 

ns Operations Ana

Engineering  I Lea

         

te construct

rsity  in India a

which 2.9 year

h Rise Building

struction of W

ra P6 and orga

, Microsoft Pro

inating, and co

and handing o

r minimal  res

mmon goal. 

g  stated  targe

tivities  involvin

Departments.

ted profession

nning, organiza

Page 1 of 4

alysis  I Projects 

adership  I Team 

  

tively to

nd Diploma 

rs in Middle 

g and large 

World’s 

nizations 

oject (2007, 

ontrolling of 

ver. 

sources  and 

ets,  to  lead, 

ng  resource 

nals to 

ational and 

                

Page 2: Planning Engineer Project

 

 

 

headof th

 

B.

Compan

Project 3: 

Wwithin theinvolved i 

Company

CompanyConstructcertificati

Position: 

Reporting

Project: SAncillary 

Project Su(Green/ShInfrastruc

Project Co

Client: Ku

PM/ CM: 

Consultan

Subcontr

Compan

Project 2: Working a

d office(HO), Rhe project and 

Company

Companywater supactively in(IMS) Cer

Position: 

Reporting

Project: P

Project Supropertieb) The Bu5500 Sqmarea has b–G+15 Flo

Project Co

Client: M/

PM/ CM: 

 Professional

y Name: Ahm

:‐  

Working as a Pe project for Coin the project. 

y Type: Lead Co

y Summary: Sintion Sector witon. 

Planning Engi

g to: Senior pla

Sabah Al SalemBuildings. (Bid 

ummary: Projehade/Tunnel Hcture developm

ost: Kuwaiti Di

uwait Universit

Turner Projac

nt: CCI/ SSH Jo

actor: Kharafi 

y Name: East

:‐ Prestige Falc

as a Project PlaRegional Officework related c

y Type: Lead Co

y Summary: ECpply and sewernvolved in bothrtified Compan

Assistant Plan

g to: Projects M

Prestige falcon

ummary: a) It es Pvt Ltd Calleuilding consist om in Each floor been divided inoor – 375 Sqm,

ost: 76 Core In

/s. prestige Est

M/s. prestige 

l Experience:

madiah Contr

Planning engineontractor and 

ontractor 

nce its presencth many prestig

neer‐Junior  Ex

anning enginee

m University CiPack 6A and B

ect includes CivHouse), and 3 Ament.       

inar 73 M (USD

ty Construction

s Joint Venture

oint Venture 

National (MEP

t Coast Const

con Tower‐ Ka

anning Enginee(RO), Project mcommunication

ontractor 

CCI’s expertise rage and poweh urban and runy 

nning Engineer

Manager and m

n towers – HO f

is a constructid ‘Prestige Falcof Two BasemeWhich covers n to four parts , Tower 4 –G+1

ndian Rupees   

tates propertie

Estates prope

(Total 4 years

racting and Tr

eer (Junior Exeaccountable fo

ce from 1954, tgious projects 

xecutive (at Pr

er and Projects

ty‐ Kuwait UnBid Pack 6B) 

vil and MEP woAncillary Buildi

D 260 M)           

n Program (Min

e                      

P) 

tructions and

rnataka, Bang

er and QS of thmanager and Cn with all parti

in constructioner projects & Faural infrastruct

r and Quantity

manager Plann

for overall Pres

on of High Risecon Towers’ inents below Grotower area of as under. Tow19 floor‐ 375 S

 

es Pvt Ltd 

rties Pvt Ltd 

s= 1.3 Years in 

rading Comp

ecutive) and resor necessary sc

this company hall over the co

roject Site) 

s Director         

iversity Projec

orks of 23 Shelngs (Police Sta

               

nistry)               

d Industries Lt

alore‐ India (H

he project site oordination wes who’s invol

n spans four brabrication worure developme

y Surveyor(Qs)

ing HO              

stige Group  

e building for tn Brunton Roadound level calle1500 Sqm and

wer 1 – G+26 floqm   

Gulf+ 2.9 Year

any KCSC, Ku

sponsible for ochedule relate

has played leadountry in all sec

                

ct: Constructio

lters, 11 Deckeation/ Life Safe

        

td, India         

High Rice Towe

and responsibwith the site englving in the pro

road categorierks. In its 5 decent and ECCI is

 ‐ (at Project S

            

the corporate od (off M.G.Roaed lower basemd rest of the pooor ‐375 Sqm, 

rs in India): 

uwait City, Ku

overall plannind communicat

ding role in thectors and hold

n of Shelters, D

ed Parking, 3 Nety/ Ground Ma

                       

er building G‐2

ble for overall pgineer, Client eojects.    

es: roads and bcade’s presencs an Integrated

ite) 

office of M/s. pd), Bangalore‐ment and uppeortion called PoTower 2 –G+2

uwait  Feb 20

ng department tion with all pa

e developmenting TUV ISO 90

Decked Parking

Nursery Buildingaintenance), a

  May 2012 t

2, G+26, Upper

project requireengineer to ge

bridges, buildine, the compand Managemen

prestige Estate25. er basement modium area. Th23 floor‐ 375 Sq

Page 2 of 4

015 Till date 

operations arties 

t of Kuwaiti  001 

g, & 

gs nd 

to Jan 2015 

r Helipad).   

ement of t progress 

ngs, dams, ny has been nt System 

es 

measuring he tower qm,Tower 3 

Page 3: Planning Engineer Project

 

RK V

requwho

 

  

C.

Project 1:Valley in Kadap

Working auirement for tho’s involve in th

Company

Companywater supactively in(IMS) Cer

Position: 

Reporting

Project: AValley in K

Project Suwater tan21.85 Crslakhs Sft  

Project Co

Client: Go

PM/ CM: 

 

 

Project P1. Successfu

projects tstages /p

2. Having ex3. Accounta

on bi‐wee4. Held resp

Planning 5. Holding e

requirem6. Project  c

comment7. Implemen8. Achieved 9. Implemen

Project C1. Successfu

work.     2. And succe3. And also 

Daily labomonthly, project m

4. Quantity code stan

5. Preparati6. Reducing 

. Key Respon

:‐ APIIT Projectpa District) as a Project Plahe project and he projects.    

y Type: Lead Co

y Summary: ECpply and sewernvolved in bothrtified Compan

Junior Plannin

g to: Projects M

APIIT Project –Kadapa District

ummary: a) Honk inner area P. b) Residentia     

ost: 285 Crs In

overnment of A

RGURK govern

Planning, Moully  completedto achieve Targhases of Constxtensive experible for Power ekly/ fortnightlponsible for draoperation withexpertise  in  iment and With rontrols  orientts for performantation of Primprofitable manted productiv

Cost Control, ully done prep

essfully done csuccessfully coor Productive RDPR, MRP, Ma

monitoring for ctaking from thndard. on of rolling mthe Muster Us

sibilities, Ass

t –Kadapa Dist

anning Engineealso Execution

ontractor 

CCI’s expertise rage and poweh urban and runy. 

ng Engineer (at

Manager and m

–Kadapa Dist – t)  

ostels for Boys enetrant Crystl Quarters (G+

dian Rupees    

Andhra Prades

nment       

onitoring andd  preparation, get within destruction projecience in designPoint Presentaly basis. awing log, prochin projects.  plementation respect to the ed  verificationance managemmavera Contracrgin by using rve project cont

Estimation aaration of Clie

cost loaded Schompleted CostReport DLPR, Saterial Schedulclient PPT, Casehe approved dr

margin for steelsages & Unpro

signments, an

t, Andhra Prad

er at project sitn of residential

in constructioner projects & Faural infrastruct

t Project Site)

manager plann

Andhra Prade

and Girls Phastallization Coat+3) for IIIT staff

                       

sh (AP)               

d Tracking: (Tsubmission,  aired time, costcts. ning all level scation for const

curement log, 

of extension ocontract by lawn  of  subcontrament.  cts Managemeesource levelinrol techniques

and Quantityent bill and ge

hedule L6 levet Report, cost S‐curve for thele, sup contrace flow Statemerawing and pre

l Reconciliationoductively work

nd Achieveme

desh‐ India,(Co

te and respons Building site a

n spans four brabrication worure developme

ing HO              

esh. (Construct

se 1 & 2 (G+3) ting is done to fs & Mentors w

         

Time) and  approval t, HSE, and qu

hedules to findtruction projec

critical issues, 

of time (EOT),ws.  actor’s  cost  co

ent (PCM) to stng for multiples for timely com

y surveyor (Qetting approva

el (SOV), prepato complete (Ce labor and Proct and client bient preparatioeparation for t

n. ks for reducing

ents: 

onstruction of 

sible for overaand work relat

road categorierks. In its 5 decent and ECCI is

           

tion of building

350 rooms & 6avoid the Wat

with 3 Bed room

of master  coality requirem

d critical path cts to the clien

risk assessmen

, recovery, act

ontrol  schedu

tandardize fore projects execmpletion and u

S):(Cost) al  from Client 

aration for the CTC), Revised ogress monitoll checking, Con for the overathe client and s

g cost of the pr

buildings for R

ll project requed communica

es: roads and bcade’s presencs an Integrated

gs for Rajiv Ga

60 Toilets eachter leakages. Tms, 2 Bed room

onstruction  L6ments for Civil a

by using earnet, PM/ CM, co

nt plan, delay a

tion plan and 

ules  to  prepar

ecasting methuted at same tultimately to co

for  the  furthe

client bill progCTC, Budgetinoring, Quantumost control by Sall the project.subcontractor 

roject. 

Rajiv Gandhi Un

irement and hation with all p

bridges, buildine, the compand Managemen

ndhi University

h floor, In ToileTotal Value of tms, Single Bed 

6  schedule  Priand MEP work

ed value methonsultants, and

analysis, and o

modification a

e  analysis  to 

odology manatime.  ontrol cost of p

er project prog

gress by Primavg, Material Re

m and invoice SSAP, Presentat bill progress a

Page 3 of 4

niversity at 

ead office parties 

ngs, dams, ny has been nt System 

y at RK 

et areas and he Block room. 1.5 

imavera  for ks at various 

od (EVM).   head office 

overall 

as per client 

review  and 

agement. 

projects. 

gress of  the 

vera P6.  econciliation Schedule by tion tool for 

as per the IS 

Page 4: Planning Engineer Project

 

 

                

        

         

 

 

 

 

 

 

 

 

 

 

Man

D

E

F

1

2

3

45

  Project Co

1. Supporte

2. Quality co

Complete

3. Demonstr

respect to

4. Interfaced

problems

5. Extracted

milestone

6. Ensured t

Interpreta

   

Bachelor of ECollege/ UnivGrade/ Class: 

Diploma in C

College/ Univ

Grade/ Class: 

 

Engineering 

Languages k

 

I hereby certifThank you for

 

nikandan Mu

D. Educationa

E. Personal In

F. Other infor

1. Personal aBlock No 1Corner of Salmiya, nKuwait. 

2. Email ID:  kmmani26muthu.mk

. Mobile no+965 6634

4. Skype ID: . LinkedIn ID

kw.linkedi

oordination an

d and promote

ollaborated wit

ed as per the co

rated scope ac

o planning and

d with operatio

s. 

d and summariz

es dates, owne

that signed con

ation to suppo

Engineering iversity: KarpagFirst Class wit

Civil Engineer

versity: DhanaFirst Class wit

IT skills:  Prim

   PCM

nown:     Engl

fy that the infor your time for 

uthumani. 

al Background

formation: 

mation: 

address :  11, building nAmman St. &near yiaco Apo

[email protected]@gmail.co: 45422 (Whatskmmani026 D: in.com/in/Ma

nd Control: 

ed Health Safe

th project team

ontrol docume

ccountability to

d scheduling. 

ons, owners, s

zed relevant co

er involvement

ntracts are com

ort implementa

n Civil Engineam University,h Distinction, 7

ring (D.C.E) (D

lakshmi Srinivh Distinction, 8

mavera (Expert

M (Expert); STA

lish (Expert); H

ormation are trreviewing my 

d: 

o 57,  & Al Mughira Sollo medical c

com com  

sAppNo)  

anikandanMu

ty Environmen

m to ensure all

ents and the co

o the project te

uppliers, and s

ontract require

, and liquidate

mmunicated to

ation according

eering (AICTE, Coimbatore, I73 % 

DOTE Accredi

vasan Polytec88.21%  

t); Microsoft P

ADDPRO (Interm

Hindi (Intermed

rue and correctCurriculum Vit

St, center 

uthumani 

nt Program to m

 project work 

ompany’s stand

eams in fulfillin

subcontractors

ements related

ed damage and

o all relevant pa

g to project sch

E Accredited) India 

ited)                

chnic College

roject: (Expert

mediate) 

diate); Tamil (N

t to the best oftae and looking

6. Age: 

7. Passp

8. Gend

9. Marit

10. Driv

License 

11. Nat

12. Cou

13. Date

14. Civi

Mar201

meet the organ

and the compa

dards. 

ng the compan

s to discuss imp

d to project sch

d special clause

arties to provid

hedule. 

                       

                       

, Perambalu

t); SAP (Expert

Native); Telugu

f my knowledgg forward to h

29 

port no: K373

der: Male 

tal Status: Sin

ving License: 

 

ionality: India

untries worke

e of Birth: 26

l ID No: 2880

17)  

nizations objec

any policies an

ny and contract

pact of work a

hedule start an

es. 

de contract vis

                       

                       

ur. 

t);AUTOCAD (E

u (Intermediate

ge and belief.  ear from you. 

38068 (Expire

ngle  

holding Valid

an 

ed in: India, K

6th April 1988 

042605118 (E

ctives. 

nd procedures 

tual objectives

nd resolution o

nd end dates, k

sibility and awa

 June 2009 –

 July 2006  ‐ A

Expert); 

e); Arabic (Bas

 

e on 9th April 2

d GCC & India

uwait 

xpire on16th 

Page 4 of 4

are  

s with 

of 

key 

areness,  

May 2012 

April 2009 

sic) 

2023)