plans for the introduction of a high rate dcp service on msg
DESCRIPTION
Plans for the Introduction of a High Rate DCP Service on MSG. DCP and HRDCP Comparison HRDCP message Overall Planning User and Manufacturer Liaison. DCP Comparison. “Standard” DCP Baud Rate = 100 bps Current Slot allocation = 1min30sec. Timing accuracy = +/- 15 seconds - PowerPoint PPT PresentationTRANSCRIPT
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 1
Plans for the Introduction of a High Rate DCP Service on MSG
• DCP and HRDCP Comparison• HRDCP message• Overall Planning• User and Manufacturer Liaison
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 2
DCP Comparison
“Standard” DCP
Baud Rate = 100 bps
Current Slot allocation = 1min30sec.
Timing accuracy = +/- 15 seconds
Data per DCP message = 649 bytes
Channel bandwidth MTP = 3KHz
Channel Bandwidth MSG = 1.5 KHz
Max nb of messages per channel per day = 760
High Rate DCP
Baud Rate = 1200
Slot allocation = 10 sec minimum
Timing accuracy = +/- 0.5 seconds
Data per DCP message min 653 bytes for 10 second time slot.Channel Bandwidth = 2.25 KHz
Max nb of messages per channel per day = 10800
Maximum message size single message = 65535 bytes
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 3
HRDCP Message format
Header Platform DataCRC
Trailer
4 2 1 2 3
DCP Address
31
Res .
1
Platform Data
Length
16
Sequence
Counter
8
Engineering Information
Version
3
Type
1
Compr .
2
Health
10
Spare
24
12 bytes 4 bytes
1 – 65535 bytes ( but also TX time limited )
Bits
Bytes
MSB
Sent First
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 4
Main HRDCP characteristics
• Support lossless compression • Scrambled and encoded, using a convolutional
concatenated encoder – RS (255,232) as inner code –• Modulation modes:
– CMM1: unmodulated carrier only,– CMM2: BPSK modulation for preamble and ASM,
and– CMM3: OQPSK for HRDCP coded message frame.
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 5
Overall Planning
• Phase 1- DCP Receiver Prototype Testing with standard DCPs – November 2009
• Phase 2- DCP Receiver Prototype Testing with HRDCPs – 3rd Quarter 2010
• Phase 3 - Operational Implementation – End 2010
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 6
Users and Manufacturers Liaison
• September 2009 EUMETSAT Meteorological Satellite Conference – A poster presented at the conference with information about HRDCPs.
• DCP Flyer– A EUMETSAT DCP Flyer will be produced describing the Meteosat Data
Collection System and highlighting the benefits of HRDCPs. This is planned for 4th quarter 2009.
• HRDCP Workshop– This workshop is planned for 15th of March 2010 aimed at DCP
manufacturers and large DCP Operators and will cover:– Overall HRDCP implementation plan– Detailed discussion of the HRDCP specifications – Manufacturers plans for the introduction and marketing of
HRDCPs– HRDCP certification process
EUM/OPS/09/VWG/003 M. HornyIssue 1 – 27-29 October 2009 Page 7
CONTACT
EUMETSATMichel Horny:E-mail: [email protected]: +00 49 6151 807 891Fax: +00 49 6151 807 304