platform for smart, inclusive & sustainable city region metro cebu

16
Platform for Smart, Inclusive & Sustainable City Region Metro Cebu Development and Coordinating Board

Upload: lelien

Post on 27-Dec-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Platform for Smart, Inclusive & Sustainable City Region

Metro Cebu Development and Coordinating Board

OF 136 CITIES: MOST WATER STRESSED

ONLY 2% FOREST COVER

INCREASING VOLUME OF WASTE and FLOODWATER

CEBU: Its Present Challenges

INCREASING TRAFFIC

Clear and Present Danger: Effects of Ground Water Over-Extraction

1986 USC WRC STUDY:

19,000 PRIVATE WELLS

IN METRO CEBU

2009 MCWD SURVEY:

15,000 PRIVATE WELLS

in MACTAN ISLAND ALONE

1995 AYALA LAND STUDY:

3.6 -7.4 X EXCEEDED SUSTAINABLE CAPACITY OF AQUIFERS

1st Green Line: 250 ppm 2nd Green Line: 50 ppm Blue: 50 – 250 ppm Green: 250 – 500 ppm Yellow: 500 – 10,000 ppm Red: Saltwater

INCREASING SALTWATER INTRUSION

Weak enforcement of environmental laws

There is a need to strengthen the IMPLEMENTATION & ENFORCEMENT

of these laws.

How can we make Cebu: Smart

Inclusive Sustainable & Resilient

6

MCDCB Metro Cebu Development and Coordinating Board

What gets planned, gets done. Peter Drucker

13 cities and municipalities in 1 province

covering Metro Cebu as subscribed to by the

Metro Cebu Development and Coordinating Board

(MCDCB)

20% of Total Area 67 % of

Population

DENR – Environment al

Management Bureau

(EMB) Department of Environment

& Natural Resources

MEGA CEBU

Our shared IDENTITY Our common GROUND Our collective FUTURE

Department of

Public Works & Highways

GOVERNOR Chairperson

PRIVATE SECTOR / CIVIL SOCIETY

Co-Chairperson

MAYOR Co-Chairperson

MCDCB

RPOD - PMO

Chair, Committee on Integrated Development & Planning

Chair, Committee on

Environment & Public Safety

RDC 7

NEDA 7

Chair, Committee on Human

Resources, Assets & Partnerships

Chair, Committee on ICT

& Knowledge Management

NEDA Secretariat

MCDCB RPOD EXECOM

RDC Res. 10 (S.2011)

RDC Res. 26 (S 2012)

MCDCB Organizational

Structure

10 AREAS OF COOPERATION

1) Integrated development, urban and land use planning and zoning

2) Transport and traffic management

3) Pollution control and solid waste disposal & management

4) Flood control, drainage and sewerage system

5) Public safety and security

6) Road improvement and infrastructure development

7) Urban renewal and shelter

8) Coastal resources and watershed management

9) Climate change adaptation and disaster risk reduction

10) Health & sanitation and environmental management

11

Roadmap Study for Sustainable Urban Development of Metro Cebu

4 STRATEGIES

7 SUB-ROADMAPS

1 Metropolitan

Competitiveness

Enhancement

Competitiveness

2 Urban Structure and

Land Use

Mobility 3 Urban Transport and

Highway Network

4 Water Supply and

Disposal

Management

Livability

5 Solid Waste

Management

Metropolitan

Management

6 Smart SRP

Development

7 Metropolitan

Administration

An Overall

Roadmap

integrating 7

sub-roadmaps

1 5

NAME STAKEHOLDERS STATUS (As of September 2015)

1 Investment Promotion by MCIB through Mega Cebu Branding

Private Sector, DTI, PEZA, NEDA, LGU, MCDCB, etc Tourism branding (Mega Cebu & CCCI)

2 Urban Greening Private Sector, NGO, DENR, DPWH, NEDA, LGU, MCDCB

Green loop (NEDA/RLUC & USC CAFA)

3 Operationalization of the Mega Cebu Spatial Plan DOST, HLURB, NEDA, LGU, MCDCB Resolutions being obtained from LGUs; Focus area proposed for OECD policy study

4 Mass Transit Network Development (BRT/LRT/MRT)

NGO, LTFRB, DOTC, DPWH, NEDA, LGU, MCDCB TOR drafted; DOTC submitted request to JICA

5 Mactan Link Development MCIAA, DOTC,DPWH, NEDA, LGU, MCDCB To be included in Project Item 4

6 Urban Fringe Highway Network Development NGO, DENR, DPWH, NEDA, LGU, MCDCB TOR to be drafted

7 Integrated Road Traffic Management Road Users, LTO, LTRFB, DPWH, NEDA, LGU, MCDC Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” proposed to JICA

8 Gateway Development (Airport and Seaport) Users, Private Sector, CPA, MCIAA, DOTC, NEDA, LGU, MCDCB

Seaport (Facilitated by DOTC / CPA)

9 Surface Water Resource Development NGO, MCWD, Other Water Suppliers, DENR, DPWH, NEDA, LGU, MCDCB

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA; MCWD resolution (lead role)

10 Urban Septage/Sewerage Service NGO, MCWD, Other Water Suppliers, DENR, DPWH, NEDA, LGU, MCDCB

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA

11 Comprehensive Flood Control NGO, DENR, DPWH, NEDA, LGU, MCDCB Consultant group chosen; awarded; NTP to be issued and contract to be signed (DPWH)

12 Metropolitan Solid Waste Management NGO, DENR, DOST, NEDA, LGU, MCDCB, Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA

13 Advance Energy Management System SRP Investors/Tenants, VECO, Energy Solution Companies, DOST, NEDA, LGU, MCDCB, etc

To be referred to the Cebu City Government

14 Institutional Building of Metropolitan Governance

NGO, Private Secotr, DILG, NEDA, LGU, MCDCB Proposed “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA; RPOD facilitating policy dev. process together with TWG

PROPOSED ANCHOR PROGRAMS (14 Programs)

1 5

Project Titles Type EA Status

(As of September 2015)

1 Master Plan Study and FS on Mass Transit Network Development (BRT/LRT/MRT) for Metro Cebu

Study • DOTC TOR drafted; DOTC submitted request to

JICA

2 Update of the Integrated Development Master Plan of Cebu Province

Study • NEDA TOR drafted; and submitted (NEDA / Cebu

Province)

3 Construction of the Mactan North Dual-Mode Bridge Project • DPWH-DOTC To be included in Project Item 1

4 Construction of Mananga II Dam Project • MCWD , LGU • MCWD-LGU JV

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA; MCWD resolution (lead role)

5 Construction and Networking of Septage Plants Project • MCWD and other

Water Districts

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA

6 A Comprehensive Study for a Cebu Integrated Flood and Drainage System Master Plan (committed)

Study • DPWH Consultant group chosen; awarded; NTP

to be issued and contract to be signed (DPWH)

7 FS on Sea Gateway Port Construction (committed) Study • DOTC & CPA Facilitated by DOTC / CPA

8 A Comprehensive Solid Waste Management Master Plan for Metro Cebu

Study • MCDCB & LGUs Included in the “Project for

Strengthening Capacity for Urban Development of Metro Cebu” with JICA

9 FS on Area Traffic Control in Metro Cebu Study • DPWH, MCDCB &

LGUs

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA

10 Establishment of a Technical Research and Planning Unit of MCDCB & Its Capacity Development

IB • NEDA, MCDCB &

LGUs

Included in the “Project for Strengthening Capacity for Urban Development of Metro Cebu” with JICA; Policy development process with TWG

TEN (10) FLAGSHIP PROJECTS (Actions in 2015-2017)

MEGA CEBU 101: BASICS OF ENGAGEMENT

MCDCB

Communicates Educates Engages

Culture of City-Region

Collaboration

Discipline of Research &

Planning

Framework of Smart, Inclusive & Sustainable Development

MEGA CEBU 101: BASICS OF ENGAGEMENT