8
37 NEW LOTS AVE COGENERATION SYSTEM PLAZA RESIDENCES Ƒ MECHANICAL SYSTEMS BC 1704.16 Ƒ HEATING SYSTEMS BC 1704.25 Ƒ FIRE-RESISTANT PENETRATIONS AND JOINTS BC 1704.27 Ƒ ENERGY CODE COMPLIANCE INSPECTION BC 110.3.5 Ƒ HVAC & SERVICE WATER HEATING EQUIPMENT IIB3 Ƒ HVAC & SERVICE WATER HEATING CONTROLS IIB4 Ƒ DUCT PLENUM AND PIPING INSULATION & SEALING IIB5 Ƒ MAINTENANCE INFORMATION IID1 SPECIAL INSPECTIONS/PROGRESS (TR-1) ENERGY CODE COMPLIANCE INSPECTIONS (TR-8)

Upload: others

Post on 12-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

37 NEW LOTS AVECOGENERATION SYSTEM

PLAZA RESIDENCES

□ MECHANICAL SYSTEMS BC 1704.16

□ HEATING SYSTEMS BC 1704.25

□ FIRE-RESISTANT PENETRATIONS AND JOINTS BC 1704.27

□ ENERGY CODE COMPLIANCE INSPECTION BC 110.3.5

□ HVAC & SERVICE WATER HEATING EQUIPMENT IIB3

□ HVAC & SERVICE WATER HEATING CONTROLS IIB4

□ DUCT PLENUM AND PIPING INSULATION & SEALING IIB5

□ MAINTENANCE INFORMATION IID1

SPECIAL INSPECTIONS/PROGRESS (TR-1) ENERGY CODE COMPLIANCE INSPECTIONS (TR-8)

Page 2: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION MECHANICAL FLOW DIAGRAM

Page 3: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION HOT AIR EXHAUST & FLUE LAYOUTCOGENERATION MECHANICAL PIPING LAYOUT

Page 4: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION DUCT WORK DETAILCOGENERATION FLUE DETAIL

COGENERATION WATER PIPING DETAIL

Page 5: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION CELLAR PLUMBING LAYOUT

Page 6: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION GAS RISER DIAGRAM

COGENERATION GAS CONNECTION DETAIL COGENERATION WATER PIPING DETAIL

Page 7: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION CELLAR ELECTRICAL LAYOUT

Page 8: PLAZA RESIDENCES 37 NEW LOTS AVE COGENERATION SYSTEM · plaza residences mechanical systems bc 1704.16 heating systems bc 1704.25 fire-resistant penetrations and joints bc 1704.27

COGENERATION ELECTRICAL ONE LINE DIAGRAM