  • 7/31/2019 PM Overview1

    1/22

    ByRam Mohan B

    Over View

  • 7/31/2019 PM Overview1

    2/22

    Insert Prospect

    Logo on SlideMaster

    Overview Planned Maintenance

    Breakdown Maintenance

  • 7/31/2019 PM Overview1

    3/22

    Insert ProspectLogo on Slide

    Master

    PM Business Process

    Maintenance

    Notification OR

    MaintenanceOrder

    OR

    ConfirmationTechnical

    completion

    Business

    completion

    Settlement

    Schedule

    Maint plan

    Maintenance

    Plan

    Service

    Acceptance

    Without Notification

  • 7/31/2019 PM Overview1

    4/22

    Insert ProspectLogo on Slide

    Master

    Schematic of PM Master data

    Characteristic-1

    Characteristic-2

    Characteristic-3

    Class

    Functional

    Location

    PLANNING PLANT

    MAINTENANCE PLANT-1 MAINTENANCE PLANT-2

    Equipment - 1

    Equipment - 2

    Equipment - 3

    TECHNICAL OBJECTS

    Bill of material

    Eqpt. BOM

    Func. Loc BOM

    Matl BOM

    Maintenance Plan

    Maint. Strategy

    Task List

    Operation 010

    Operation 020

    Operation

    030

    Work Center

    Work Center

    Work Center

    COST

    CENTER

    Install

  • 7/31/2019 PM Overview1

    5/22

    Insert ProspectLogo on Slide

    Master

    Functional Location

    Place at which a maint. task is to be performed.You can structure according

    Functional criteriaExample:"pumping station", "drive unit"

    Process-related criteriaExample:"polymerization", "condensing"

    Spatial criteria

    Example:"hall", "location"

  • 7/31/2019 PM Overview1

    6/22

    Insert ProspectLogo on Slide

    Master

    Equipment

    Equipment is an individual object that isto be maintained independently

    equipment can be installed anddismantled at functional locations

  • 7/31/2019 PM Overview1

    7/22

    Insert ProspectLogo on Slide

    Master

    Maintenance Strategy

    Eg: Maint. Of pressurized tank

    Package1: Routine Inspection monthly

    Package2: Pressure check every 6 months

    Package3: Total overhaul every 12 months

  • 7/31/2019 PM Overview1

    8/22

    Insert ProspectLogo on Slide

    Master

    Measuring Points and Counters

    use in the following situations:

    You want to document the condition of a

    technical object at a particular point in time.

    You want to perform Counter based Maint.

    You want to perform Condition based Maint.

  • 7/31/2019 PM Overview1

    9/22

    Insert ProspectLogo on Slide

    Master

    Maintenance Notification

    Purpose

    Describe the exceptional technical condition atan object

    Request the maintenance department toperform a necessary task

    Document work that has been performed

  • 7/31/2019 PM Overview1

    10/22

    Insert ProspectLogo on Slide

    Master

    Maintenance Notification Types

    Problem Notification(Notification of a malfunction or problem that has occurred)

    Maintenance Request(Request for tasks to be performed)

    Activity Report(Documentation of activities that have been performed)

  • 7/31/2019 PM Overview1

    11/22

    Insert ProspectLogo on Slide

    Master

    Features Of Notifications

    Automatically copies all the relevant object data

    Plan tasks in detail

    Track work progress

    Enter and settle costs for the maintenance tasks

    When a maintenance notification is technicallycompleted, its data is entered in the maint. history

    (Important when performing evaluations andfuture planning)

  • 7/31/2019 PM Overview1

    12/22

    Insert ProspectLogo on Slide

    Master

    Use

    You can enter all of the above notification typesfor the following objects:

    Functional location

    Equipment

    Material and serial number

  • 7/31/2019 PM Overview1

    13/22

    Insert ProspectLogo on Slide

    Master

    Creation of an Order1.Order for a notification (for similar notifications)

    (Automatically copies data from Notification)

    2.Order directly from notification

    (In particularly urgent cases)

    3.Independent Order

    (by Maint. Dept. Head, Notificn. created later)4.Order & Notification together

    (by authorized Maint. Employee)

    5.Order for Maintenance Plans

    (automatically generated at regular intervals)

  • 7/31/2019 PM Overview1

    14/22

    Insert ProspectLogo on Slide

    Master

    A maintenance Order Must be

    Created when:

    1. A Spare part is required to be issued

    2. External agency is to be engaged

  • 7/31/2019 PM Overview1

    15/22

    Insert ProspectLogo on Slide

    Master

    You can use an order to:

    Plan tasks in detail

    (with regard to type, scope, dates and resources )

    Monitor the execution of tasks

    Define rules for account assignment, settlement

    Enter, assign and settle the costs

  • 7/31/2019 PM Overview1

    16/22

    Insert ProspectLogo on Slide

    Master

    Order Types Available

    Standard For PM:PM01 for maintenance orders (PM)

    Special Orders:PM04 for refurbishment orders (PM)

    PM06 for investment orders (PM)

    SM01 for service orders (CS)

  • 7/31/2019 PM Overview1

    17/22

    Insert ProspectLogo on Slide

    Master

    Notification Vs Maintenance Order

    Notification: Describe the current condition

    Of a tech. Object & outline Maint. Tasks reqd.

    Order: Describe the repairs required in

    Greater detail

  • 7/31/2019 PM Overview1

    18/22

    Insert ProspectLogo on Slide

    Master

    Maintenance Task Lists

    Repeatedly performed Maint. Activities

    1.Reduce the time required to createmaintenance orders

    2.Contain important informationsuch as the spares and tools

  • 7/31/2019 PM Overview1

    19/22

    Insert ProspectLogo on Slide

    Master

    Types of maintenance task lists

    Equipment Task Lists

    Functional Location Task Lists

    General Maintenance Task Lists

  • 7/31/2019 PM Overview1

    20/22

    Insert ProspectLogo on Slide

    Master

    PermitsYou can use permits to ensure that special approval

    must be obtained before orders are executed.

    Can be assigned to :

    Technical objects functional locs. and equipment

    Orders

    Permit categories

    Safety permits

    Work permits

    Access permits

  • 7/31/2019 PM Overview1

    21/22

    Insert ProspectLogo on Slide

    Master

    WHY PM MODULE ????Plant/Mfr-wise equipment analyses

    Cost of maintaining each equipment

    Usage times/locations of each equipment

    Streamlining/Analyzing of routine maintenance

    Automatic orders creation for planned maint.

    Planned Vs Actual costsPurchase request creation for non-stock items

    Break down analyses

    Automatic materials checking/Back flushing

    Work permits/Safety permits creationWarranties