pmt vqp r\
TRANSCRIPT
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 1/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 2/26
V
E
N
T
U
R
E
Venture Mgr
Venture SHE/Quality
Manager
Quality Advisor
RGX - Khoo
RGX2 - Bacon
COP - Kline
Interface
P
R
O
J
E
C
T
Project Quality
Managers
RGX Onshore - Smith
RGX Offshore - McGettigan
RGX2 T 6&7 – Lee
RGX2 AKG2 Mayhall
COP MEI&Power – McGrath
COP Tanks/Camps/Civils - Arriaga Interface
E
P
C
Site Quality
Coordinators
Procurement
Quality Co-ords
Site Inspectors Shop Inspectors Functional reporting relationship
Venture Quality Reporting Interfaces
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 3/26
Venture Quality Process Purpose
Define the RasGas strategy for ensuring quality on RasGas projects and
the Quality Management Process for implementing that strategy
Providing independent objective assessment of compliance and feedback
to management
Venture Quality Process Scope
Scope of the Venture Quality Management Process is applicable to all
RasGas expansion projects, including..
Preliminary design, FEED & Detailed Design
Procurement (contracting and purchasing)
Construction, Installation & Completions
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 4/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 5/26
Venture Quality Process Principles
An oversight role independent of those performing the work is required to
verify compliance and the overall effectiveness of the RasGas and
Venture Quality Management Process
Criticality of work products and activities to assure the integrity of the
completed facility and project execution shall be the primary factor in
determining the level of Quality Management Program application and the
level of oversight applied
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 6/26
Venture Quality Plan – Key Expectations
PQM, PQC, SQC resource structure in place with R&R’s defined,explained and implemented
Each PMT member to be familiar and conversant with their role in VQP
Surveillance Programs of Contractors/Suppliers activities in place andunderstood for Engineering, Procurement and Construction
Documented Assessments by PMT on Contractors procedures
Documented Verifications of product acceptability (typically via ITP’s)
Use of Venture Control Procedures CPQ 1 thru 5 (CPQ 5 approvalpending)
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 7/26
Venture Control Procedures – Key Expectations
CPQ –
01 Deficiency Control and Corrective Action
First line responsibility for identifying and disposition of deficiencies lieswith Contractor.
PMT issue/implementation of CPQ - 1 is seen as a “last resort”.
CPQ – 1 seen as a PMT mechanism in to communicate deficiencies toContractor/Supplier.
Use of PMT-issued Deficiency Reports – notification of deficiency that can
be reworked or replaced in a relatively short time period.
Use of PMT-issued NCR’s – for non-compliance of a specific product.
Use of PMT-issued CAR’s – for process or repetitive failures
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 8/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 9/26
Venture Control Procedures – Key Expectations
CPQ –
03 Processing Specification Deviation Requests
Contractors/Suppliers to use a structured and documented process to recorddeviations to RG Eng Specs and provide the engineering rationale for PMTacceptance or otherwise.
Provide increased levels of review and approval based on significance of thedeviation. Eg..Stakeholder, SME, OED/Opco etc.
Approved changes to RG Eng Specs that enhance Safety, Risk, Cost saving andtech improvements are communicated to all Venture Projects.
Applies to one-time exceptions and permanent changes.
PMT Eng Manager responsible for process ownership and tracking.
Alternative processes may be used but must incorporate all parameters of CPQ – 03 and be approved by PMT.
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 10/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 11/26
Venture Control Procedures – Key Expectations
CPQ –
05 Construction Surveillance Program
Surveillance and oversight by site quality group is criticality based and
directs focus on items critical to success of the engineering design.
Does not relieve the Contractor from their QA/QC responsibility.
RGEE and RGPMS compliant process.
Allows structured construction assessments to be planned and
implemented. Includes reviews of quality records.
PMT’s PQM and SQC’s are fully trained and conversant with program.
Metrics reporting. Numbers of Assessments, Verifications, NCR/CAR’s.
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 12/26
ENGINEERING, PROCUREMENT & CONSTRUCTION
SURVEILLANCE PROGRAMS
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 13/26
PMT E,P & C
Surveillance
Verification of
Contractor E, P & C
Products
Assessment of
Contractor E, P & C
Processes
PMT
Document &
DrawingReview
Of E P & C
Deliverables
Third Party
Verification
(e.g. FEA, MWS
PMT Verify
Vendor
inspectors
Activities
Other Project
Specific
Verifications
Model tests
Material tests
Pressure tests
N-He Leak test
Etc.
Initial
Assessment of
Contractor
Written
Procedures
Periodic
Assessments of
Contractor
Compliance with
Procedures
Special Reviews
Model Reviews
HAZOPS
Formal Design Reviews
ITPS, Weld Procedures,
Pressure Testing
GENERIC COMPONENTS OF PMT E,P & C SURVEILLANCE PROGRAMS
Criticality Assessment and
Assignment of Document Review
Code
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 14/26
Objectives of Engineering, Procurement
& Construction Surveillance Plans
To confirm that CONTRACTOR E, P and C complies with the following:
Complies with Project Specifications and documented requirements specified by the
Agreement.
That the CONTACTOR E, P & C is executed according to the CONTRACTOR’s Project
Quality Plan, Engineering, Procurement & Construction Quality Plans
Verify CONTRACTOR E, P & C is in accordance with RGEE and RGPMS expectations
Guide PMT staff conducting surveillance work
Provide a framework for defining other third party involvement in E & C Activities
Provides a facility clearly in compliance with the agreed design to assure pre-start up
integrity
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 15/26
Work Done To Date on Surveillance Plans
Assigned a criticality rating of high, medium, low or non-critical to all Systems, Sub-
Systems and Activities associated with the project that have engineering input
Produced Document Classification Matrices for E, P & C Deliverables
Produced Document Distribution Matrices that identifies Lead
Reviewers, Third Party Coordinators and Reviewers
Produced Assessment Schedules
Produced Assessment Checklists for Assessing CONTRACTOR Procedures and
implementation of Procedures
Produced Verification Checklists for documents, procurement activities and construction
activites.
Produced Surveillance Program Procedures for E, P & C.
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 16/26
System category System Description Engineering Criticality
HP Process
Utilities
Process Support
WellStream Fluids
Submarine Power and Fiber Optic
Cable
Chemical Injection
High
High
Medium
LP Process
Utilities
Process Support
Closed Drain
Instrument and Plant Air
Open Drain
Activity Description
Load Out of Deck
Pipelaying
Low
Low
Non Critical
Engineering Criticality
Medium
Medium
Criticality Ratings for Systems and Construction Activities
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 17/26
Document Classification Matrix for Vendor Documentation
(more) Document Importance (less)
System Quality/Quality Control Plans Welder Qualifications Schedules Test Reports & Results IOM's
Criticality Inspection Test Plans NDE Operator Qualification Dimensional Inspection/Control Procedures Performance Data Equipment List
MDR,s Pressure Testing Procedures Special Tools List Outline Drawings Utility Requirements
Package P&ID's Forging Procedures SDRL's Fabrication Drawing Connection List
Structural Calculations Heat Treatment Procedures Name Plate Information Dimensional Drawing
FEA Reports Tungsten Carbide Coating Procedure Material Receiving Procedures Catalogue Components
Pressure Vessel Design Calculations Acceptance Testing Procedures Sub Vendor List Detail Drawings
Electrical Calculations Casting Procedures Cross Sectional Drawings Seal & Seal Flush Drawings
Instrument Calculations Load Charts Structural Drawings Transportation & Preservation Procedures
Power Calculations DCS/TMR Graphics Parts/Material List Lubrication Schedules
Load Calculations Specifications Schematics Wiring and Connection DiagramsDesign Basis Flushing Procedures Single Line Diagrams Cable Schedules
FLD's Subsea Cable Procedures System Block Diagrams Isometrics
Lifting Calculations General Assembly Drawings Actuator Torque Curves/Data Termination Drawings & Lists
Fireproofing Calculations General Arrangement/Layout Drawings Loop Diagrams
Manufacturing Procedures/Specs MPS Datasheets Fabrication and Assembly Procedures
VDF's Linepipe & Bend Procedures Architectural Drawings
Spare Parts Lists Coating Procedures (Linepipe/Bends/Riser)
WPS & PQR 's an d Wel d map Su bs ea An od e Pr oc edur es/ Dr awi ngs
NDE Procedures NDE Plans
Painting and Coating Procedures/Specifications
Valve Fire Safe Tables and certificates
High II II II III III
Medium II II II III III
Low II II III III IV
Non
Critical II III III III IV
I = RG PMT and 3rd Party Review
II = RG PMT Review
III = For Information Only
Document Classification Matrix for Vendor Deliverables
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 18/26
D5648 - RasGas Expansion Project Phase II WH6 & WH8 Facilities
LEGEND:
II = RG PMT Review
III = For Information Only
IV = Document no required unless requested by RG PMT
(*) Only for Specifications that are modified
LR : Lead Reviewer
TPC : Third Party Coordinator
.
MECHANICALTanks & VesseslsTest SeparatorSupplier Document Register List II R LR
Data Sheets/Calculations II R LR
Material Specification II R LR
Drawings II R LR
Quality Documents II R R LR
Painting ProcedureII
R R LR
Schedules II LR R
Spare Parts List II LR R
Manufacture Data Records II LR R
Vendor Data Files II LR
Installation/Maintenance Manual III LR
CP Separator
Supplier Document Register List III R LR
Data Sheets II R LR
Drawings II R LR
Procedures II R LR
S t u a r t J o n e s
D O C U M E
N T C L A S S I F I C A T I O N S
I a n R . A
m b r o s e
J . A l a n S u m m e r s
N i r m a l V i r d e e
D a v i d T
o p p
Distribution Matrix - Vendor Document Deliverables
A n d r e w
B r a d y
S t e v e n O g l e
P e t e r L e o n a r d
S a n d y C
. G a m m i e
W i l l i a m
F i t z G e r a l d
A t w e l l C .
G o i n s
M i k e S .
W e a l
B o b H a w y e s
J e r r y L o n g l e y
C h r i s W
. P r y k e
M a h a d e
v K u t g u l l a
R = Review
IO = Information Only
Distribution Matrix for Procurement (Vendor) Deliverables
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 19/26
Assessment Schedule for Construction
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 20/26
Checklist for Assessing EPC Contractor’s
INDEX
Engineering Back to Start List # Description Rev Issued
AA-01 Engineering Planning A
AA-03 Engineering Procedures AAA-06 Control of Engineering Documentation A
AA-07 Quality Management AAA-08 Risk Management A
Sample List of Engineering Assessment Checklists
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 21/26
Topic: Engineering Planning Checklist #: AA-01 Rev A
Project: Review Date:
Sub-project:
AcceptableItem Assessment Attribute
Yes No N/A
1. Project Execution Plan developed and executed, addressing:1. Scope, objectives, strategies, organizations for all project phases (identifying key
individuals), responsibilities, and overview of plans for:
a. Executing the engineering and design, including:
● Identifying and incorporating the necessary inputs to the engineering and design
● Applying engineering-related quality assurance, including design verification,qualification of subcontractors / vendors, internal and external audit, inspection andtesting, and nonconformance and corrective action procedures
b. Cost (including cost tracking, reporting and control)
c. Schedule (inc. scheduling methods, tracking, reporting, control and growth mitigation)
d. Work breakdown structure (inc. physical, commercial and scope-of-work boundaries)
e. Identification of interfaces, and interface management including meetings and reporting
f. Other detailed plans, e.g. for Fabrication and Installation Site Logistics, and Purchasing
2. Processes and procedures to be used, identifying those that exist, those to be developed,and the plan for their development. Includes processes to identify issues, evaluate issues,plan mitigation, execute mitigation, and verify outcome
3. Initial high-level project schedule
4. Company having access to Contractor / subcontractors / vendors for QA and expediting
5. Contractor's subcontracts not limiting Contractor's duties or Company's rights
6. Before carrying out work, or moving any materials or equipment, Contractor obtaining andcomplying with Company and insurers' requirements for maximum value of shipments,promptly notifying Company, investigating thoroughly, reporting and claims handling
7. Setting up engineering offices at or near all work sites
8. Providing Company with offices, facilities and support, including document control, atContractor's home and site offices
Example of Engineering Assessment Checklist
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 22/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 23/26
Example of
Verification Checklist
(Construction)
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 24/26
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 25/26
Where Do I Find the Information:
Location of Surveillance Programs (incl Check Lists) and all things
related to Quality for RGXII and AKG2 (incl. Assessment Reports, CARs,
NCRs, Quality Metrics, etc)
G:\ Trains 6 & 7
\ 5.0 Execution
\ 5.3 QA-QC Program
\ Assessment Reports
\ Quality Metric Reports
\ RG Engineering Surveillance Program
\ RG Procurement Surveillance Program
\ RG Construction Surveillance Program
\ Venture QMS
7/27/2019 PMT VQP R\
http://slidepdf.com/reader/full/pmt-vqp-r 26/26
PMT Quality Metric Reports