pne wind ag ewec 2010 warsaw theme: finance and economics session: project finance

9
PNE WIND II 1 PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance Presenter: CEO Martin Billhardt Buchholz wind farm

Upload: cortez

Post on 05-Jan-2016

39 views

Category:

Documents


2 download

DESCRIPTION

PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance Presenter: CEO Martin Billhardt. Buchholz wind farm. Value chain of offshore wind farms: Development of offshore wind farms. Approval process of offshore wind farms - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 1

PNE WIND AGEWEC 2010 Warsaw

Theme: Finance and economics

Session: Project finance

Presenter: CEO Martin Billhardt

Buchholz wind farm

Page 2: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 2

Value chain of offshore wind farms: Development of offshore wind farms

Page 3: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 3

Source: BSH, modified by PNE WIND AG

Approval process of offshore wind farmsGerman Federal Maritime and Hydrographic Agency (BSH)

Page 4: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 4

• The scope of cooperation with a wind turbine supplier may include:

• First step: help to organise the financing, building up a project organisation, finding sub-suppliers, supply quotes and technical input, assist with an feasibility study, manage risiks and interfaces of the project partner, support with technical details

• Second step: negotiation of a Turbine Supply Agreement (TSA) and Service and Availability Agreement (SAA)

• TSA: liability, warranty, waranty power curve, weather risks, scope of work, bankability issues, timeframe for completion, guarantees of the parties

• SAA: cost for labour, parts and equipment, service fee, availability guarantee, liability

• The scope of cooperation with an offshore project management company may include:

• Project preparation

• Project procurement

• Contracting and contract management

• Project support and organisation

PNE WIND AGOffshore Private Equity Fund: the value of experienced partners

Page 5: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 5

• Initiation of a Private Equity Fund with the aim to invest in permitted offshore wind farms

• Exit: two years after commissioning sale to a long-term investor based on historical data

• Target IRR: 14-18%

PNE WIND AGOffshore Private Equity Fund: idea

Page 6: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 6

Framework

• Maturity: 5-6 years

• No. of Offshore wind farms: 6 wind farms

• No. of wind turbines/wind farm: 80 turbines

• Capacity per wind turbine: 5 MW

• Capacity held by the fund: 2.400 MW

PNE WIND AGOffshore Private Equity Fund: scheme and example

Capital

• Required investment: 3,3 Mio. EUR/MW

• Total investment-volume: 7.920 Mio. EUR

• Equity: 40% (3.168 Mio. EUR)

• Debt: 60% (4.752 Mio. EUR)

Page 7: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 7

PNE WIND AGOffshore Private Equity Fund: „adjustable screws“ -> risks

Page 8: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 8

• The value consists of wind, feed-in-tariffs, proven technology, experience, knowledge

• During the following phases the wind is examined, the feed-in-tariffs are fixed and proven technology is chosen to manage the fund with an experienced project management team which has an in-depth project and industry knowledge

A good developer differentiates as follows to prepare the asset:

1. Developing the permission

• Get the permission by analysis of different surveys (shipping, environment, public, general technical, geotechnical, health & safety, construction aspects) and considering the project site, wind farm layout, geophysical investigations, wind studies, turbines, foundations and the electrical design

2. Structuring the financing

• Appoint legal, technical and insurance advisors, structring the finance, negotiate commercial contracts, develop financial model and indicative term sheet, prepare an info-memo for banks, building the final bank club, due diligence, contract negotiation, financial close

PNE WIND AGOffshore Private Equity Fund: the value

Page 9: PNE WIND AG EWEC 2010 Warsaw Theme: Finance and economics Session: Project finance

PNE WIND II 9

3. Managing the construction

• Evaluation of potential partners concentrates on companies with a high level of experience: track record, design capabilities, financial strength, personnel and equipment capability, Health & Safety record

4. Servicing the wind farm technically and commercially

• Technical services will be ensured mainly by a Service and Availability Agreement with the turbine supplier

• Commerical issues will be organised with partners who have a long experience in this field with onshore windfarms, partly with offshore technology

PNE WIND AGOffshore Private Equity Fund: the value