Page 1February 2012
Confidential / © Siemens AG 2012. All rights reserved
Siemens Contest
Milan, 15th March 2012
ADESSO project
The Challenge
How to participate
Siemens in Italy and aroud the world
Smart Griddevelopment
Active Demandmanagement
project
ADESSO Project
The challenge
How toparticipate
Siemens in Italy and around the world
Smart Griddevelopment
Active Demandmanagement
Project
Innovation & Sustainability
I won't sell the
future
for short term
Page 4
for short term
profit.
Werner von Siemens
Megatrend
Urbanization
Eff
icie
nt
use o
f re
so
urc
es
Megatrends are significantly shaping the future of our planet
Page 5
Demographic change
Climate changeEff
icie
nt
use o
f re
so
urc
es
Industry HealthcareEnergy Infrastructure& Cities
Drive Technologies
Industry Automation
Industry Solutions
Imaging & IT
Workflow & Solutions
Diagnostics
Fossil Power Generation
Renewable Energy
Oil & Gas
Smart Grid
Building Technologies
Mobility
Rail System
Gruppo Siemens Settori e Divisioni
Industry Solutions
Energy Service
Power Transmission
Rail System
Low & Medium Voltage
Lighting (OSRAM)
Sales (2011):
2,5 billion €Torino
Trento
Varese
GenovaFirenze
Milano
BolognaSavona
Padova
Siemens in Italy
Page 7
Employees (2011):
4.800
GenovaFirenze
Pavia
Roma
(Locations with more then 50 employees)
Bari
Recruiting@Siemens
Requirements
Team player
Innovation
Initiative
Openness
Page 8
Business knowledge
Mobility
English/Italian
Apply to Siemens
www.siemens.it/careers
Recruiting channels
The best recruiting channel is used for the selected target group.
Various channels exist for the different candidate categories.
Early professionals
Universities
Experienced professionals
Referral program
Students
Universities
Graduates
Universities
Page 9
Universities
Job boards
Referral program
Social networks
Agencies/
Head Hunters
Referral program
Job boards
Job
advertisements
Social networks
Headhunters
Universities
Career / job fairs
Job boards
Social networks
Student
programs
Internships
Universities
Career / job fairs
Job boards
Social networks
Referral program
ADESSO project
The challenge
How toparticipate
Siemens in Italy and around the world
Smart GridDevelopment
Active Demandmanagement
project
Population Growth
In 2007 ~ 50% of the world's population was living in cities, an increase from 3.5 B to 4.7 B until 2030
Infrastructure & CitiesWe are in the “urban millennium”
Cities as Powerhouses
50% of world GDP is produced in cities with a population over 750,000
Major energy and climate factor
75% of energy consumed in cities 80% of CO2 emissions are produced in cities
Page 12 Mar-12
End of 21st Century
Paradigm shift in power grids
End 21th Century
Mar 12
20th Century
Fossils energy sources
Generation follows loads
Renewable energy sources
Loads follows generation
ADESSO Project
The challenge
How toparticipate
Siemens in Italy and around the world
Smart GridDevelopment
Active DemandManagement
Project
Supply
Gestione attiva della domanda
Traditional Energy System
Available supply
Peak Demand
Sustainable Energy System
Thanks to smart grid development the
communication between energy producer and final
customers will be bi-directional
Page 16February 2012
Confidential / © Siemens AG 2012. All rights reserved
Customer Demand
DemandAvailable supply
Energy vendor will know end user electricity
consumption on a real time basis and will be able to
manage them in response to supply conditions
System efficiency will be increased with
environmental and financial benefits
ADESSO project
The challenge
How toparticipate
Page 17February 2012
Confidential / © Siemens AG 2012. All rights reserved
Siemens in italy and around the world
Smart Griddevelopment
Active Demandmanagement
project
ADESSO Project Call Regione Lombardia ICT MIUR
• Development of an Energy Management
system able to manage in an
Objective
Page 18February 2012
Confidential / © Siemens AG 2012. All rights reserved
Background
manage in an optimized way end
users and small C&I electricity demand Project
partner• End user integration in the
electricity market
Maggiore elasticità della domanda
• Higher elasticity demand
• New opportunity for demand side management
Waiting for final award
ADESSO Project – System architecture
Portale web utenti
Operation CenterRemote Server
End user web portal
Confidential / © Siemens AG 2012. All rights reserved
Internet
Portale web utenti
Residenziale Piccolo commercioResidential Small C&I
End user web portal
Service provider functionality – Some examples
Display and modify the application (associate device to customers, enabling customers to
different services, suggest/promote services to different customer segments, …)
Display customers consumption in a specific area (real-time data, historical data)
Aggregate, display and analyze data at different levels (by customers, by consumption
typology, …)
Page 20February 2012
Confidential / © Siemens AG 2012. All rights reserved MD
B M
&D
-W
S IT
Agenda-1
202
16-U
G-v
01.p
pt
Draw-up dedicated contracts with final customers to optimize their electricity consumption
profile during the day according to different criteria (load leveling, on demand, …).
Display the energy generated by any sources on the area such as photovoltaic panels
….
ADESSO Project
The challenge
How toparticipate
Page 21February 2012
Confidential / © Siemens AG 2012. All rights reserved
Siemens in Italy and around the world
Smart GridDevelopment
Active Demandmanagement
Project
The CHALLENGE: we ask you…
Taking into consideration the defined target and
the final objective of electricity consumption
transparency and reduction identify and describe:
Energy Box functionality for end-users /
Page 22February 2012
Confidential / © Siemens AG 2012. All rights reserved MD
B M
&D
-W
S IT
Agenda-1
202
16-U
G-v
01.p
pt
Energy Box functionality for end-users / small C&I imaging a complete “user experience”
Which opportunities / real problems the proposed solutions meet
Possible interaction modes between devices HW / SW (Energy Box, web portal, smart phones) and the end user
ADESSO Project
The challenge
How toparticipate
Page 23February 2012
Confidential / © Siemens AG 2012. All rights reserved
Siemens in Italy and around the world
Smart Griddevelopment
Active Demandmanagement
Project
Today 11st May22nd April
1 week
Contest timeline
Page 24February 2012
Confidential / © Siemens AG 2012. All rights reserved
Registration
To register send an e-mail at the following address:
• Enrollment e-mail mandatory information :
• Name, Surname, matriculation number
Page 25February 2012
Confidential / © Siemens AG 2012. All rights reserved
• Name, Surname, matriculation number
• Classroom where you followed the contest presentation
Your contact e-mail that will be used to send you additional information
• Team participation is allowed (up to 2 people) - additional information needed:
• Team name
• Name, Surname, matriculation number of the second participant
Documentation requested
• Solution/s has/have to be presented using power point slides (about 10-15 slides per solution), word file with detailed description and comments has to be provided too. For each power point slide we need a description
page.
• You can add attachments to power point / word without limitations
within 22nd April
Page 26February 2012
Confidential / © Siemens AG 2012. All rights reserved
• Solution/s has/have to be submitted within 22nd April
In upcoming days you will received at your e-mail (the one specified during
registration) suggestions and additional information
• You can contact Siemens asking for clarification at the following e-mail
address:
Evaluation
Solutions will be evaluated by Siemens expert considering following criterias:
Level of innovation
1=solution is already available on the market
5= solution is completely new
Match with requirement
Page 27February 2012
Confidential / © Siemens AG 2012. All rights reserved
Match with requirement
1= solution does not respect requirement defined
5= solution is completely in line with defined requirements
Level of completeness
1= solution has to be strongly modified to be implemented
5= solution could be launched on the market with limited effort
Clarity and structure of the documentation provided
Evaluation and awarding ceremony
• Awarding ceremony will be at Siemens office in Milan. All the participants will have the opportunity to present their solution/s (5 minutes each) to Smart
Grid Division Management and Siemens HR
• The three best solutions will be awarded with:
I-pad (Third generation, 32 GB)
Opportunity to present the solution in details to the Head of Smart Grid
Page 28February 2012
Confidential / © Siemens AG 2012. All rights reserved
Opportunity to present the solution in details to the Head of Smart Grid Division and to meet HR Director for an interview
Opportunity collaborate with Siemens project team for the project development and the solution implementation (prototype phase).
Moreover Siemens will be available to support the student for final thesis
• The winner will choose the prize between the 3 options, than the second will do
his/her choice while the student classified at third place will receive the
remaining prize
• At the end of the awarding ceremony it will be possible to spend couple of hour in Siemens laboratory where Smart Grid solution are developed
Contacts
For any additional information feel free to contact us at the
following address
Mail:
Page 29February 2012
Confidential / © Siemens AG 2012. All rights reserved