pompano g.o. bond streetscapepompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… ·...

17
POMPANO G.O. BOND STREETSCAPE MARTIN LUTHER KING BLVD. IMPROVEMENTS PHASE 2 (BETWEEN NW 10 th AVE. AND NW 6 th AVE.) CITY PROJECT NO. 19356 CONSTRUCTION PUBLIC OUTREACH MEETING JUNE 3, 2019

Upload: others

Post on 16-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

POMPANO G.O. BOND STREETSCAPEMARTIN LUTHER KING BLVD. IMPROVEMENTS

PHASE 2 (BETWEEN NW 10th AVE. AND NW 6th AVE.)CITY PROJECT NO. 19356CONSTRUCTION PUBLIC OUTREACH MEETING

JUNE 3, 2019

Page 2: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

Tradition, Integrity, Excellence 

Page 3: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd
Page 4: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT DESCRIPTION

• PROJECT IS AN EXTENSION OF THE PREVIOUSLY COMPLETED MLK BLVD. PHASE 1 (NW 6th AVE. TO DIXIE HWY.) AND IS PART OF THE DOWNTOWN CONNECTIVITY MASTER PLAN.

Page 5: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

Overall Site Plan - 2012

DOWNTOWN CONNECTIVITY PLAN

ATLANTIC BLVD

BLA

NC

HE

ELY

6TH

AVE

1ST

AVE

MLK/HAMMONDVILLE RD

NE 3RD ST

NE 2ND ST

NE 1ST ST

I -95

Page 6: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

DOWNTOWN CONNECTIVITY PLAN

Study Districts - 2012

MLK / HAMMONDVILLE RD.MLK / HAMMONDVILLE RD.

CIVIC CAMPUS

CIVIC CAMPUS

OLD POMPANO

OLD POMPANO

ATLANTIC BLVD

Page 7: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD / HAMMONDVILLE RD.

Illustration & Phasing - 2012

BLA

NC

HE

ELY

/ 6TH

AVE

ATLANTIC BLVD

I-95

MLK/HAMMONDVILLE RD

PHASE 2PHASE 2 PHASE 1PHASE 1

Page 8: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT DESCRIPTION

• PROJECT IS AN EXTENSION OF THE PREVIOUSLY COMPLETED MLK BLVD. PHASE 1 (NW 6th AVE. TO DIXIE HWY.) AND IS PART OF THE DOWNTOWN CONNECTIVITY MASTER PLAN.

• ROADWAY RECONSTRUCTION AND STREETSCAPE PROJECT.

• LANDSCAPE/HARDSCAPE BEAUTIFICATION FEATURES INCLUDING:NEW DECORATIVE WIDE SIDEWALKSPEDESTRIAN LIGHTINGSTREETSCAPE FURNITURE (TRASH RECEPTACLES/BENCHES/BICYCLE RACKS)LANDSCAPE ISLANDS AND PLANTER AREAS.

• MULTI‐MODAL (PEDESTRIAN/BICYCLE/TRANSIT) FACILITIES:WIDE SIDEWALKSBICYCLE LANESBUS STOPS WITH SHELTERSON‐STREET PARKING

• PEDESTRIAN SAFETY IMPROVEMENTS ALONG THE CORRIDOR AND AT INTERSECTIONS.

• OVERHEAD UTILITY INFRASTRUCTURE HARDENING (NEW CONCRETE POLES).

• WATER DISTRIBUTION SYSTEM UPGRADE (NEW 12‐INCH WATER MAIN).

Page 9: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD / HAMMONDVILLE RD.

Sidewalk Concept - 2012

Page 10: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD / HAMMONDVILLE RD.

Landscape Concept - 2012

Page 11: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2MAJOR POINTS

• MLK PHASE 1 AND 2 WERE PREVIOUSLY FULLY DESIGNED AND PERMITTED.

• ONLY SOME PERMITS HAVE EXPIRED FOR PHASE 2 AND WILL NEED TO BE REPROCESSED.

Page 12: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT FEATURES – COMPLETED PHASE 1 (EAST OF NW 6th AVENUE)

Page 13: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT FEATURES – COMPLETED PHASE 1 (EAST OF NW 6th AVENUE)

Page 14: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT FEATURES

Page 15: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2MAJOR POINTS

• MLK PHASE 1 AND 2 WERE PREVIOUSLY FULLY DESIGNED AND PERMITTED.

• ONLY SOME PERMITS HAVE EXPIRED FOR PHASE 2 AND WILL NEED TO BE REPROCESSED.

• THE CITY’s INTENT IS TO HAVE THE PROJECT CONSTRUCTION START BY THE 1st QUARTER OF 2020.

• IN ORDER TO ACCELERATE CONSTRUCTION THE CITY IS KEEPING THE SAME TEAM AS IN PHASE 1.

DESIGN ENGINEER (KEITH)CONTRUCTION‐MANAGER‐AT‐RISK ‐ CMAR (WHITING‐TURNER)

• PROJECT SCHEDULECONSTRUCTION START – 1st QUARTER 2020CONSTRUCTION COMPLETION – 1st QUARTER 2021

Page 16: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

MLK BLVD. – PHASE 2PROJECT SCHEDULE

Page 17: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd

#KEITHteam