portfolio of zoltán gábor virÁnyi

64
Portfolio 2004-2010 ZOLTáN GáBOR VIRáNYI

Upload: zoltan-viranyi-fontan

Post on 15-Mar-2016

231 views

Category:

Documents


0 download

DESCRIPTION

Bachelor portfolio in Architectural Technology and Construction management

TRANSCRIPT

Page 1: Portfolio of Zoltán Gábor VIRÁNYI

Portfolio2004-2010

Zoltán Gábor Virányi

Page 2: Portfolio of Zoltán Gábor VIRÁNYI

Zoltán Gábor VIRÁNYI

Bachelor of Architectural Technology and Construction Management

[email protected]

zgviranyi.wordpress.com

Page 3: Portfolio of Zoltán Gábor VIRÁNYI

Portfolio2 0 0 4 - 2 0 1 0

or

How can i have professional experience when just finishing bachelor’s education?

Z o l t á n G á b o r V i r á n y i

Page 4: Portfolio of Zoltán Gábor VIRÁNYI

4

Contact

[email protected]

60 rue Rachais69007 LyonFrance

born

7 October 1985Kaposvár, Hungary

Personal interests

Intercultural communication, sustainable architecture and urbanism, cinema and photography.

Personal details and skillsGraduation2004 Táncsics Mihály Gimnázium, Kaposvár, Hungary

Grades (on 5-point scale):Mathematics: 5 (excellent)Hungarian grammar and literature: 5 (excellent)History: 4 (good)English language: 5 (excellent)Geography: 4 (good)

language skills

Hungarian NativeEnglish FluentFrench BasicGerman BasicDanish Basic

Software skills

Autodesk Revit Architecture AdvancedAutodesk Revit MEP BeginnerAutodesk AutoCAD IntermediateAutodesk 3ds Max BeginnerAdobe Photoshop IntermediateAdobe InDesign IntermediateGoogle SketchUp AdvancedMicrosoft Office AdvancedMicrosoft Project Intermediate

Chart showing my educational development in ECTS credits during my technical studies by disciplines

The fields from top to bottom (total ECTS credits) Architecture & Building design (37) Economy & Management (39) Structural Engineering (23) Building services (13) IT, CAD & BIM (15) Physics & Chemistry (12) Material Sciences (16) Drawing, Geometry & Visualisation (14) Law (5) Mathematics (5) Language (6) Humanities & Social (8) Practical placement (15) Sports (2)

Page 5: Portfolio of Zoltán Gábor VIRÁNYI

5

Table of Contents

Page 6: Portfolio of Zoltán Gábor VIRÁNYI

6

Page 7: Portfolio of Zoltán Gábor VIRÁNYI

2006-2008

7

CiVil enGineerinG StudieS

Page 8: Portfolio of Zoltán Gábor VIRÁNYI

8

bachelor of Civil engineering

The aim of the education is to prepare civil engineers, capable to deal with the design, construction, and maintenance of the physical and naturally built environment, including works such as bridges, roads, canals, dams and buildings. Civil engineering is a wide-ranging field including building engineering, civil engineering, construction engineering,

industrial, manufacturing, mechanical, materials and control engineering. The study programme also provides knowledge in the fields of management, economy and leadership theories.

institute

University of Pécs, Pollack Mihály Faculty of Engineering

With its more than 29,000 students and nearly 2,000 teachers the University of Pécs is one of the largest higher educational institutions in Hungary with high-quality research and education. It has 10 faculties and 500 study programmes.

Pollack Mihály Faculty of Engineering is one of the biggest, most multifaceted institutions of Hungarian technical higher education and the centre of South-Transdanubian engineering education with its 5,000 students and 40-year experience. The Faculty was named after Mihály Pollack, the noted architect, who won world-wide reputation by designing several public buildings, churches and mansions in the 1800s.

The Faculty offers 9 bachelor courses and 3 master degree programs. Students can choose from a wide range of higher vocational and specialised further training options. The programmes are highly practical. Besides internship programmes,

The main building of Pollack Mihály Faculty of Engineering in Pécs, Hungary

Page 9: Portfolio of Zoltán Gábor VIRÁNYI

9

a prominent event of the cooperation between the Faculty and leading industrial experts is the Pollack Expo organised every year.

Since the beginning of the 1980s the Faculty has made an agreement of cooperation with several foreign partner institutions. Professor, researcher, PhD student and undergraduate student exchange programmes (Erasmus, Socrates) are maintained within the framework of these agreements.

Main finished subjects

Mechanics. Mathematics, Management, Building physics

A page from the notes for the course Mechanics II

Page 10: Portfolio of Zoltán Gábor VIRÁNYI

10

Page 11: Portfolio of Zoltán Gábor VIRÁNYI

11

2008-2010

ConStruCtinG arCHiteCture ProJeCtS

Page 12: Portfolio of Zoltán Gábor VIRÁNYI

12

bachelor of architectural technology and Construction Management

“A qualified Constructing Architect is able to:1. Plan and manage building and

construction projects.2. Undertake the survey, registration

and technical planning and design of buildings and constructions.

3. Communicate with clients, consultants, planners and designers and contractors in the technical planning and design, tender and implementation of building and construction projects.

4. Take care of the administration and project management in the building and construction sector

5. Enter into management and cooperation with others from different educational, language and cultural backgrounds.”

The Danish Ministry of Education’s directive for the Constructing Architect education

The education may look a little like the architect or the engineer, but the difference can be described as organisational skills. The architect works with aesthetics, the engineer with the physics and the constructing architect with the organisational part, while having an overview and a good understanding

of the others’ work in order to coordinate them.

Bachelors of Architectural technology are key persons on a building site. They coordinate the building process from drawing desk to computer and further to building site – all activities involved. This includes new buildings as well as the renovation of old buildings.

The students are always working on a

defined project, and the course gives grounding in the whole construction process, from the initial outline proposal to the rules for the 5-year follow-up inspection.

In addition to planning and design there are skills taught including surveying and recording, choosing materials and drawing in Revit and AutoCAD. The students also learn to communicate with authorities, developers, clients and contractors.

On the right:Group work with Judyta and Simon, my team in the 4th semester

Page 13: Portfolio of Zoltán Gábor VIRÁNYI

13

institution

VIA University College, School of Technology and Business

VIA University College is Denmark’s largest university college and covers all of Central Jutland. It has more than 15 000 students a year, approx. 2 000 employees, 39 addresses in the region, seven campuses, 50 study programmes and a revenue of DKK 1.2 billion (160 million EUR in 2006).

Our course programmes have been accredited by EVA – a Danish Evaluation Institute and a member of ENQA (the European Association for Quality Assurance in Higher Education).

School of Technology and Business offers a wide range of both degree and Bachelor programmes across the areas of engineering, construction and business.

The School of Technology and Business has a very international study environment, which gives you the possibility of acquiring the global skills. Besides getting a high quality education, an international network of friends and contacts will be developed along with a better understanding of culture and language. The Danish students and teachers go abroad to gain experience and we welcome international students and teachers.

VIA offers innovative education and our programmes are developed in close cooperation with employers in both public and private companies and institutions where our graduates are employed. Innovative teaching methods and problem-based learning through interdisciplinary projects are an integrated part of all our programmes. The teaching methods ensure that the graduates develop not only the necessary professional skills, but also the personal skills which are crucial in order to meet the requirements of a still more globalized world.

Most Constructing Architects are employed in architects’ drawing offices, consultant or contracting companies either working with planning and design or with actually implementing building projects. There is an increasing amount of jobs in other related fields for constructing architects, such as with local or government authorities, suppliers of building materials, banks, insurance companies and international organisations.

PoPbl – Problem orientated / Project based learning

The problem based learning is a unique way of encouraging the students to think out of the box, as they are forced to integrate different areas of knowledge and collaborate with other students to solve the problems. As they accumulate more knowledge along

The university on an ‘International day’

The different nationa- lities are introducing themselves

Page 14: Portfolio of Zoltán Gábor VIRÁNYI

14

the semesters, the problems or projects become more complex, preparing them for a career.

The learning is happening through projects that strictly follow real-life examples and methods. This way the students, when they finish their studies, already have 3 years of experience, and capable to start working as a professional.

These projects are multidisciplinary, and as such their preparation involves all the disciplines. The students plan and manage their projects themselves – therefore having a wide responsibility for their own education - but are supported by the ordinary theory tuition which runs alongside the project work and is as far as possible directly related to the project. Researching information e.g. using the reading room and the Internet are also important components of the project work.

All classes have a timetable showing when an individual teacher will be taking their class. At the beginning of the semester the teacher typically takes classes chiefly in the theory rooms; and later in the semester acts mostly as the students’ project consultant, in the project rooms, helping them with any problems with their projects etc.

In class there were many different students who have worked either mostly with books and theory or mostly in the field as craftsmen. Due to this mix of backgrounds in class the work groups were strong and dynamic with a wide spectrum of competence. The students helped each other using their skills best way possible.

The new Vitus Bering Innovation park

A cooperation between the university and local businesses

Page 15: Portfolio of Zoltán Gábor VIRÁNYI

15

international teamworkThe project work is carried out in groups of 2-6 students. The students create the groups themselves, but they are motivated to select teammates of as various – cultural, educational, professional etc. – backgrounds as possible.

Many different nationalities are represented at VIA University College, meaning that the exchange of ideas is not restricted to the exchange between Denmark and the home country of the international student, but takes place in a truly international environment represented by students from all over the world.

Professional bachelor

Professional bachelor programmes are professionally oriented bachelor curricula including a practical placement period which varies according to the specific education.

The courses prepare the students for a practical profession by emphasizing competency skills along with theory and analysis.

Left:The overall structure of the programme

On the left bottom:The main entrance of the School of Technology and Business

Page 16: Portfolio of Zoltán Gábor VIRÁNYI

16

Page 17: Portfolio of Zoltán Gábor VIRÁNYI

Theme

Date of presentation

Project team

Tutors

4th semester project

Multi-storey buildings with dwellings and commercial units

January 2009

Zoltán Gábor VIRÁNYI / HUNJudyta BUŁAT / POLSimon DELHOMMEAU / FRA

Hanne ÆLMOSE IVERSENJohs SIMONSENHenrik Jean BLYTErik HANSEN

17

Multi-Storey HouSeS in SkanderborG 2008

Page 18: Portfolio of Zoltán Gábor VIRÁNYI

18

Project backgroundThe hypothetical client was Skanderborg Housing Cooperative, a non-profit organization that ensures affordable apartments for ordinary people. The owner of the building plot at 66 Nørregade in Skanderborg town, where it planned to erect a new multi-storey residential block. Because Skanderborg Housing Cooperative wish to examine all the possibilities for

their plot they have employed each of us to come up with a proposal for a multi-storey house as our individual assignment. After that they chose one to be worked through for a proper outline proposal. (Every group was given a project to continue on.)

demands

General

On the previous page:Perspective of the buildings for the client

Right:Elevations north and east

Elevations west and south

Page 19: Portfolio of Zoltán Gábor VIRÁNYI

19

The building had to be erected with 3-4 stories of apartments plus basement. The basement area should contain approximately space for the tenants and caretakers use (storage, laundry, service room etc). The top level should consist of 2-3 penthouse apartments. The apartments should be designed with 1-2 bedrooms (penthouses 3 bedrooms) with a good and sensible interior design. Kitchen and bathroom facilities should be flexible and up to date. The apartments had to be able to suite different ways of living and different family compositions as well as be user friendly for senior citizens though not live up to general demands for housing for the aged.

To ensure an affordable rent level the government set a maximum area for the apartments. They were 95 m2 for the one-bedroom and 110 m2 for the two-bedroom apartments, including all habitable and access areas. The penthouse apartments are to be privately owned and therefore not subjected to the demands

concerning maximum size, but they had to adapt to the building design.

Appearance and constructionThe building had to appear as a modern house. The existing surrounding buildings had to be taken into consideration, so that the new apartment blocks appearance is both aesthetic and homogenous. The apartment had to be integrated into the natural landscape. The buildings outside areas had to be landscaped regarding paths, planting of trees, bushes etc.

The apartment block ought to be erected mostly in brick (normal size). Lightweight cladding could be used to give the facade a more exciting appearance. The penthouse apartments had to be erected in light constructions. The load bearing structure is of prefabricated concrete or lightweight panels and hollow core floor partition elements.

Elevator

Balkony

Balkony

Toilet

Kitchen

Diningroom

Hall

Wardrobe

Bedroom 1

Bedroom 2

Korridor

Bedroom 3

Livingroom

Elevator

LivingroomDiningroom

Kitchen Bedroom 2

Bedroom 1

Toilet Hall

Wardrobe

Kitchen

Toilet

Hall

Wardrobe

Bedroom 1

Livingroom

Diningroom

Korridor

Balkony

Balkony

Balkony

Balkony

DepotLaundry

Storage rooms

Depot roomElevator

Korridor

Toilet

Floor plans from Outline proposal

From left to right - Basement, 1st and 2nd floor, Penthouse

Page 20: Portfolio of Zoltán Gábor VIRÁNYI

20

Quality

The building should show energy-wise solutions that sets a precedent for future multi-storey housing. Skanderborg Housing Cooperative wanted to show courage and be the example others follow. The building had to be erected in materials that have the quality of a long Iifespan and easy maintenance. The choice of materials should enhance the buildings aesthetic qualities. Where possible; approved standard building materials ought to be implemented. Difficult accessible building materials and components had to be maintenance free.

EconomyThe government operates with a maximum price of 15 590 DKK/m2 for subsidised apartments, and Skanderborg Social

Cooperative was subjected to this. The maximum price had to comprise all costs including VAT and basement, excluding costs for air-raid shelter and the penthouse apartments.

registration assignment

In the beginning of the semester we had a task in order to gain sufficient knowledge to design modern and good quality houses. We formed groups and chose one topic from a list about Danish building design, components of usual dwellings. We had to gather examples, products and information about the aesthetic, functional and technical aspects and the regulations in connection with the chosen subject.

Renderings of kitchen and bathroom from Outline Proposal

Page 21: Portfolio of Zoltán Gábor VIRÁNYI

21

P2Construction of balconies on a typical floor and penthouse from the Scheme design phase

Erasmus Intensive Language Course

Erasmus Intensive Language Courses (EILC) are specialised courses in the less widely used and less taught European languages organised in the countries where these languages are spoken. I had the opportunity to participate in a three-week module with the aim of being prepared for their Erasmus mobility period in Denmark, where I have spent two years afterwards.

The EILC courses have the dual aim of

1. developing basic communication skills in Danish enabling the student to cope with everyday situations as well as

2. providing information on Denmark and insights into Danish culture and lifestyle.

The main approach was communicative, derived from a functional view of language. The focus was on active language usage. Listening and reading comprehension as well as oral production had been

given the greatest weight. Pronunciation exercises and grammar lessons were included.

The course was be conducted as a combination of teacher directed and learner centred activities, i.e. reading, writing and pronunciation exercises, communicative games, role plays, audio- and video based exercises. Completion of homework was also required. We were offered practice lessons with Danish students.

The aim of the cultural component is to introduce Denmark and Danish culture in its multifaceted manifestations through lectures, discussions and field-trips.

The course provides a unique opportunity to experience Danish culture, by social and cultural events along with lectures given on Danish writers, history and other cultural and social subjects. Selected examples of contemporary Danish filmmaking had been shown. We had introduction to traditional Danish music and folk dance.

Page 22: Portfolio of Zoltán Gábor VIRÁNYI

22

9

46

8

105

7

11

3234

36

13

15

17

82

38

RR

EG

AD

E

Our theme was ‘Balcony, staircase and lift’, what we had to present to the class using posters and the projector. We also followed the presentation of the other topics by the rest of the groups.

tender phase (outline proposal)

On the basis of the handed out ‘client’s brief’ the students were requested to carry out analyses and sketches ending up with an outline proposal. Among other things the client wanted a state-of-the-art housing project in Energy class 1. According to the tender invitation letter the proposals shall be subject to the following criteria:

• Architectural design - 30%• Buildability, project organization and

time schedule - 30%• Sustainability in construction,

including choice of materials as well as energy initiatives - 30%

• Cost - 10%.

In the outline phase emphasis had been put on the ability to investigate and to sketch solutions at outline level.

Project proposal (Scheme design)

As building designer it was our task to further develop the project to such a state that it was to be suitable for planning

permission as well as solicitation of bids from prospective subcontractors. Special emphasis had been put on such elements as stairs, balconies, wet rooms, roofs and external wall construction.

On the right:Situation plan

We worked methodically - proposing solutions – from the overall level down to the detail.

Page 23: Portfolio of Zoltán Gábor VIRÁNYI

23

Innovation week

‘Return ticket to uncharted territory’ is a week of innovative cross-disciplinary thinking. The participants of the project were approximately 330 students from nine different education programmes: Social Educator, Constructing Architect, Value Chain Management, Marketing Management, Production Engineering, Mechanical Engineering, Information Technology Engineering, Global Business Engineering, and Civil Engineering.

The specific objective of the project was to give experience in using systematic methods for innovation processes - across disciplines and in close collaboration with external interested parties. Each project group was working on one idea for the entire week.

Our chosen project was ‘Using available energy’, a challenge given by LINAK Danmark A/S, who develops and manufactures linear actuator systems which produce electric movement (used for example in hospital beds, office desks or agricultural products). LINAK is also one of the largest suppliers of complete quality electric movement solutions.

Whenever a linear actuator is used it normally needs a lot of power in the forward or outgoing lift. The assignment was to collect the available extra energy of the return movement in order to reuse it for the next raise. For example lifting a complete bed surface from floor to working height. We came up with different solutions, such as springs or batteries, while gaining valuable experience in cooperating with different disciplines in order to solve a problem.

building services and building physicsWe analysed and designed the ventilation, sewer, drain, water and heating system including arrangement and dimensioning to fit the different demands. We learned about alternative energy solutions.

We calculated the energy frame of the buildings on an outline level. We studied sound theories and implemented it in calculations like reverberation time.

Structural design

We had to define the structural system of the buildings after analysing the available solutions. We learned the sizing of sound-

and hollow core floor slabs different types of suspended concrete slabs and beams. We calculated the anchoring of different types of roof constructions. We examined different ways of balcony fixings and abutments, then designed solution for our building.

building planning and management

We planned our own work – a basis for a theoretical fee calculation – and the whole project. The cost of the construction was calculated in accordance with the rules for government subsidised housing in Denmark. We acquired the principle of successive calculation, compared different

forms of contracts and tenders. We learned the basics of project scrutiny, quality assurance and safety and health, while expanded our professional vocabulary with terms used in construction projects.

elective subject: Sketching and watercolour in architectural visualisationThis was a three-week course to improve our skills in architectural sketching using pencil and watercolour. We practiced techniques that help visualising ideas or aesthetical appearances of buildings. The course included theoretical issues such as perspectives or colour scales.

Page 24: Portfolio of Zoltán Gábor VIRÁNYI

24

Page 25: Portfolio of Zoltán Gábor VIRÁNYI

25

Theme

Date of presentation

Project team

Tutors

Refurbishment and Remodelling (Urban renewal)

June 2009

Zoltán Gábor VIRÁNYI / HUNLaura MONGIU / ITAKrisztina DOROGI / HUNAnna WILLAM NIELSEN / TAN

Jørgen NIELSENMichael CHRISTIANSENJens Peder PEDERSENTommy BENDIX VILLADSEN

5th semester project

buildinG ConVerSion and renoVation in aarHuS 2009

Page 26: Portfolio of Zoltán Gábor VIRÁNYI

26

COURTYARD SIDE

F

R

F

R

C

D D

V

OFFICE12.35 sm

MEETINGROOM

14.70 sm

OFFICE11.15 sm

RECEPTION14.40 sm

BATHROOM2.75 sm

WORKINGAREA

54.47 sm

2080

6480

6982

3738

38583858

2889

3858

1285

3475

4182

A

A

2080

4182

2082

1405

3818

800

2100 800

2100 800

2100

8002100

8002100

8002100

1200

2100

1200

2100

1800

2100

1800

2100

18002100

18002100

1800

2100

1800

2100

1200

2100

5426 1404 108 388 160 400

108

1725 120 3067120

COURTYARD SIDE

AIRLOCK9.6 sm

STORAGEROOM3.2 sm

STORAGEROOM2.2 sm

BICYCLEDEPOSIT

5.5 sm

TECHNICALROOM8.8 sm

STORAGEROOM3.2 sm

STORAGEROOM3.2 sm

STORAGEROOM2.2 sm

STORAGEROOM3.4 sm

STREET SIDE

STORAGEROOM2.2 sm

LAUDRY15.5 sm

1218

3733

2026

3940

1410

3820 2302

3832

2771

6547

A

A

2423

874

2507 3960

3704

4267

7002100

7002100

7002100

7002100

7002100

7002100

7002100

700

2100 700

2100

700

2100

7002100

1750

2050

1750

2050

1750

2050

1750

2050

1750

2050

1200

2100

2500

2150

366

On the previous page:Front facade of the building after renovation

Right:Plans before and after renovation From left to right - Basement, Ground floor, Typical floor

Page 27: Portfolio of Zoltán Gábor VIRÁNYI

27

Project backgroundThe building on Dannebrogsgade 4, Aarhus was built in 1899 by Master Mason J. Jensen. It is 4½ storeys and originally had 10 apartments, but the two on the top floor were amalgamated into one. The structure of the house was in acceptable condition, but it is more than hundred years old and did not fit the requirements of modern life, therefore needed a comprehensive renovation.

registration

As all renovation projects, this also began with a survey of the existing conditions. We received copies of some of the original drawings, but those didn’t show all the necessary details, so we made a research of the usual building techniques of the age and visited the building personally. The structure for the registration is a 20-point schedule.

outline proposal

The overall basis for this proposal is to bring about the establishment of new bathrooms and kitchens to each dwelling. Each floor level was to be expanded with a gross area of maximum 25 m2. The proposals were to be sketched on the basis of surveys of the existing conditions and discussions with the landlord about the future layout of the dwellings.

The 2 flats at top floor level should be converted into one, as a penthouse apartment. The wish was also to have a roof terrace placed towards the courtyard. The 2 flats at ground floor level were to be changed into offices or for the use of likewise nonindustrial businesses. It was also the owner’s wish that it be possible for tenants to access the basement and the back courtyard without going via the street. When modernizing the building the client would like to have an elevator fitted into the building.STREET SIDE

COURTYARD SIDE

FR

2390

4400

3920

BEDROOM14.20 sm BEDROOM

10.50 sm

BEDROOM10.90 sm

LIVINGROOM19 sm

KITCHEN13.70 smKITCHEN

11 sm

LIVINGROOM20 sm

BATHROOM3.7 sm

BATHROOM4.3 sm

4182

2082

22422312

3978

3733

3945

3978

2760

4415

4182

3945

1200

2658

A

A

800

2100 80

021

00

800

2100

8002100

8002100

800

2100

8002100

1200

2100

1200

2100

1800

2100

18002100

800

2100

8002100

1800

2100

1800

2100

1200

2100

1200

2100

5105 120 1615 108 388 160 400 108 5027

Page 28: Portfolio of Zoltán Gábor VIRÁNYI

28

The existing roof surface was to be removed, including battens, sarking felt and flashing, damaged rafters to be renovated. Total thermal insulation was to be established. Dormers were to be removed and replaced by modern dormers in accordance with the local authority guidelines. A new insulated roof was constructed over the extension.

The basement was rearranged including a laundry, installation room and access from the courtyard.

In connection with the establishment of the extension for the new kitchens and bathrooms, the existing secondary staircase was to be removed and the existing main staircase extended down into the basement via an airlock.

The extension was to be erected as a steel construction with light walls and balconies.

The installations of the house were to be renovated or changed based on the registration.

Many smaller repair-works had to be done also based on the survey.

STREET SIDE

COURTYARD SIDE

C

6520

1603

2715

BEDROOM15.7 sm

BEDROOM15.7 sm

BEDROOM11.8 sm

STORAGEROOM3.2 sm

BATHROOM6.8 sm

STORAGEROOM3.2 sm

3689

5027

3689

2110

2082

0

0

3595

3832

953

A

A

800

2100 800

2100 800

2100

8002100

800

2100

1200

2100

1800

2100

800

2100

8002100

5105

120

1615 495 160 388 120 5027

Above:Sketches showing the process of designing the extension

RightPlan of roof storey before and after renovation

Page 29: Portfolio of Zoltán Gábor VIRÁNYI

29

Section before and after renovation

Page 30: Portfolio of Zoltán Gábor VIRÁNYI

30

Scheme designWe went deeper in the design, what we proposed before, solving technical details, fitting the regulations. All materials and building components had been chosen and documented, also detailed drawings produced. The connections of new and existing parts were considered as critical parts.

Steel structure was examined in details, where dimensions were estimated and connections suggested. Analysis had been made for temporary supports during demolition and conversion.

Solutions for installations showing the way of the different pipes ensuring to have enough space in the walls and suspended ceiling. Further analyses were made U-value, sound and service shafts.

External and internal renderings in perspective for the client in Outline phase

Page 31: Portfolio of Zoltán Gábor VIRÁNYI

31

trapezoidal type 1 H53

125 mm insulation

concrete mades slope (2%)

1 mm vapor barrier

1mm duct water proof

40mm panel of polyurethane

steel plate 10 mm

HEB 180

steel plate of connection 10 mm

bolt d=120 mm

125mm mineral insulation

trapezoidal type H53

copper pipe D=100mm

steel pipe protection

15.4 mm gyproc GFUE12.5 mm gyproc GNE 13 normal Ergo

mineral insulation 45 mm - class 3712.5 mm gyproc GNE 13 Normal Ergo

45 mm air cavity

light brick 60x250x600 mm

5mm steel water protection

connection

12.5 mm plaster

40 mm insulation

10mm vapour proof protection

mades slope concrete 2%

detail design 1The usual Detail design 1 documentation (drawings and specifications for the local authorities to approve) has been made supplemented with applications for waiving the rules (for example closing down rear staircase), and letters to client, police, electricity plant, neighbours etc.

detail design 2

To prepare the Detail design 2 part was an individual assignment. We had to choose one trade of masonry, carpentry or blacksmith’s work and prepare drawings in the company of descriptions for all the work of the trade.

My chosen part was the steel construction. I had to work out work description to a detail were its possible to overview the exact extend of the trades work and to provide a basis for the contractor’s calculation of the price so the received prices in the tender bids are as close to the realistic market price as possible, and the work can be executed as planned. In my case it meant that I had to specify even which kind of bolts and washers the blacksmith has to use. I also prepared detailed assembly drawings for the most important connections, step-by-step planning construction of the steel tower along with a material and cutting list of the used steel elements, bolts etc.

Detail drawing in Scheme design phase Connection of existing and new roof

Detail drawing in Scheme design phase Connection of flat roof with facade

Page 32: Portfolio of Zoltán Gábor VIRÁNYI

32

It was also my job to make case specification, invitation for tender, plan for safety and health, quality assurance, site plan and work specification including tender control plan for the blacksmith contract.

Planning and management

Consultation agreement, fee calculations (for architectural and engineering consultation), two rent calculations (before and after renewal), detailed cost estimate, planning, value management, application for exemptions and building site arrangement was done. We also learned about and practiced Lean Construction Management methods.

Elective subject: 3ds MaxThis three-week course was an introduction to the basic 3D modelling, animation, lighting and rendering functions of Autodesk 3ds Max. We learned to use the program through tutorials, especially examples connected with architectural visualisation.

Above:Model for the structural analysis

Page 33: Portfolio of Zoltán Gábor VIRÁNYI

33

Assembly details of steel construction in Detail design 2 phase

Page 34: Portfolio of Zoltán Gábor VIRÁNYI

34

Page 35: Portfolio of Zoltán Gábor VIRÁNYI

35

P2

Theme

Date of presentation

Project team

Tutors

Implementation of the building process

November 2009

Zoltán Gábor VIRÁNYI / HUNLaura BODERO ALEJALDRE / ESPAndoni CASTILLO / ESPPatricio MOYA OBEL / ESP

Gudmundur Thor SIGURDSSONVibeke KRAGHHenrik JANSSON

6th semester projectWide SPan offiCe buildinG in HorSenS 2009

Page 36: Portfolio of Zoltán Gábor VIRÁNYI

36

Project backgroundIn this semester our team’s role was to be a newly established branch of a contracting company. Our firm was mainly engaged in projects via main and turnkey contracts where the company itself carries out all works in connection with ground works, sewer, paving, concrete and the erection of concrete elements as well as steel works. The first job of this new department was to prepare the tendering and the execution of the new office building of Air Liquid in Horsens. Profit, and hence a positive contribution margin

on the first job, is defined as a success criteria for the new branch.

Project scrutiny, Pricing and bidding

We started with the scrutiny of the received project material in order to identify possible errors and deficiencies including work specifications and geotechnical report. We elaborated a risk assessment, clarified the contract form, the tender procedures and the legal aspects.

1 3 5 7 9 11 132 4 6 8 10 12

A

B

3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600

2592 1008 2592 1008 2592 1008 2592 1008 2592 1008 2592 1008 25922592888 888

43968

1162

8

100825921008 2592100810321008 852 4308

2592

888

1752

888

5508

V04/ - A V02/-A

V01

/ -A

V03

/ -A

ALUSECTION

D01/ -A

8882592888

BD30

F30-MGlasssection

F30-MGlasssection

F30-MGlasssection

F30-MGlasssection

1968 33612

3519150

10650 150 3465120

3480 120 3465 150 8799150

2000100

1542 120 3858390390

5828

120

4900

800

1700

2300

1700

15017001501700150 1700

370

1010

870

1010

800900

4500

100

390

7000

4000

12014

00

7500

22001200200

1650150

1500 150

100810

1008104901010890

2400

100

2800

150

1900

1950

100

150

SECTION C

SECTION C SECTION A

SECTION A SECTION B

SECTION B

SECTION D SECTION D

1488

2592

3828

BD30

F30Glasssection overgypsumwall

Glassdoor BS60 lem

F30-MGlasssection

1501200

2635 1010 4205

3625120

Frys

Køl

Køl

1201800

1201945 120

220

910

850

1700

120

240 1310

14001400

Glassdoor

GlasswallRHS 80 x 80Fireprot. paint to BS 60

8799150

3395

1010

Mailbox

R

R

R R R R R R R

2000

1000

1000

1000

V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A

V01/ - A

V04

/ - A

3720

4020

Sinked down mat

Opv.

ALU

SEC

TIO

N

On the previous page:Illustration for planning of concrete casting, division of foundation and basement walls

Right:Ground floor plan

Page 37: Portfolio of Zoltán Gábor VIRÁNYI

37

1 3 5 7 9 11 132 4 6 8 10 12

A

B

3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600

2592 1008 2592 1008 2592 1008 2592 1008 2592 1008 2592 1008 25922592888 888

43968

1162

8

100825921008 2592100810321008 852 4308

2592

888

1752

888

5508

V04/ - A V02/-A

V01

/ -A

V03

/ -A

ALUSECTION

D01/ -A

8882592888

BD30

F30-MGlasssection

F30-MGlasssection

F30-MGlasssection

F30-MGlasssection

1968 33612

3519150

10650 150 3465120

3480 120 3465 150 8799150

2000100

1542 120 3858390390

5828

120

4900

800

1700

2300

1700

15017001501700150 1700

370

1010

870

1010

800900

4500

100

390

7000

4000

12014

00

7500

22001200200

1650150

1500 150

100810

1008104901010890

2400

100

2800

150

1900

1950

100

150

SECTION C

SECTION C SECTION A

SECTION A SECTION B

SECTION B

SECTION D SECTION D

1488

2592

3828

BD30

F30Glasssection overgypsumwall

Glassdoor BS60 lem

F30-MGlasssection

1501200

2635 1010 4205

3625120

Frys

Køl

Køl

1201800

1201945 120

220

910

850

1700

120

240 1310

14001400

Glassdoor

GlasswallRHS 80 x 80Fireprot. paint to BS 60

8799150

3395

1010

Mailbox

R

R

R R R R R R R

2000

1000

1000

1000

V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A V01/ - A

V01/ - A

V04

/ - A

3720

4020

Sinked down mat

Opv.

ALU

SEC

TIO

N After this we took off quantities, defining work methods and equipment to be used, then calculated work hours for workers and machinery. We collected prices of materials and price quotations from sub-contractors. We used the resulting price to make a bid for the construction project.

tender, Contract finalisation and execution

After winning the tender (as every other team) we set up the contracts with the client, sub-contractors and suppliers as well as coordination agreement.

We made a planning for the construction in consideration of resources, processes and time, as well as a cash flow budget. We arranged the site meetings, safety and health planning and the quality assurance of the project (with process control) along with a work environment assessment of the building site.

We prepared working drawings and work descriptions for the construction like excavation plan or drawing for concrete casting. We managed the finances of the project including interim payments.

We made the necessary documents for the handing over procedure, like notice of completion, QA of handing over, final accounts, guarantees or operation and maintenance plan.

Course Study unit - operation and maintenance

We learned to systematically prepare and communicate maintenance instructions / manuals for new buildings, in a form that complies with the demands in the laws for government grant-supported buildings. The course included information about legislation, lifespan of materials and building components as well as methods in connection with building component log and budgets.

Right and bottom right:

Photos of the finished building

Page 38: Portfolio of Zoltán Gábor VIRÁNYI

38

Page 39: Portfolio of Zoltán Gábor VIRÁNYI

Theme

Date of presentation

Project team

Tutors

39

Industrial buildings and industrially produced building components

June 30

Zoltán Gábor VIRÁNYI / HUNNikolay EVSTATIEV / BULSimona BACHVAROVA / BUL

Karsten BANK OLESENAnders PETERSENSøren FREDERIKSENLeila Kæmsgaard Pagh SMIDTGordon Lindsay ALCOCK

3rd semester project

offiCeS and WorkSHoP built WitH PrefabriCated eleMentS 2010

Page 40: Portfolio of Zoltán Gábor VIRÁNYI

40

Project backgroundOur client was the Diamond Jewelry Plc., and its managing director Søren Svendsen. The company manufactures and sells jewelry all over Denmark. It decided to expand into the European market and to build a modern new factory and office block under the same roof to replace their existing older rented property.

Prefabricated construction is very popular in Denmark, and made in a high quality; it was a great opportunity to learn about this technology there.

Demands

The client gave us the following guidelines for the design and tendering of the new premises.

The building should – where possible – consist of prefabricated building components. Materials should be selected on the basis of environmental loading and recycling potential. District heating, mechanical ventilation and heat recycling are specified.

The building should comply with current legislation in BR2008. The building should be quality assured on the basis of Ministry of Housing’s ‘Building works Quality Assurance Directive’ March

2004. Projection and design should be done in accordance with ‘Engineer and Architects service specifications in Building and Planning – April

2006’. Tender bids should be invited on the basis of the Detail Design 1 according

to BIPS A113 model 5, which allows the contractor to

finalise the planning and design and

prepare the final cost calculations.

Svendsen believes in supporting local authority job opportunity schemes. Two employees are employed

in ‘WORKSTEP’ job support schemes with government subsidies. One of his staff members was seriously injured in a traffic accident and worked from a wheelchair, therefore the building had to be designed with extra consideration to physically challenged or those with reduced working capacity.

On the previous page and above:

Perspectives for the client in Outline phase

Page 41: Portfolio of Zoltán Gábor VIRÁNYI

41

outline proposalWe have been given a preliminary proposal for the project, but we were also assigned to scrutinise and change certain things, then complete the outline.

We had to modify the plan so that it is suitable for 25 employees and give proposals for a potential extension for an exhibition centre. A reception and a kitchen area had to be included. The

production area was to be designed as a heavy construction of concrete elements, while the sales, marketing and office section was to be a lightweight construction using timber elements. The ground floor construction in the store and workshop area was to be dimensioned for truck driving. The structural system for the whole building had to be determined.

We were also responsible for the time and financial schedules

Floor plan in Scheme design phase

Page 42: Portfolio of Zoltán Gábor VIRÁNYI

42

a l o n g w i t h

the on-going development of the

project.

Scheme design

As the main part of the design phase, we developed a more specific definition of the building in terms of rooms, room function, space requirements and not least a definition of the most predominant building materials, constructions and building components. We also upgraded the cost estimation and the project time schedule.

We found solutions to fit the demands of the different installations, what had been researched in the outline phase.

detail design 1 and tenderingDetail design is the phase to produce

documentation - drawings and specifications - in a standard (BIPS A113 model 5) to form basis for authority

approval and tendering. It contains all details of the final

project design that are relevant to the authorities, those of the architectural

design, choice of construction and materials as well as technical installations. The documentation includes an application for building permit, plans (1:100), sections (1:20), elevations (1:100), structural calculations, technical installations and calculation of heat loss.

We managed an online tender procedure through docia.com that absolutely fits the methods used in the Scandinavian construction sector. For this, we produced the relevant tender documents such as invitation for tender, tender application form, tender control plan, tender time schedule, works- and case specification, and building site plan. We experienced this process from both sides as we applied for the tender of another group of the class as a contractor company.

Above:Model for the Structural analysis

Right top:Connection of wooden roof and facade

Right middle:Connection of TTS element and concrete gable

Right bottom:Connection at the corner of wooden walls

Page 43: Portfolio of Zoltán Gábor VIRÁNYI

43

Non project-related coursesConcrete in relation to prefabrication of building elements

The course gave detailed knowledge about the material characteristics of concrete such as composition, characteristics and adaptability. We learned about standards and other quality demands along with construction principles including protective methods. We studied environmental aspects and commercial dimensions of concrete.

Wood in relation to prefabrication of building elementsThis course taught similar aspects of timber-based products as the previous one did about concrete.

Moisture in buildingsThe classes gave insight in the use of SBi Guide 173 – Moisture protection of buildings. After receiving theoretical information, we calculated damp pressure

and dew point using calculating software and diagrams. We examined general construction types and those used in the semester project in particular.

For more details request my ‘Moisture course assignment’.

Energy and Energy Frame in accordance with BR08We learned the theory, and calculated energy frame in accordance with the Building Regulation 2008 and SBi Direction 213 – Energy requirements for buildings. We used the calculation program Be06 developed by the Danish Building Research Institute (SBi) and the Danish Energy Agency (EnS).

Elective module

The Elective Module report is an individual assignment to be assessed independently and outside semester project context. We were free to choose any subject for the report as long as it is related to the building industry. Introduction to the elective module takes place at the beginning of the semester through a number of introductory presentations given by lecturers and by external professionals. A few weeks into the semester each student was asked to hand in a preliminary memo to the team coordinator outlining the problem statement. Hereafter, we were assigned a tutor who provided guidance throughout the assignment period. The report had to contain an investigatory professional text about the chosen subject. I worked on the topic ‘Aesthetics in sustainability’ with one of my classmates.

See more at ‘Essays’.

Perspectives for client in Outline phase

Page 44: Portfolio of Zoltán Gábor VIRÁNYI

44

Production of facade elementAfter Detail design 1 we had been placed in the role of manufacturers, where we took over the project materials from one of the other groups for further adaptation. The process started with scrutinizing the received material. Hereafter the elements had been designed and the manufacturing process planned. The assignment consisted of subject areas within, planning and design, production technology, financial aspects and organisation.

Product design

In the role of a manufacturer of wooden facade elements, we had to produce a detailed design of building elements. We had a professional cooperation with the team, who played the role of the contracting party, our client. We also planned the production process including such considerations as the factory layout, needed human resources, used materials and price of the product.

establishment of industrial production and business plan

We were assigned to set up a company, a producer of timber elements. We examined the way of starting a new business, special considerations about the building sector and Danish business methods. We followed

Ventilation duct sizes based on air amount calculation

Summary of facade elements

Page 45: Portfolio of Zoltán Gábor VIRÁNYI

45

examples from real life and tried to do everything as we would in a real business. We had lectures about the subject and made research on the Internet, in the library and by visiting existing companies to have both theoretical and practical knowledge and to find out the traditional methods which have stood the test of time along with the newest innovative techniques. Next to the financial success of our company, we considered environmental, social issues as well as the well-being of our workers.

We defined the objectives and missions of the firm, planned the structure of the company including the business formation and human resources and also located the factory. We made product description, planned the financing and the budget, created sales and marketing strategy.

For more details request my ‘Business plan report’.

Left bottom:Connection of wooden facade elements

Left:Model of a Wooden facade element for assembly animation

Page 46: Portfolio of Zoltán Gábor VIRÁNYI

46

Page 47: Portfolio of Zoltán Gábor VIRÁNYI

47

Theme

Date of presentation

Project by

Consultants

Final design project (Bachelor project)

January 2011

Zoltán Gábor VIRÁNYI / HUN

Roger Howard TAYLORSvend Erik BENDTSENHenrik KOPPPer CHRISTENSENJean-Marie PALLIEREmmanuel FERRIER

7th semester project

Care HoMe for younG PeoPle WitH brain inJury in HedenSted 2010 (in ProGreSS)

Page 48: Portfolio of Zoltán Gábor VIRÁNYI

48

DN

DN

AN0X2(2BY)001

1Elevation North

AN0X2(2BY)0021

Elev

atio

n Ea

st

AN0X2(2BY)0041

Ele

vatio

n W

est

AN0X2(2BY)003

1Elevation South

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

A A

B B

C C

D D

E E

F F

G G

H H

I I

11.5 m²Bedroom

1.02

6.6 m²Bathroom and Toilet

1.03

20.34 m²Kitchen and Living room

1.01

11.76 m²Bedroom

2.026.99 m²

Bathroom and Toilet2.03

20.43 m²Kitchen and Living room

2.01

11.76 m²Bedroom

3.02

6.99 m²Bathroom and Toilet

3.03

20.43 m²Kitchen and Living room

3.01

11.5 m²Bedroom

4.02

6.6 m²Bathroom and Toilet

4.03

20.34 m²Kitchen and Living room

4.01

11.5 m²Bedroom

5.02

6.8 m²Bathroom and Toilet

5.03

20.43 m²Kitchen and Living room

5.01

11.76 m²Bedroom

6.02

6.99 m²Bathroom and Toilet

6.03

20.43 m²Kitchen and Living room

6.01

11.76 m²Bedroom

7.02

6.99 m²Bathroom and Toilet

7.03

20.43 m²Kitchen and Living room

7.01

11.5 m²Bedroom

8.02

6.6 m²Bathroom and Toilet

8.03

20.34 m²Kitchen and Living room

8.01

15.84 m²Meeting Room

15

13 m²Office

14

9.92 m²Office

13

9.76 m²Office

12

25.3 m²Common Activity Room

11

6.56 m²Toilet

10

9.07 m²Laundry

16

Section CC

AN0X3(2BY)003Section CC

AN0X3(2BY)003

Section DD

AN0X3(2BY)004Section DD

AN0X3(2BY)004

Section AA

AN0X3(2BY)001

Section AA

AN0X3(2BY)001

Section BB

AN0X3(2BY)002

Section BB

AN0X3(2BY)002

10.86 m²Corridor

01

10.86 m²Corridor

03

43.5 m²Corridor

04

40.64 m²Hall05

22.85 m²Kitchen

06

22.19 m²Kitchen

0720.66 m²Corridor

09

22.46 m²Hall08

15.86 m²Corridor

02

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

1 : 100

Care Home for Young People With Brain Damage

Ground floor plan

Zoltán Gábor VIRÁNYI

20/09/2010

AN011(2ET)001CAHS77P

AN011(2ET)001

1 : 10002 Groundfloor, terrain

Project backgroundApartments for young (18-50 years-old) people who suffered traumatic brain injury, therefore not able to take care about themselves. There are 8 separate apartments each one sufficient for housing one person. It contains a bedroom, a lavatory with shower and toilet, a living room and kitchen area. Each of them has a terrace.

The care home should also consist of administrative (3 offices and a meeting room) and common spaces (two common kitchens, a laundry and a common activity room). There is a basement part containing changing rooms with shower for the staff, storage areas and technical room.

The care home is being built for physically and psychically challenged tenants; therefore it must be level-free and totally accessible for people with various disabilities including all outer areas (excluding the basement).

It is an individual multidisciplinary project that documents the most important aspects and reflects the totality of the Constructing Architect education.

The project contains phases from Outline brief to Detail design 2.

exchangeThe project is being made as an exchange student in the Université Claude Bernard Lyon 1 - L’Institut Universitaire de Technologie A in Lyon, France.

I have consultants from the Danish VIA University College, whom I keep contact with on the Internet through email, Skype and online worksharing methods. Two French tutors are helping my work with advices personally in Lyon.

Even though I will be evaluated by my Danish teachers, I follow the Danish regulations and working methods; I have the opportunity to make a comparison with the French legislation, construction and management techniques. The local tutors are also going to participate on my final examination.

I also study French language in the UCBL.

dissertation

During the semester I also work on my thesis, what has connection with the local architecture and urbanism.

See more at Essays.

On the previous page:Perspective view from south in the Outline Proposal

On the right:Ground Floor plan in Outline phase

Page 49: Portfolio of Zoltán Gábor VIRÁNYI

49

DN

DN

AN0X2(2BY)001

1Elevation North

AN0X2(2BY)0021

Elev

atio

n Ea

st

AN0X2(2BY)0041

Ele

vatio

n W

est

AN0X2(2BY)003

1Elevation South

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

A A

B B

C C

D D

E E

F F

G G

H H

I I

11.5 m²Bedroom

1.02

6.6 m²Bathroom and Toilet

1.03

20.34 m²Kitchen and Living room

1.01

11.76 m²Bedroom

2.026.99 m²

Bathroom and Toilet2.03

20.43 m²Kitchen and Living room

2.01

11.76 m²Bedroom

3.02

6.99 m²Bathroom and Toilet

3.03

20.43 m²Kitchen and Living room

3.01

11.5 m²Bedroom

4.02

6.6 m²Bathroom and Toilet

4.03

20.34 m²Kitchen and Living room

4.01

11.5 m²Bedroom

5.02

6.8 m²Bathroom and Toilet

5.03

20.43 m²Kitchen and Living room

5.01

11.76 m²Bedroom

6.02

6.99 m²Bathroom and Toilet

6.03

20.43 m²Kitchen and Living room

6.01

11.76 m²Bedroom

7.02

6.99 m²Bathroom and Toilet

7.03

20.43 m²Kitchen and Living room

7.01

11.5 m²Bedroom

8.02

6.6 m²Bathroom and Toilet

8.03

20.34 m²Kitchen and Living room

8.01

15.84 m²Meeting Room

15

13 m²Office

14

9.92 m²Office

13

9.76 m²Office

12

25.3 m²Common Activity Room

11

6.56 m²Toilet

10

9.07 m²Laundry

16

Section CC

AN0X3(2BY)003Section CC

AN0X3(2BY)003

Section DD

AN0X3(2BY)004Section DD

AN0X3(2BY)004

Section AA

AN0X3(2BY)001

Section AA

AN0X3(2BY)001

Section BB

AN0X3(2BY)002

Section BB

AN0X3(2BY)002

10.86 m²Corridor

01

10.86 m²Corridor

03

43.5 m²Corridor

04

40.64 m²Hall05

22.85 m²Kitchen

06

22.19 m²Kitchen

0720.66 m²Corridor

09

22.46 m²Hall08

15.86 m²Corridor

02

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

1 : 100

Care Home for Young People With Brain Damage

Ground floor plan

Zoltán Gábor VIRÁNYI

20/09/2010

AN011(2ET)001CAHS77P

AN011(2ET)001

1 : 10002 Groundfloor, terrain

Page 50: Portfolio of Zoltán Gábor VIRÁNYI

50

Page 51: Portfolio of Zoltán Gábor VIRÁNYI

51

10 weeks from 6 July 2009

ETALON Építő- és szerelőipari Kft. (ETALON constructions and assembly Ltd.)Császárrét, 7400 Kaposvár, Hungarywww.etalonkft.eu

Ferenc SZÉKELYIstván LENGYEL

Roger Howard TAYLOR

Duration

Host Company

Contact persons

Practical Placement Coordinator

PraCtiCal PlaCeMent 2009

Page 52: Portfolio of Zoltán Gábor VIRÁNYI

52

Projects at the Practical Placement

piece - and one separate boiler-building.

The three parts are built in a mixture of prefabricated concrete elements, cast concrete and brick construction. The original builders made several serious mistakes during the construction including missing materials, technological mistakes,

the CompanyETALON Építő- és Szerelőipari Kft. is a private limited company founded in 1991. It presently employs approximately 40 persons. Headquarters are situated in Kaposvár, Hungary, but the company is involved in constructions countrywide.

It is mainly engaged in projects via main contracts. They are carrying out different constructions; dwellings as well as supermarkets or public places.

the renovation and innovation of the Public bath of kaposvár

The swimming pool and medical bath was built in 1967-68 and was totally renovated between 1985 and 1997. The 50m outdoor swimming pool was built in 1995, modernized in 1999 and is convertible since 2000. On the former site of the beach, a “fun-bath” (called Flower-bath or Virágfürdő in Hungarian) opened in 2005.

The main building, where the renovation took place, can be divided into three parts – the 25 m indoor swimming pool, the medical or thermal part and the entrance

which is why the structural system had to be reviewed and partly strengthened.

The complex did not meet the European regulations on accessibility. There were not enough parking places. Coverings and outside cobblestones were aged.

On the previous page:Perspective of the extension of the public bath after finishing the construction

On the right:Perspective about the bath before the construction

Page 53: Portfolio of Zoltán Gábor VIRÁNYI

53

The building is only forty years old, but the construction is made in so bad quality, that a total renovation became necessary. The building had been demolished until its structure, the statical elements partly changed or strengthened, the building services updated.

The town wanted to increase the tourism, so they decided to invest in the innovation of the public bath. This also answered the downturn of the construction market.

The major extension was the new wellness part with two stories, one outdoor pool with 150 m2 water-surface and one indoor pool with 250 m2, which are connected through flood-gates. Sauna, fitness, hair dresser, cosmetic services will be available.

The existing parts had been reorganized; made to fit to the accessibility demands and to be able to select the guests onto different areas. In the east wing the medical part had been enlarged to the place of the demolished sunbath-terrace.

The entrance part became two-storey high, with a more modern space-usage and look. A restaurant is placed here.

I spent most of the time of my practical placement on this site. My direct principal was the building site manager and his

foreman; I collaborated with a technician and another intern.

My job was mainly to keep contact with the subcontractors, produce work-drawings, measure on site, organize work, managing supplies and administrate.

Multi-storey dwellings in Pécs

The project consists of 6 multi-storey buildings, parking- and green areas.

The structure is a monolithic concrete system; the walls are made of bricks and lightweight concrete elements. Tiled roof

on timber structure.

I worked on the expected budget of the project. I made measurements, cost estimation, calculations. My principals were the leader of the financial department and one of the owners of the company.

For more details request my ‘Practical Placement Report’.

Perspective of the project in Pécs

Page 54: Portfolio of Zoltán Gábor VIRÁNYI

54

Page 55: Portfolio of Zoltán Gábor VIRÁNYI

55

eSSayS 2010

Page 56: Portfolio of Zoltán Gábor VIRÁNYI

56

aesthetics in sustainability 2010

has reached a state, where – with careful considerations - it really can improve the visual outlook of today’s buildings. The report gives examples and illustrations of various aspects of green architecture. It also examines the roles of various professional involved in building and suggests a specific role for Constructing Architects.

key words

Green architecture, sustainability, aesthetics, renewable energy, healthy building, natural material, recycle and reuse, solar energy.

research questions

1. What exactly is involved in the term ‘green architecture’?

2. What design potential is there using green architectural technology?

3. What limitations are there in alternative design usage of green architecture?

If you are interested, request the essay.

titleAesthetics in sustainability (or sustainability in aesthetics)

Written by

Zoltán Gábor VIRÁNYIMahamed Yousuf ABDI

date

April 2010

abstract

This report gives an overview of the concept of green architecture by looking back at the beginning of this movement and comparing different definitions. We have acknowledged how the term ‘green architecture’ has developed through time and the visionaries behind the concept. We also studied the techniques applied for green solutions and analysed if they are aesthetically accepted in the world of design. In accordance with the potential usage of the methods, we also found limitations and possible challenges. The report concludes that green architecture

On the right:Wind turbine and Solar cells in the Nordisk Folkecenter near Hurup, DenmarkA non-profit research centre for renewable energy that we visited with some friends

Page 57: Portfolio of Zoltán Gábor VIRÁNYI

57

baCHelor’S tHeSiS: urban renewal in lyon-Confluence 2010

titleUrban Renewal in Lyon Confluence. How to transform an unused industrial area to the new eco-quarter?

date

November 2010

abstract

This study analyses the possibilities to redefine an urban district in an ecological way. The basis of the research is a case study of the urban renewal project to convert the area formed by the confluence of the Rhône and Saône rivers in Lyon, France.

The dissertation gives an overview of the development of the district in order to see the historical reasons that made the project necessary. The Confluence area played an important role in the industrial development of the city, but became unwanted as it was in the end of the 20th century. It is in a strategic location, therefore the local authority aimed to develop it into the extension of the current city centre forming a valuable area with

mixed use.

In order to analyse the ecologic aspects of this development, the report attempts to clarify the idea of sustainability. It shows the development of the theories through a chronological review of the important studies, movements, conferences and agreements. Some of the relevant certifi-cates and evaluation tools are introduced to gather practical indicators of urban s u s t a i n a b i l i t y .

renewal project that can be used during future ecologic development of neighbourhoods.

key words

urban, ecologic, redefined function, renewal, case study, development, Lyon, district, Confluence

If you are interested, request the thesis.

Perspective over the Place Nautique in the renewed Conflence district in Lyon, France

A framework of analysis is estab-lished by princi-ples restricted to the ecologic as-pects of sustain-ability.

The case is e x a m i n e d through these p r i n c i p l e s . Finally further s u g g e s t i o n s are made in c o n n e c t i o n with the current

Page 58: Portfolio of Zoltán Gábor VIRÁNYI

58

Page 59: Portfolio of Zoltán Gábor VIRÁNYI

59

2004-2006HuManitieS & art StudieS

Page 60: Portfolio of Zoltán Gábor VIRÁNYI

60

I spent only three semesters studying humanities, before I changed in order to follow more practical education. Even though I never finished those studies, they gave me a base knowledge and they are still determinative in my way of thinking about arts or theories. The English programme gave me important language education; cinema is still a field of my personal interest.

instituteuniversity of Pécs, faculty of Humanities

The Faculty of Humanities is set up of two related disciplines: humanities and social sciences. Our trainings provide both contemporary academic knowledge and skills; they also add to the reflective and critical thinking of the students and to the development of social, communicative and technical abilities.

english major programme 2004-2006The range of subjects taught in lecture and seminar courses with 1-3-academic-hour-long sessions are grouped as follows:• Introductory and language development courses • Professional courses covering the larger fields of English

literatures and cultures, linguistics and applied linguistics • Elective courses specialising in the above four fields,

respectively• Major exams: language proficiency exam, comprehensive

exam in English linguistics and in British and American literatures.

Education in this programme lasts for ten semesters (five years) for students who major in another subject beside English.

Main finished subjects:

Linguistics, History of the USA, Writing and research

film theory and film history major programme 2004-2006The Film Theory and Film History major offers a general overview on the history and theory of film, as well as a critical understanding of mechanisms and genres of popular film culture, with emphasis on academic and critical writing and filmmaking practices. Students can learn about the different periods of Hungarian and world film history, different theoretical approaches of film studies, different filmic genres, and can also practice some skills of reading theoretical texts and interpreting films. The programme also gives insight to liberal arts: for example branches of philosophy like aesthetics, or history of arts.

Main finished subjects:

Aesthetics, Semiotics, Drama theory, Sociology, History of arts, Theory of vision, Psychology, Social psychology

Studies on the faculty of Humanities

Page 61: Portfolio of Zoltán Gábor VIRÁNYI

61

Main entrance of University of Pécs, Faculty of Humanities

Page 62: Portfolio of Zoltán Gábor VIRÁNYI

62

Picture credits

University of Pécs 8, 9

Kuba Piaszczyk 12

Guillaume Caussarieu 13, 15

C.F. Møller Architects 14

Autodesk, Inc. 32 (in box)

Kasper Reid Harder Rasmussen 37 (both)

Etalon Ltd. 50, 52, 53

Depaule/PAD/Asylum 57

Dániel Csörföly 60

Page 63: Portfolio of Zoltán Gábor VIRÁNYI

i am happy if you share this document!it is available under the

Creative Commons attribution-nonCommercial-Sharealike licence.

Page 64: Portfolio of Zoltán Gábor VIRÁNYI

Portfolio2004-2010

Zoltán Gábor Virányi