possible post 2012 cdm key challenges david lesolle, botswana

8
european capacity building initiative ecbi Possible Post 2012 CDM Key Challenges David Lesolle, Botswana e u r o p e a n c a p a c i t y b u i l d i n g i n i t i a t i v e r o p é e n n e d e r e n f o r c e m e n t ecbi for sustained capacity building in support of international climate change negotiations pour un renforcement durable des capacités en appui aux négociations internationales sur les changements climatiques

Upload: jermaine-rush

Post on 30-Dec-2015

39 views

Category:

Documents


0 download

DESCRIPTION

ecbi. european capacity building initiative initiative européenne de renforcement des capacités. Possible Post 2012 CDM Key Challenges David Lesolle, Botswana. for sustained capacity building in support of international climate change negotiations - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiPossible Post 2012 CDM

Key ChallengesDavid Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive

initia

tive e

uro

péen

ne d

e re

nfo

rcem

en

t des

cap

acité

s

ecbi

for sustained capacity building in support of international climate change negotiations

pour un renforcement durable des capacités en appui aux négociations internationales sur les changements climatiques

Page 2: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

CDM – a good buy in

Experience now existsOpportunities are attractiveMethods are in place and continue to be developed

Lessons: •SD issues under CDM provide opportunities to level the playing field•Provide an opportunity to move forward and improve the CDM post 2012.

Page 3: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Main Issues

•How to improve CDM?•How to address the lack of a fair Geographical Distribution of CDM?•How to bring in the Most Vulnerable – zero-CDM areas?•How to develop and improve capacity for CDM?

Lessons:How to use the post 2012 CDM to address these issues.

Page 4: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Beyond Project based CDM

Different types of options:

•Programmatic (growing number of projects over time)

•Bundling (a number of projects – one time)

•Policy (Using Policy approaches to addressing/implementing CDM)

•Benchmarking (additionality)

Page 5: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

The Future CDM

•Establish a common approach•Consider a future CDM as part of a post 2012 regime/way of doing business

As AI Governments go for NAI bilateral programme – incorporate CDM and also SD at same time – SD must drive.

Page 6: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

CDM and SD

•Strong SD requirement do not mean lack of investment

•Consider SD lessons and SD Criteria to be considered INTRA G77 – CSD as basis

•Additionality: Financial and Environmental – are they working/useful. Impacts on baseline, efficiency of Mechanism …

Page 7: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Other Issues

•Do we only stabilise or reduce – CDM is not helping us achieve overall reduction

•There is need for more Tech Transfer

•CDM only +ve impact on mitigation targets when CERs are cheaper

•CDM MUST help achieve SD

•Art 12 – emphasises on SD under CDM – this is not practised – we have drifted away

Page 8: Possible Post 2012 CDM Key Challenges David Lesolle, Botswana

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Other Issues (II)

•Develop a 2nd (new) Stream of projects through POLICY CDM

•Policy CDMs need be enabled through innovative financing and capacity building

•Important to emphasise SD and not Equitable Distribution of CDM… SD to enhance CDM project activity… POLICY CDM, Aggregate CDM …

•CDM is transparent – but needs more public comment, NGO comment, balance NGO (S&N)