power summit 11 april 2012
TRANSCRIPT
-
8/2/2019 Power Summit 11 April 2012
1/9
POWER SITUATION
April 2012
-
8/2/2019 Power Summit 11 April 2012
2/9
Capacity MixLUZON VISAYAS MINDANA
O
BASELOAD
POWERPLANTS:
63.94%
BASELOAD
POWERPLANTS:
71.88%
BASELOAD
POWERPLANTS:
37.31%
Note: Base-load Power Plants are the facilities used to meet some or all of a given continuous
energy demand, and produce energy at a constant rate, usually at low cost relative toother facilities available to the system
InstalledCapacity =
11,869 MW
InstalledCapacity =
2,393 MW
InstalledCapacity =
1,971 MW
-
8/2/2019 Power Summit 11 April 2012
3/9
Geothermal HydroCoal Oil-
basedNatgasSource: DOR & DOH of NGCP
Legend:2012 System PeakDemand
2012 Max
Peak =7,463 MW
MinCapacity= 7,592
MW
MaxCapacity
= 9,127MW
2012 MinPeak =
5847 MW
-
8/2/2019 Power Summit 11 April 2012
4/9
Source: DOR & DOH of NGCP
Legend:Geothermal
Hydro
Coal Oil-based
2012 System PeakDemand
2012 MaxPeak =
1,423 MW
2012 MinPeak =
1,205 MW
MinCapacity= 1,545
MW
MaxCapacity= 1,843
MW
-
8/2/2019 Power Summit 11 April 2012
5/9
-
8/2/2019 Power Summit 11 April 2012
6/9
Mindanao Power SituationStatus of Hydroelectric Power Plant
Notes: Peak capacity refers to the capability of the power plant to operate continuously fo
three hours. Off-peak capacity is the minimum stable plant loading.
Peak Off-peak Agus 1 11 11 1
Agus 1 111 11 1Agus 1 .1111 111 111
Agus 1 11 11 1Agus 1 111 111 11
Agus1 11 11 1
Pulangi 111 111 1Total .1111 111 11
Available Capacity (MW)Plant Name
InstalledCapacity(MW)
-
8/2/2019 Power Summit 11 April 2012
7/9
Mindanao Power SituationStatus of Thermal Power Plant
Notes: Peak capacity refers to the capability of the power plant to operate continuously fo
three hours. Off-peak capacity is the minimum stable plant loading.
Peak Off-peak Mindanao Coal (STEAG) 111 111 111
Mt. Apo Geo .111 1 11 1APTMI 1 .1111 11 1APTMI 1 .1111 11 1SPPC 11 11 1WMPC 111 11 1PB 111 11 11
IDPP 111 1Total .1111 111 11
Available Capacity (MW)Plant Name
InstalledCapacity(MW)
-
8/2/2019 Power Summit 11 April 2012
8/9
Power Supply-DemandSituationMarch 2012
Notes: Source of data, NGCP Daily Operation Report * Actual System Peak Demand for the Month of March 2012 for Luzon-Visayas Grid * Projected System Peak Demand for the Month of March 2012 for Mindanao Grid
Power Supply andDemand
LUZON VISAYAS MINDANAO
Available Capacity 9,127 1,843 1,280Peak Demand* 7,346 1,423 1,300
Surplus/(Deficit) 1,781 420 (20)Required Reserve
Margin
1,588 257 150
Peak Demand +Reserve Margin
8,934 1,680 1,450
Surplus/(Deficit) @Demand + ReserveMargin
193 163 (170)
Pulangi afterrepair
100
EmbeddedGeneration
74
-
8/2/2019 Power Summit 11 April 2012
9/9
POWER SITUATION
April 2012
END OF PRESENTATION