RIA Target Station Design and InfrastructurePresented by: Reg Ronningen (MSU)
Prepared by Tony Gabriel and Dave Conner (Oak Ridge National Laboratory)RIA R&D Participants:
Argonne National Lab: J. Nolen
Lawrence Berkley Nation Lab: L. Heilbronn
Lawrence Livermore National Lab: L. Ahle, J. Boles, S. Reyes, W. Stein
Los Alamos National Laboratory: Dave Viera
Michigan State University: I. Baek, G. Bollen, M. Hausmann, D. Lawton, P. Mantica, D. Morrissey, R. Ronningen, B. Sherrill, A. Zeller
Oak Ridge National Lab: J. Beene, T. Burgess, D. Conner, T. Gabriel, I. Remec, M. Wendel
2nd High-Power Targetry Workshop October 10–14, 2005
Oak Ridge, TN
![Page 2: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/2.jpg)
2
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
RIA Overview
R&D Activities Overall Layout and Parameters Remote Maintenance Requirements ISOL Target Design and Analysis Fragmentation Beam Dump Design Project Status
![Page 3: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/3.jpg)
3
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Rare Isotope Accelerator (RIA)DOE Sponsored R&D Areas Beam Simulation Front End Driver Linac (2nd
Stripper Region RH Considerations) Isotope-Separator-on-Line (ISOL) Fragment Separation- for Fragment Separators Fragment Separation- for Gas Cell Post Acceleration Multi User Considerations
![Page 4: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/4.jpg)
4
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
ISOL Target
Analysis and evaluation of target concepts (Mercury, Tungsten/Water Cooled)
Identification of required utilities and corresponding remote maintenance capabilities
Activation and Heating Calculations Target Gallery layout and optimization for
maximum availability
![Page 5: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/5.jpg)
5
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Fragmentation Target
Development of simulation codes for heavy ion transport
Evaluation of Beam Dump for full range of production scenarios [Cu (water or gas cooled), Lithium Stream]
Development of high-power target concepts Simulation of radiation doses to magnets and other
components Development of concepts for remote maintenance for
damaged components Materials Research
![Page 6: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/6.jpg)
6
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Multi-User Considerations
Incorporate capability for simultaneous independent experiments
Multiple target vs. Cost Optimization Maximize availability
![Page 7: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/7.jpg)
7
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
The RIA facility schematic layout and areas of R&D
![Page 8: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/8.jpg)
8
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
A Possible RIA Site Layout
![Page 9: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/9.jpg)
9
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
RIA Parameters List
WBS Parameter BaseValue Unit Comments
1.0 GLOBAL PARAMETERS1. 0. Maximum beam power on target 400 kw1. 0. Primary beam kinetic energy on target 1.0 GeV protons
400 MeV/u uranium1. 0. Beam Frequency Steady State1. 0. Protons/sec 2.5x10151. 0. Ion Types H thru Uranium1. 0. Front end length TBD1. 0. Linac Length TBD1. 0. HEBT Length TBD1. 0. RTBT Length TBD1. 0. Maximum uncontrolled beam loss 1 W/m1. 0. ISOL Target material Hg,W,Ta,Ucx …..1. 0. Fragmentation target material Li, Graphite, ??1. 0. Number of ISOL targets 2 (3rd optional)1. 0. Number of Fragmentation targets 21. 0. Number of stripper stations 21. 0. Initial number of instruments ??
![Page 10: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/10.jpg)
10
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
85m x 60m
75m x 16.5m
RIA Target Gallery Layout
![Page 11: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/11.jpg)
11
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
RIA Beam production area
ISOL type beams
Fast fragment beams
• High-power target design (ANL, ORNL, MSU)• Development of overall concepts for the beam production areas
(MSU, ORNL, LLNL, LBNL, LANL, ANL)
Challenges: High power + high power densityFrequent target changes
![Page 12: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/12.jpg)
12
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
![Page 13: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/13.jpg)
13
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
HIGH BAY AREA
DUAL SERVOMANIPULATORS
(SHOWN IN STORAGE POSITION)
TRANSFER CELL
(HANDS ON MAINT.) BASEMENT/
WASTE DISPOSAL
INCELL SHIELD DOORS
ISOL TARGET STATIONS
FRAGMENTATION TARGET STATIONS
FRAG SHIELDED STORAGE AREA
FRAG MAINTENANCE/DECON CELL
50 TON GALLERY CRANE
100 TON HIGHBAY CRANE
ISSUES CELL ACCESS (CONTAMINATION)
SHIELD DOORS
![Page 14: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/14.jpg)
14
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
SHIELDED HOTCELL
ISSUES MODULE SIZE
DOSE LIMITS?
![Page 15: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/15.jpg)
15
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
BRIDGE MOUNTED SERVO MANIPULATOR
![Page 16: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/16.jpg)
16
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
ISOL BEAMS
FRAGMENTATION BEAMS
![Page 17: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/17.jpg)
17
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
FLIGHT TUBE
BEAM DIANOSTICS
LI TARGETQUADRAPOLE SET
DIPOLE
BEAM DUMP
SHIELDING
ISSUES COMPONENT SIZE
LIFETIME
COUPLINGS
![Page 18: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/18.jpg)
18
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
HIGHBAY CRANE
TARGET GALLERY CRANE
AUXILLARY CRANE (WEDGE REGION 30T)
19m
12m
![Page 19: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/19.jpg)
19
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
INSTALL ALL ACTIVE TARGET SYSTEMS
TARGET SERVICE TRAYS
![Page 20: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/20.jpg)
20
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
STEEL SHIELDING
![Page 21: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/21.jpg)
21
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
COVER SHIELDING
![Page 22: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/22.jpg)
22
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
BEAM DUMP
ISOL TARGET BEAM DIAGNOSTICS
ELASTOMER VACUUM SEALS
ISSUES MODULE SIZE
HEATING
SEALS
![Page 23: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/23.jpg)
23
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
ION OPTICS
DIPOLE / SWITCHYARD
![Page 24: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/24.jpg)
24
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
ISOL TARGET UTILITIES
HEAVY WATER DELAY TANK
LIGHT WATER DELAY TANK
VACUUM SYSTEM
POWER / INSTRUMENTATION
PRESSURIZED GASES
NOTE: HEAVY WATER MAY NOT BE REQUIRED
![Page 25: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/25.jpg)
25
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
SECONDARY VACUUM (BLUE)PRIMARY VACUUM (RED)
![Page 26: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/26.jpg)
26
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
LIGHT WATER JUMPERS
HEAVY WATER JUMPERS
POWER / INSTR JUMPERS
GAS FLEXIBLE HOSES
THERMOCOUPLE CONNECTORS
LIFTING FEATURES
SPRING LOADED CAPTURED BOLTS
![Page 27: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/27.jpg)
27
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
![Page 28: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/28.jpg)
28
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Requirements for RIA Target Building Remote Maintenance Large Hot Cell Remote Handling Equipment
Large Hot Cell Configuration and Function
Component Design for Remote Handling
Remote Tooling
![Page 29: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/29.jpg)
29
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Remote Handling Manipulators
There are three basic types of manipulators: Wall Mounted Master-Slave Manipulator Power-arm mounted on bridge Servomanipulator mounted on bridge
![Page 30: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/30.jpg)
30
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Master-Slave Manipulator (MSM)
Advantages Highly dexterous Force reflecting Inexpensive Reliable (HD models) Work well with a shielding window
Disadvantages: Limited reach Small effective working volume Require a shielding window
workstation Can be overloaded by operator
![Page 31: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/31.jpg)
31
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Bridge Mounted Servomanipulator Advantages:
Highly dexterous handling Force reflecting 5 to 8 X hands-on task times Reduces need and cost of special
remote handling features on components
Moderately powerful Can be equipped with an auxiliary
hoist to assist with material handling
Disadvantages: Expensive Complex and potentially unreliable Mechanically compliant arm limits
positioning accuracy in robotic mode
![Page 32: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/32.jpg)
32
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Hot Cell Video Cameras - Rad TolerantRadiation hard IST/REES R981 Cameras (industry standard ) Advantages
Wall and bridge mountable Can include lights and cameras Rad resistance to >105 rads Reliable
Disadvantages High cost Hands-on maintenance
required Black and White only Relatively poor visual quality Limits hot cell background
![Page 33: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/33.jpg)
33
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Hot Cell Functions
Hot cells have two primary functions1. Radiation Control; passive elements such as
concrete, shielding windows and vault doors.2. Contamination Control; active systems
high efficiency ventilation low level liquid waste water treatment Solid waste treatment, handling and shipping
Each of the three active systems is expensive and large
![Page 34: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/34.jpg)
34
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Hot Cell Material Handling
Gravity is our only friend; therefore….. Virtually all material handling is accomplished by
bridge cranes; as a result: Cells tend to be high to provide head room, hook height and
clearance over servomanipulator bridges. Cells tend to be long and narrow to reduce the bridge width
and allow for easier monitoring of bridge motions. Working areas of cell determined by bridge coverage; thus
crowning of the cell is advantageous. Cell modules should be designed for the minimum possible
load since larger cranes have less coverage.
![Page 35: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/35.jpg)
35
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Crane and Servomanipulator Combinations
Overhead bridge crane is mounted above the servo bridge
Servomanipulator and transporter with Aux hoist must be able to pass bridge crane to operate on both sides of the hook
Retrieving tools and lift fixtures is difficult and time consuming
RIA will probably require multiple cranes and servo systems to provide backup and reduce turn-around times.
![Page 36: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/36.jpg)
36
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Personnel Access vs. Fully Remote
A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell in Cell Design, Component Design, Layout, Tooling, and Operation.
A Cell Designed To Operate Partially Hands-on Cannot Be Easily Converted To Full RH.
Cooling water vaults can be entered after 1-3 days of radiation cool-down if filters and IX columns have local shielding.
![Page 37: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/37.jpg)
37
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Remote Maintenance Design
Process components modularized based on expected maintenance frequency
Remote handling interfaces incorporated to facilitate remote disassembly and assembly of modules with standardized remote tooling and lift fixtures
Maintenance accomplished by replacement of failed component
Motor module
Pump module
Sump tank
SNS Hg Pump
![Page 38: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/38.jpg)
38
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Identification of Tasks
Summary Top Level Maintenance Design Parameters
Expe
cted
Ope
r. Li
fe
Res
tora
tion
Tim
e G
oals
Spar
e
Rep
air
1. 0. Target Process Components1. Target Module >4 Mo < 5 D Yes No2. Primary Mercury Pump ~20 Yr <30 D No No3. Primary Mercury Pump Motor ~5 Yr < 5 D Yes No3. Process Control Sensors 1 Yr <2 D Yes No4. Vacuum Pump Module ~5 Yr <5 D No No6. Mercury Process Gas Valves ~5 Yr <5 D Yes No7. Mercury Transfer Valve ~20 Yr <5 D No No
Mercury Transfer Valve Operator ~5 Yr <2 D Yes No8. Hg/Water Heat Exch. >15 Yr <60 D No No9. Pipe Spools (Frequent Coupling) >10 Yr <60 D No No
10. Collection Basin No NoLOF
Remote handling tasks must be identified early; the list is the basis of design for the RH system and the components
![Page 39: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/39.jpg)
39
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Remote lift fixture examples
![Page 40: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/40.jpg)
40
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
L2
D 1
water coolingand/or radiative cooling
watercooling
heating/ heat shield
line to ion source
Actinide target
2000 deg C
Mercury or D2O-cooled W
Two-step fission targets for 100 kW beam power
Choice of converter type has impact on design of target area • Investigation of neutron/fission yields, beam and decay heating, radiation damage for
400 kW 2-step target• Conceptual design studies of cooling schemes
Are there alternatives to Li +W ? (MSU, ORNL, LLNL)1) Mercury as target and coolant2) Water-cooled W
Original proposal (J. Nolen, ANL): Li-cooled W converter
?
Principle of 2-step fission targets: • Neutron converter for neutron production and
dissipation of beam power• Surrounding blanket of fissionable material
for rare isotope production
![Page 41: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/41.jpg)
41
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
![Page 42: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/42.jpg)
42
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Axial flow DesignWater velocity of 18.2 m/s
Grid 1 Grid 2
W Volume 80% 80%Velocity 18.2 m/s 18.2 m/s
Inlet Temperature 40ºC 40ºC
Outlet Temperature 62ºC 62ºC
Pressure Drop 97 psi 100 psi
Max W Temperature 224ºC 214ºC
Max D2O Temperature
143ºC75/210ºC
134ºC76/191ºC
![Page 43: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/43.jpg)
43
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
two wheels and one stationary beam dump
![Page 44: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/44.jpg)
44
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Example of a RIA Pre-Separator
Beam
Target
Dipole Quad-Triplet
IsotopeSlits
Wedge
BeamDump Power Densities
Radiation Fields
Optics design
![Page 45: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/45.jpg)
45
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
AIR INLET/OUTLET JUMPERS
TARGET MODULE
VACUUM ENCLOSURE
![Page 46: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/46.jpg)
46
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
HEAT EXCHANGER
AIRFLOW PIPES
SHIELDING
6” REMOTE PIPE COUPLINGS
UTILITY CONNECTIONS
VACUUM SEAL
![Page 47: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/47.jpg)
47
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
floor between dump motor and vacuum space
![Page 48: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/48.jpg)
48
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
Beam dump section; magnet vacuum space extended to top of above floor.
![Page 49: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell](https://reader033.vdocument.in/reader033/viewer/2022052712/5b0153a37f8b9a54578e0697/html5/thumbnails/49.jpg)
49
OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY
RIA Project Status
CD0 granted Unfunded Mandate—Construction start
Sept 2008