Page 1: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

Circuit Reliability Review

Santa Fe Springs

2020

Page 2: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

Reliability Overview

8

Page 9: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CityList1Communities in the WHITTIER District

HACIENDA HEIGHTS

NORWALK

SANTA FE SPRINGS

SOUTH WHITTIER

WEST WHITTIER-LOS NIETOS

WHITTIER

DOWNEY

11

Page 12: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitList1Overview of Santa Fe SpringsThere are 43 circuits that serve Santa Fe Springs 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

ALBURTIS(12KV) 2,218 REDSKIN(12KV) 2,356 - -

AXEL(12KV) 732 REFOIL(12KV) 1,363 - -

BUTLER(12KV) 153 SETTLER(12KV) 2,354 - -

CARAVEL(12KV) 498 SHADE(12KV) 1,690 - -

CODY(12KV) 614 SPLENDORA(12KV) 2,502 - -

DECOSTA(12KV) 2,539 STAGE(12KV) 118 - -

DECOY(12KV) 1,012 STARBUCK(12KV) 327 - -

DOERNER(12KV) 151 STUDEBAKER(12KV) 2,314 - -

DOLAN(12KV) 976 TATTOO(12KV) 1,060 - -

FAGAN(12KV) 494 TERRADELL(12KV) 2,506 - -

FRIENDS(12KV) 917 TRAPPER(12KV) 1,559 - -

HEDGE(12KV) 254 UNION(12KV) 236 - -

HOUGHTON(4.16KV) 1 VICKI(12KV) 1,733 - -

JANAE(12KV) 1,558 - - -

JAYBLUE(12KV) 655 - - -

JESSUP(4.16KV) 663 - - -

LAIRD(12KV) 1,391 - - -

LEFFINGWELL(12KV) 2,600 - - -

LEMONT(12KV) 102 - - -

LOFTUS(12KV) 1,549 - - -

MILL(12KV) 137 - - -

MILLERGROVE(12KV) 2,146 - - -

MIRA(12KV) 94 - - -

MOODY(12KV) 391 - - -

MYSTIC(12KV) 286 - - -

NELLES(12KV) 519 - - -

NORTON(12KV) 356 - - -

OIL(12KV) 683 - - -

ORCHARDALE(12KV) 1,064 - - -

PAINTER(12KV) 3,250 - - -

Grand Total 48,121

13

Page 14: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Santa Fe Springs

Reliability History of Circuits Serving Santa Fe Springs (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

117.4

194.7

84.5 81.5

134.5 139.7 136.8

178.0

0.0

50.0

100.0

150.0

200.0

250.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

0.5

1.0

0.5

0.8

1.11.2

0.9

1.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

SAIFI

(average

frequency of

sustained

interruptions)

1.51.6

1.11.0

1.6

1.8

1.4 1.4

0.0

0.5

1.0

1.5

2.0

MAIFI

(average

frequency of

momentary

interruptions)

14

Page 15: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Santa Fe Springs

2019

3rd Party

35.7%

Equipment Failure

34.4%

Operation

14.5%

Other

10.2%

Vegetation /Animal

0.3%

Weather /Fire

/Earthquake

4.8% PSPS

0.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

15

Page 16: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Santa Fe Springs

2019

3rd Party

21.9%

Equipment Failure

37.8%

Operation

16.0%

Other

18.4%

Vegetation /Animal

1.1%

Weather /Fire

/Earthquake

4.8%

PSPS

0.0%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

17

Page 18: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

18

Page 19: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

Back-up Slides

Reliability Histories of Circuits Serving Santa Fe Springs

Updated through Dec 2019

19

Page 20: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

117.4 0.5 1.5 194.7 1.0 1.6 84.5 0.5 1.1 20.4 0.2 0.2 20.4 0.2 0.3 7.9 0.1 0.0 32.8 0.3 0.4 81.5 0.8 1.0

3rd Party 37% 28% 48% 13% 20% 30% 25% 30% 27% 56% 47% 91% 8% 8% 21% 3% 4% - 48% 21% 26% 36% 22% 40%

Equipment Failure 45% 45% 9% 26% 38% 20% 25% 24% 31% 14% 18% 2% 70% 54% 38% 57% 65% - 20% 31% 5% 34% 38% 14%

Operation 7% 16% 3% 5% 9% 1% 41% 36% 12% 23% 29% 6% 6% 6% - 38% 20% - 9% 14% 4% 15% 16% 3%

Other 4% 3% 30% 1% 4% 20% 3% 6% 12% 6% 5% - 14% 31% 24% 0% 1% 65% 12% 22% 46% 10% 18% 29%

Vegetation/Animal 0% 0% 4% 1% 5% 20% 2% 1% 17% - - - 1% 0% 16% 2% 11% 35% - - 14% 0% 1% 12%

Weather/Fire/Earthquake 7% 7% 6% 54% 23% 9% 4% 5% 2% 2% 1% - - - - - - - 11% 12% 4% 5% 5% 2%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

43 Circuits Serving Santa Fe Springs -- Total

Customers: 48,121

Average Reliability of 43 Circuits Serving Santa Fe Springs

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

20

Page 21: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ALBURTIS(12KV) - Customers: 2,218 220.2 1.0 0.8 117.1 0.2 1.8 72.3 0.3 1.9 54.0 1.0 0.3 - - - - - - - - - 54.0 1.0 0.3

3rd Party - - - 96% 95% 46% - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 4% 5% - 34% 67% - - - - - - - - - - - - - - - -

Operation 0% 1% - - - - - - - 93% 97% 100% - - - - - - - - - 93% 97% 100%

Other - - - - - 54% - - - 7% 3% - - - - - - - - - - 7% 3% -

Vegetation/Animal - - - - - - 66% 33% 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 100% 99% 100% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

AXEL(12KV) - Customers: 732 103.7 1.0 1.0 15.2 0.1 2.0 142.3 2.0 2.0 - - - 3.1 0.0 1.0 33.5 0.1 - - - - 36.6 0.1 1.0

3rd Party 99% 100% 100% - - - 64% 51% - - - - 100% 100% 100% - - - - - - 8% 1% 100%

Equipment Failure - - - 78% 50% - 0% 0% - - - - - - - 74% 44% - - - - 68% 43% -

Operation 1% 0% - 22% 50% - 0% 1% 50% - - - - - - 26% 56% - - - - 24% 55% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 36% 48% 50% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BUTLER(12KV) - Customers: 153 70.1 1.0 1.0 208.1 1.0 1.0 78.7 1.3 - - - 1.0 33.2 2.0 1.0 - - - 53.3 1.0 - 86.5 3.0 2.0

3rd Party 96% 99% - - - - - - - - - 100% - - - - - - 100% 100% - 62% 33% 51%

Equipment Failure 4% 1% - 100% 100% - 100% 100% - - - - - - 100% - - - - - - - - 49%

Operation - - - - - - - - - - - - 100% 100% - - - - - - - 38% 67% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CARAVEL(12KV) - Customers: 498 16.9 0.2 0.9 182.8 3.0 0.9 - - - 87.3 1.0 - - - - - - - - - - 87.3 1.0 -

3rd Party - - - 34% 34% - - - - - - - - - - - - - - - - - - -

Equipment Failure 31% 55% - 66% 66% 100% - - - 100% 100% - - - - - - - - - - 100% 100% -

Operation 45% 43% 100% 0% 0% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 25% 3% - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 1 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

21

Page 22: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

CODY(12KV) - Customers: 614 11.1 0.1 2.0 393.0 2.8 2.6 - - - - - - 1.4 0.0 - 1.2 0.0 - - - - 2.6 0.0 -

3rd Party 2% 2% 100% - - - - - - - - - 100% 100% - - - - - - - 53% 33% -

Equipment Failure 59% 7% - 90% 76% - - - - - - - - - - 100% 100% - - - - 47% 67% -

Operation 39% 92% - 1% 1% 16% - - - - - - - - - - - - - - - - - -

Other - - - - - 43% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 9% 23% 41% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DECOSTA(12KV) - Customers: 2,539 665.3 0.5 - 840.2 2.9 3.0 9.7 0.1 1.0 - - - - - 0.9 11.1 0.0 - 77.4 1.2 2.8 88.5 1.3 3.7

3rd Party 99% 89% - 9% 37% 66% 69% 88% - - - - - - - - - - - - - - - -

Equipment Failure 0% 0% - - - - 30% 10% - - - - - - 100% - - - - - - - - 25%

Operation 0% 5% - 2% 8% - 1% 2% - - - - - - - 100% 100% - - - - 13% 3% -

Other 0% 6% - - - - - - - - - - - - - - - - 100% 100% 100% 87% 97% 75%

Vegetation/Animal - - - - - 34% - - 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 89% 55% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DECOY(12KV) - Customers: 1,012 330.2 1.1 - 136.7 2.5 0.7 50.5 1.8 2.0 33.0 0.4 - - - - - - - 28.4 0.3 - 61.5 0.7 -

3rd Party - - - - - - - - 50% 100% 100% - - - - - - - - - - 54% 54% -

Equipment Failure 91% 77% - 3% 1% - 61% 23% - - - - - - - - - - 1% 1% - 1% 0% -

Operation - - - 50% 15% - - - - - - - - - - - - - 99% 99% - 46% 46% -

Other 9% 23% - 5% 35% 100% 34% 55% 50% - - - - - - - - - - - - - - -

Vegetation/Animal - - - 42% 49% - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 6% 22% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DOERNER(12KV) - Customers: 151 65.2 1.2 1.0 14.6 0.1 - - - - - - - - - - - - - 278.6 0.5 0.5 278.6 0.5 0.5

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - 100% 100% 100% 100% 100% 100%

Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 2 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

22

Page 23: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

DOLAN(12KV) - Customers: 976 - - - - - - - - - 26.2 1.0 0.1 82.4 0.9 3.1 - - - 1.6 0.0 1.0 110.2 1.9 4.2

3rd Party - - - - - - - - - - - - - - - - - - 100% 100% 100% 1% 0% 24%

Equipment Failure - - - - - - - - - 100% 100% 100% 100% 100% 100% - - - - - - 99% 100% 76%

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FAGAN(12KV) - Customers: 494 55.9 0.1 - 12.5 0.0 0.9 287.7 1.1 1.0 - - - - - - 11.0 0.0 - - - - 11.0 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 97% 81% - 100% 100% 100% 100% 100% - - - - - - - - - - - - - - - -

Operation 3% 19% - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - 100% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FRIENDS(12KV) - Customers: 917 12.1 0.0 2.0 308.6 3.1 2.0 11.9 0.1 1.0 - - - - - 0.8 13.7 0.1 - - - 1.0 13.7 0.1 1.8

3rd Party 100% 100% 50% 37% 32% 50% - - 100% - - - - - - - - - - - 100% - - 55%

Equipment Failure - - - 52% 65% - 66% 50% - - - - - - - - - - - - - - - -

Operation - - - 11% 3% - 34% 50% - - - - - - - 100% 100% - - - - 100% 100% -

Other - - 50% - - - - - - - - - - - 100% - - - - - - - - 45%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 50% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HEDGE(12KV) - Customers: 254 71.3 1.3 2.5 281.1 2.1 - 7.3 0.0 2.0 - - - - - - - - - - - - - - -

3rd Party 82% 65% 79% 98% 100% - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation 18% 35% 21% 2% 0% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 100% 100% 100% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 3 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

23

Page 24: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory4

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

HOUGHTON(4.16KV) - Customers: 1 - - 1.0 365.4 1.8 2.2 7.2 0.0 - - - 2.4 - - - - - - - - - - - 2.4

3rd Party - - 100% - - - - - - - - 100% - - - - - - - - - - - 100%

Equipment Failure - - - 41% 14% - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - 22% 14% - - - - - - - - - - - - - - - - - - -

Other - - - 26% 43% 33% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 11% 29% 67% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JANAE(12KV) - Customers: 1,558 37.7 0.2 1.0 89.7 1.8 1.3 24.6 0.2 1.0 - - - 272.9 1.1 - 1.8 0.0 - - - 1.0 274.8 1.1 1.0

3rd Party - - - 6% 3% - - - - - - - - - - - - - - - 100% - - 100%

Equipment Failure - - - 79% 38% 100% 42% 29% 100% - - - 99% 99% - - - - - - - 99% 98% -

Operation 70% 85% - 16% 60% - 58% 71% - - - - 1% 1% - 100% 100% - - - - 1% 2% -

Other 30% 15% 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JAYBLUE(12KV) - Customers: 655 132.4 1.2 1.9 29.6 1.1 1.2 28.1 0.3 - 65.6 0.5 - - - 1.0 11.0 0.0 - 17.6 0.1 - 94.2 0.6 1.0

3rd Party - - 100% 35% 3% - 31% 19% - - - - - - 100% - - - - - - - - 100%

Equipment Failure 86% 90% - 59% 92% 100% 29% 22% - - - - - - - 100% 100% - - - - 12% 5% -

Operation - - - 6% 5% - 39% 43% - - - - - - - - - - 100% 100% - 19% 10% -

Other 14% 10% - - - - - - - 100% 100% - - - - - - - - - - 70% 85% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 1% 16% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JESSUP(4.16KV) - Customers: 663 220.4 1.1 1.9 32.4 0.1 2.0 - - 3.0 - - - 27.9 0.9 - - - 1.0 - - - 27.9 0.9 1.0

3rd Party - - 53% - - - - - 33% - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 100% 100% - - - - - - - 100% 100% - - - - - - - 100% 100% -

Operation - - 47% - - - - - - - - - - - - - - - - - - - - -

Other - - - - - 50% - - 67% - - - - - - - - 100% - - - - - 100%

Vegetation/Animal - - - - - 50% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 4 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

24

Page 25: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory5

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

LAIRD(12KV) - Customers: 1,391 88.5 1.0 2.0 70.4 2.2 2.0 13.3 0.1 1.1 - - - 0.8 0.0 - - - - - - - 0.8 0.0 -

3rd Party - - 47% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 5% 63% 89% 49% - - - - - - 100% 100% - - - - - - - 100% 100% -

Operation 0% 0% - 30% 8% - 100% 100% 100% - - - - - - - - - - - - - - -

Other - - - 7% 3% 51% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 48% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LEFFINGWELL(12KV) - Customers: 2,600 97.5 1.1 2.9 672.8 0.7 0.5 287.8 1.2 0.5 5.3 0.0 - - - - - - - 1.0 0.0 - 6.3 0.0 -

3rd Party 40% 96% 66% 1% 12% - 0% 1% - - - - - - - - - - - - - - - -

Equipment Failure 4% 0% - 1% 1% - 2% 1% - 100% 100% - - - - - - - - - - 84% 38% -

Operation - - - 1% 3% - 93% 96% 100% - - - - - - - - - 100% 100% - 16% 63% -

Other 55% 3% - - - - 5% 3% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 0% 0% 34% 97% 84% 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LEMONT(12KV) - Customers: 102 - - 1.0 - - 3.0 - - 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - 67% - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - 100% - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - 100% - - 33% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LOFTUS(12KV) - Customers: 1,549 15.7 0.1 1.0 - - - 510.3 2.0 0.9 4.4 0.0 - - - - 7.6 0.1 - - - 1.0 12.0 0.1 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 40% 40% 4% - - - - - - - - - - - - - - -

Operation 100% 100% - - - - 42% 54% 96% 37% 58% - - - - 100% 100% - - - - 77% 90% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake - - - - - - 18% 5% - 63% 42% - - - - - - - - - - 23% 10% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 5 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

25

Page 26: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory6

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MILL(12KV) - Customers: 137 244.2 2.0 1.0 - - - 176.8 2.0 0.6 9.7 0.0 - - - - - - - - - - 9.7 0.0 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 89% 81% - - - - 100% 100% 100% 12% 50% - - - - - - - - - - 12% 50% -

Operation - - - - - - 0% 0% - 88% 50% - - - - - - - - - - 88% 50% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 11% 19% - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MILLERGROVE(12KV) - Customers: 2,146 28.3 0.1 2.9 309.3 1.2 1.0 77.9 0.2 1.0 32.2 0.3 0.8 1.1 0.0 - 2.0 0.0 - 3.0 0.0 - 38.3 0.4 0.8

3rd Party 1% 5% 34% - - - 6% 13% 100% 93% 98% 100% - - - - - - - - - 78% 86% 100%

Equipment Failure 88% 46% 66% 8% 9% 100% - - - - - - - - - - - - - - - - - -

Operation 11% 48% - 1% 4% - 88% 67% - - - - 100% 100% - 100% 100% - 100% 100% - 16% 12% -

Other - - - 2% 1% - 6% 20% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 89% 86% - - - - 7% 2% - - - - - - - - - - 6% 2% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MIRA(12KV) - Customers: 94 356.2 1.2 3.5 49.1 0.1 2.9 - - 2.0 46.3 0.0 1.9 - - - - - - - - - 46.3 0.0 1.9

3rd Party - - - 100% 100% 30% - - 50% - - 51% - - - - - - - - - - - 51%

Equipment Failure 88% 96% 44% - - - - - 50% 100% 100% 49% - - - - - - - - - 100% 100% 49%

Operation 12% 4% - - - - - - - - - - - - - - - - - - - - - -

Other - - 56% - - 35% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 35% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MOODY(12KV) - Customers: 391 229.2 0.3 1.0 239.4 0.7 1.0 1.5 0.0 3.0 4.0 0.0 - - - - 17.8 1.0 1.0 0.9 0.0 2.0 22.7 1.0 3.0

3rd Party - - - - - 100% - - 33% - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 97% 65% - 73% 67% 33% - - - - - - - - - - - - - - -

Operation - - - 3% 35% - 27% 33% - 100% 100% - - - - - - - 100% 100% 100% 22% 1% 66%

Other - - 100% - - - - - 33% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - 100% 100% 100% - - - 78% 99% 34%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 6 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

26

Page 27: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory7

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MYSTIC(12KV) - Customers: 286 3.4 0.0 1.0 79.6 0.6 0.8 118.4 0.6 1.4 23.9 0.4 0.6 185.8 1.0 - - - - 2.8 0.0 - 212.5 1.4 0.6

3rd Party - - 100% - - - - - - 100% 100% 100% 100% 100% - - - - - - - 99% 100% 100%

Equipment Failure - - - 100% 100% 100% 100% 100% 100% - - - - - - - - - 100% 100% - 1% 0% -

Operation 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

NELLES(12KV) - Customers: 519 0.1 0.0 2.0 4.1 0.0 - - - - - - - 46.8 1.0 - - - - - - - 46.8 1.0 -

3rd Party - - 50% - - - - - - - - - 100% 100% - - - - - - - 100% 100% -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other 100% 100% 50% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

NORTON(12KV) - Customers: 356 34.9 0.0 - 3.8 0.0 3.0 - - - 1.1 0.0 - - - - - - - 20.1 1.1 - 21.3 1.1 -

3rd Party - - - - - 34% - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - 43% 50% - - - - - - - - - - 2% 0% -

Operation - - - - - - - - - - - - - - - - - - 100% 100% - 95% 99% -

Other - - - - - 33% - - - 57% 50% - - - - - - - - - - 3% 0% -

Vegetation/Animal - - - 100% 100% 33% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

OIL(12KV) - Customers: 683 129.8 1.1 - - - - 33.8 1.0 0.9 - - - - - - 7.3 0.0 - 69.6 0.8 0.2 76.9 0.8 0.2

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 87% 98% 100% - - - - - - 94% 50% - - - - 9% 1% -

Operation - - - - - - 13% 2% - - - - - - - 6% 50% - 100% 100% 100% 91% 99% 100%

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 7 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

27

Page 28: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory8

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ORCHARDALE(12KV) - Customers: 1,064 33.6 0.2 2.0 0.0 0.0 1.0 127.1 1.9 0.1 9.3 0.1 1.0 - - - 3.6 0.0 - 55.1 0.1 - 68.1 0.3 1.0

3rd Party 75% 89% - - - 100% - - - - - 100% - - - - - - - - - - - 100%

Equipment Failure 23% 5% - - - - 12% 48% 100% - - - - - - - - - - - - - - -

Operation 3% 7% - 100% 100% - 88% 52% - 100% 100% - - - - 100% 100% - - - - 19% 45% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - 100% 100% - 81% 55% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PAINTER(12KV) - Customers: 3,250 3.2 0.0 1.1 115.0 0.7 3.0 113.8 1.0 2.0 3.0 0.0 - 46.9 1.0 - 3.7 0.0 - 7.4 0.1 - 61.0 1.2 -

3rd Party - - 100% 2% 15% 100% 82% 96% 50% - - - - - - 91% 93% - - - - 5% 4% -

Equipment Failure 79% 34% - 80% 66% - 7% 1% 50% 70% 50% - 2% 0% - 9% 7% - - - - 6% 2% -

Operation 21% 66% - 12% 10% - 11% 3% - - - - - - - - - - 100% 100% - 12% 5% -

Other - - - 5% 9% - - - - 30% 50% - 94% 99% - - - - - - - 74% 89% -

Vegetation/Animal - - - - - - - - - - - - 4% 1% - - - - - - - 3% 1% -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

REDSKIN(12KV) - Customers: 2,356 813.7 1.4 1.0 48.5 0.7 1.5 48.5 0.2 0.8 12.9 0.0 - 5.0 0.0 1.0 - - - 48.4 1.7 1.4 66.3 1.7 2.4

3rd Party - - 100% - - - - - 100% - - - - - - - - - - - - - - -

Equipment Failure 35% 46% - 100% 100% - 8% 7% - 5% 11% - - - - - - - 100% 100% 27% 74% 95% 15%

Operation 65% 54% - - - 50% 50% 41% - 95% 89% - 100% 100% - - - - - - - 26% 5% -

Other - - - - - 50% 42% 53% - - - - - - - - - - - - 73% - - 42%

Vegetation/Animal - - - - - - - - - - - - - - 100% - - - - - - - - 42%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

REFOIL(12KV) - Customers: 1,363 27.5 0.1 1.0 11.1 0.1 1.0 267.4 1.1 2.0 - - 1.0 - - - - - - 0.2 0.0 1.0 0.2 0.0 2.0

3rd Party 68% 28% - - - - 100% 99% 50% - - 100% - - - - - - - - - - - 50%

Equipment Failure - - - 18% 5% - 0% 1% 50% - - - - - - - - - - - - - - -

Operation - - - 12% 8% - - - - - - - - - - - - - 100% 100% - 100% 100% -

Other 32% 72% 100% 70% 88% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - 100% - - 50%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 8 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

28

Page 29: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory9

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SETTLER(12KV) - Customers: 2,354 10.2 0.1 3.0 42.3 0.4 5.1 25.5 0.2 2.6 - - - - - - 3.5 0.0 - 14.1 0.1 - 17.6 0.1 -

3rd Party - - 33% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 68% 79% 43% 96% 96% 59% - - - - - - 31% 43% - 100% 100% - 86% 81% -

Operation 79% 69% - 29% 21% - 3% 4% - - - - - - - 69% 57% - - - - 14% 19% -

Other - - 67% - - 19% - - - - - - - - - - - - - - - - - -

Vegetation/Animal 21% 31% - 2% 0% 38% 2% 0% 41% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SHADE(12KV) - Customers: 1,690 - - 2.0 249.9 1.8 3.9 15.4 0.3 1.0 7.2 0.0 1.1 9.6 0.0 2.0 1.6 0.0 - 0.3 0.0 - 18.7 0.1 3.1

3rd Party - - 50% 93% 59% 49% - - 100% 41% 10% 100% - - 50% - - - - - - 16% 5% 67%

Equipment Failure - - - 0% 1% - - - - - - - - - - - - - - - - - - -

Operation - - 50% - - - 100% 100% - 33% 60% - 100% 100% - 100% 100% - 100% 100% - 74% 79% -

Other - - - - - 25% - - - 26% 29% - - - 50% - - - - - - 10% 16% 33%

Vegetation/Animal - - - 7% 41% 25% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SPLENDORA(12KV) - Customers: 2,502 7.7 0.0 2.3 13.4 0.0 2.0 2.1 0.0 2.0 150.6 1.1 1.5 6.4 0.0 - 0.4 0.0 - - - - 157.4 1.1 1.5

3rd Party 83% 74% 43% - - - - - - 99% 100% 100% 10% 18% - - - - - - - 95% 98% 100%

Equipment Failure 16% 23% 13% 97% 72% - 60% 72% 50% 1% 0% - - - - - - - - - - 1% 0% -

Operation 1% 3% - 3% 28% - 40% 28% - - - - 90% 82% - 100% 100% - - - - 4% 2% -

Other - - 44% - - 50% - - 50% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 50% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

STAGE(12KV) - Customers: 118 121.4 0.2 1.0 79.8 1.8 1.4 70.7 1.0 1.0 27.3 0.0 2.0 - - - - - - - - - 27.3 0.0 2.0

3rd Party - - - - - - 100% 100% - - - 51% - - - - - - - - - - - 51%

Equipment Failure 99% 85% - - - - - - 100% 100% 100% 49% - - - - - - - - - 100% 100% 49%

Operation 1% 15% - 74% 64% - - - - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - 26% 36% 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 9 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

29

Page 30: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory10SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

STARBUCK(12KV) - Customers: 327 - - - 14.7 0.0 - - - - - - - - - - - - - 776.0 0.9 0.8 776.0 0.9 0.8

3rd Party - - - - - - - - - - - - - - - - - - 100% 100% 100% 100% 100% 100%

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

STUDEBAKER(12KV) - Customers: 2,314 377.6 1.3 2.0 3.1 0.0 - 23.1 0.1 1.0 6.5 0.0 - - - - 76.9 1.0 - - - - 83.4 1.0 -

3rd Party - - 50% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 99% - 100% 100% - 6% 2% 100% 74% 33% - - - - 100% 100% - - - - 98% 99% -

Operation 0% 1% - - - - 80% 78% - 26% 67% - - - - - - - - - - 2% 1% -

Other - - 50% - - - 14% 19% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TATTOO(12KV) - Customers: 1,060 216.5 1.3 - - - 1.0 61.7 0.1 - 0.7 0.0 - - - 1.0 5.6 0.0 - - - - 6.2 0.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - 100% 100% - - - - 89% 62% -

Operation - - - - - - 90% 52% - 100% 100% - - - - - - - - - - 11% 38% -

Other - - - - - - 10% 48% - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TERRADELL(12KV) - Customers: 2,506 6.3 1.0 1.0 379.4 2.1 0.4 153.9 0.8 0.4 3.5 0.0 - 66.6 1.0 - 0.6 0.0 - 242.6 1.8 0.4 313.2 2.8 0.4

3rd Party - - - 24% 47% - 25% 74% 100% 9% 48% - - - - - - - 79% 56% - 61% 36% -

Equipment Failure 4% 0% - - - - 75% 25% - - - - 97% 99% - - - - - - - 21% 35% -

Operation 96% 100% - 8% 7% - 0% 0% - - - - 3% 1% - 100% 100% - 2% 8% - 2% 6% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 68% 47% 100% - - - 91% 52% - - - - - - - 19% 36% 100% 15% 23% 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 10 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

30

Page 31: PowerPoint Presentation · Our Grid To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles of Transmission

CircuitHistory11SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

TRAPPER(12KV) - Customers: 1,559 64.7 1.0 1.0 191.3 0.3 0.7 72.8 1.0 - 40.4 0.2 - 0.7 0.0 - 0.9 0.0 - - - 1.0 42.0 0.2 1.0

3rd Party 85% 99% 100% - - - 5% 2% - 100% 100% - - - - - - - - - 100% 96% 93% 100%

Equipment Failure 15% 1% - 99% 95% 100% 11% 2% - - - - - - - - - - - - - - - -

Operation - - - 1% 5% - 84% 96% - - - - 100% 100% - 100% 100% - - - - 4% 7% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

UNION(12KV) - Customers: 236 60.0 1.0 1.0 - - - 133.9 1.0 - - - - - - - 227.6 1.0 - 0.2 0.0 - 227.8 1.0 -

3rd Party 100% 100% 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - 100% 100% - 0% 0% -

Operation - - - - - - 100% 100% - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

VICKI(12KV) - Customers: 1,733 18.9 0.1 - 168.7 0.3 1.0 116.9 0.2 - 50.6 0.1 - 3.8 0.1 - 1.0 0.0 - 77.5 0.2 - 132.8 0.4 -

3rd Party - - - 1% 2% 100% 86% 58% - - - - - - - - - - - - - - - -

Equipment Failure 27% 40% - 96% 71% - - - - 25% 21% - - - - - - - 100% 100% - 68% 52% -

Operation 73% 60% - - - - 14% 42% - 75% 79% - 100% 100% - - - - - - - 31% 43% -

Other - - - 3% 27% - - - - - - - - - - 100% 100% - - - - 1% 5% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Santa Fe Springs - 11 of 11

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

31