ppap process training - reliance.wabtec.com
TRANSCRIPT
The information contained in this document may contain confidential, proprietary and/or privileged material of either Wabtec Corporation or
one of its subsidiaries. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by
persons or entities other than the intended recipient is prohibited unless authorized in writing. If you have received this document in error,
please contact the sender and delete the material from any system and destroy any copies.
PPAP Process Training(Production Part Approval Process)
2Confidential & Proprietary
Training Objectives
• Define PPAP
• Define the General Process
• Define the PPAP Process (by Category Type)
• Identify PPAP Verification Requirements
• Identify PPAP Validation Requirements
• Define Process Requirements
3Confidential & Proprietary
What is PPAP?
The Production Part Approval Process (PPAP) is the process Wabtec Corporation uses for qualifying suppliers to produce new or existing electrical components, mechanical components, and systems for the following reasons:
• Deflation• Drawing/Design Change• Dual Source Initiative • Engineering Productivity • Farm-Out• First Sourcing Qualification for NPI • New Supplier• Process Change at Current Supplier• Productivity • Quality or Reliability Concerns• Supplier Facility Relocation • Other general reasons specified by Wabtec Corporation
4Confidential & Proprietary
General Process Flow
PPAP Requisition
PPAP Definition
Supplier Acknowledgement
Execution
Requirements Review
Project Approval
PPAP Requisition:• Screening to determine which PPAP requests merit resources allocation
PPAP Definition:• Identifies a clear verification and validation requirements before ordering• Evaluate EHS risks and requirements• Evaluate probability and consequence of failure risks
Supplier Acknowledgement:• Assures supplier agrees to all planned verification and validation requirements before ordering
Execution:• Verifies that the supplier has a good plan for making the part and inspects the part at the
supplier to ensure that the part is made correctly. • Validation actions conducted
Requirements Review: • Verifies that the part works at Wabtec as intended in our product by subjecting it to any
required inspections or tests
Project Approval:• Review project requirements• Provides project approval decision (Approval, Disapproval, Conditional Approval)
5Confidential & Proprietary
PPAP Process StepsPPAP Process Steps
Phase
Supplie
r
Qualit
y
Leader
SQ
ED
esi
gn
Engin
eer
Princi
pal
Engin
eer
Buyer
Supplie
r
Assign Team (All CAT Levels)
Assign Deliverables
(CAT 1, 2, or 3)
Validation Plan Review
(CAT 1 or 3)
Validation Plan (CAT 1 or 3)
Principal Engineer Review
(CAT 1) Moderate & High
Risk ONLY
Link Supplier(CAT 1, 2, or 3)
Approve Deliverables
(CAT 1, 2, or 3)
Review Samples(CAT 1, 2, or 3)
Validation Review
(CAT 1 or 3)
Issue PO(CAT 1 or 2)
SupplierAcknowledgement(CAT 1, 2, or 3)
Execute Plan(CAT 1, 2, or 3)
Ship Samples(CAT 1, 2, or 3)
Approval(CAT 1, 2, or 3)
SQL & PE Excluded from Team
Approval for Law Risk PPAPs
6Confidential & Proprietary
CAT 0 (PPAP Not Required)Process Steps
Process Step Deliverables Owner
Assign Team • Provide the request justification details• Provide part information• Provide Supplier information
Supplier Quality Leader
Close PPAP Decision (Approved)
7Confidential & Proprietary
CAT 1 PPAP (Engineering & Quality Approval)Process StepsProcess Step Deliverables Owner
Assign Team • Assign PPAP Team Members Supplier Quality Leader
Assign Deliverables • Conduct General EHS Review• Conduct Risk Assessment• Define Verification Requirements
Supplier Quality Engineer
Validation Plan • Review Risk Assessment • Review Drawing, 3-D Model, Specifications• Define Validation Requirements
Design Engineer
Principal Engineer Review • Review Verification & Validation Requirements Principal Engineer
Validation Plan Review • Review Validation Plan Requirements Supplier Quality Engineer
Supplier Acknowledgement • Provide Acknowledgement Decision of Planned Requirements Supplier
Link Supplier • Link Supplier in ERP System to Permit Sample PO Placement Supplier Quality Engineer
Issue Sample PO • Issue Sample PO• Launch EHS Review (if applicable)
Buyer
Execute Plan • Execute all Assigned Verification & Validation Requirements Supplier / WABTEC
Approve Deliverables • Review and Provide Approval for Verification Requirements Supplier Quality Engineer
Ship Samples • Provide Shipping Details Supplier
Review Samples • Indicate Receipt of Samples • Indicate Inspection Requirements (if applicable)• Indicate Fit-up Results (if applicable)
Supplier Quality Engineer
Validation Review • Review and Provide Approval for Validation Requirements Design Engineer
Approval • Review PPAP Project Details and Provide PPAP Approval Decision Team(SQL, SQE, DE, PE)
Close • PPAP Decision
8Confidential & Proprietary
CAT 2 PPAP (Quality Only)Process Steps
Process Step Deliverables Owner
Assign Team • Assign PPAP Team Members Supplier Quality Leader
Assign Deliverables • Conduct General EHS Review • Conduct Risk Assessment• Define Verification Requirements
Supplier Quality Engineer
Supplier Acknowledgement • Provide Acknowledgement Decision of Planned Requirements Supplier
Link Supplier • Link Supplier in ERP System to Permit Sample PO Placement Supplier Quality Engineer
Issue Sample PO • Issue Sample PO• Launch EHS Review (if applicable)
Buyer
Execute Plan • Execute all Assigned Verification & Validation Requirements Suppler / WABTEC
Approve Deliverables • Review and Provide Approval for Verification Requirements Supplier Quality Engineer
Ship Samples • Provide Shipping Details Supplier
Review Samples • Indicate Receipt of Samples • Indicate Inspection Requirements (if applicable)• Indicate Fit-up Results (if applicable)
Supplier Quality Engineer
Approval • Review PPAP Project Details and Provide PPAP Approval Decision Team(SQL, SQE)
Close • PPAP Decision
9Confidential & Proprietary
CAT 3 PPAP (Engineering Development)Process Steps
Process Step Deliverables Owner
Assign Team • Assign PPAP Team Members Supplier Quality Leader
Assign Deliverables • Conduct General EHS Review • Conduct Risk Assessment• Define Verification Requirements
Design Engineer
Validation Plan • Review Risk Assessment • Review Drawing, 3-D Model, Specifications • Define Validation Requirements
Design Engineer
Validation Plan Review • Review Validation Plan Requirements Design Engineer
Supplier Acknowledgement • Provide Acknowledgement Decision of Planned Requirements Supplier
Link Supplier • Link Supplier in ERP System to Permit Sample PO Placement Supplier Quality Engineer
Issue Sample PO • Issue Sample PO• Launch EHS Review (if applicable)
Buyer
Execute Plan • Execute all Assigned Verification & Validation Requirements Supplier / WABTEC
Approval Deliverables • Review and Provide Approval for Verification Requirements Design Engineer
Ship Samples • Provide Shipping Details Supplier
Review Samples • Indicate Receipt of Samples• Indicate Inspection Requirements (if applicable)• Indicate Fit-up Results (if applicable)
Design Engineer
Validation Review • Review and Provide Approval for Validation Requirements Design Engineer
Approval • Review PPAP Project Details and Provide PPAP Approval Decision Team(DE, PE)
Close • PPAP Decision
Request Process Steps Explained
11Confidential & Proprietary
PPAP Request Process
Process Step Deliverables Owner
Initiate Request • Provide the request justification details• Provide part information • Provide Supplier information
Buyer, Commodity Leader, Engineer, SQE, Supplier Quality Leader
Sourcing Approval • Review project details and provide PPAP project request approval decision Commodity Leader
Review Board • Review project details and provide PPAP project request approval decision • Define PPAP Category Level based on request details provided
Supplier Quality Leader
12Confidential & Proprietary
Initiate Request
Typically, requests are generated by either a buyer or commodity leader.
The purpose of this process step is to provide the following details related to the requisition:• Request reason & justification details • Part information• Supplier information • Project numbers (if applicable)
13Confidential & Proprietary
Accessing the PPAP Tool
Wabtec Users can access Reliance by using URL: https://reliance.wabtec.com/reliance/reliance
Open the PPAP module by clicking on the PPAP button
Don’t see the PPAP App? Make sure the view is set to “Buyer”
14Confidential & Proprietary
Initiate Supplier PPAP Request Responsibility:
BuyerCommodity Leader
1. Click on the “New Document” tab to view the Drop-Down menu
2. Click on the “Supplier PPAP Request –Initiate” option
15Confidential & Proprietary
Initiate Supplier PPAP Request (Continued)
Responsibility: Buyer
Commodity Leader
Provide reason and justification Details * Denotes a required field. All required fields must be completed before routing the request
NOTE: A PPAP Request will remain open until it is decided that a PPAP is not required or the PPAP is closed
Additional details can be added as a file.
16Confidential & Proprietary
Initiate Supplier PPAP Request (Continued)
Responsibility: Buyer
Commodity Leader
Select the supplier by either entering the 6-digit GSL in the field or by using the look-up icon to search the supplier list
Some fields will automatically be filled in once the supplier GSL has been selected
IMPORTANT! Indicate if supplier is on New Business Hold. Note: Refer to the link to NBH to see list.
17Confidential & Proprietary
Initiate Supplier PPAP Request (Continued)
Responsibility: Buyer
Commodity Leader
Enter Part Number here
* Denotes a required field. All required fields must be completed before routing the request
Assure correct buyer’s name is listed!
Click here to add additional parts to PPAP request
Is the component regulated by the AAR? Several types of components (axles and wheels, for example) MUST come from manufacturers who are certified to the AAR (Association of American Railroads) M-1003 standard. Requestors should click AAR Commodity List to view those components requiring such certification and select Yes or No as appropriate in the AAR Part field. If the component DOES require AAR certification, an electronic copy of the prospective supplier’s current M-1003 certification must be obtained and uploaded to the system.
18Confidential & Proprietary
Initiate Supplier PPAP Request (Continued)
Responsibility: Buyer
Commodity Leader
Click here to add Nucleus Project Number to PPAP record
Enter Commodity Leader Name
Enter program name or use look-up icon to find program name
19Confidential & Proprietary
Send forward for Sourcing Approval to Proceed
Phase Dialog –Pops up when routed to next phase
The Workflow Routing Bar is located at the top of every page of every record. Use this bar to move between phases.
• Red arrow = active phase • Black print = available phase • Gray print = unavailable phase (as you enter data and make
decisions new phases become available)
Failure to route to the next phase means your step is not complete since you did not pass responsibility to the next person. Include comments when routing
backward
Who is assigned to the next phase?
NOT REQUIRED – Notify anyone who should be informed
20Confidential & Proprietary
Sourcing Approval
The purpose of this process step is to:
• Provide the PPAP request details • Add or revise Nucleus project information (if applicable)• Provide a sourcing approval decision (Required)
21Confidential & Proprietary
Assignment Email Sent to Sourcing Leader Wabtec Corporation
Wabtec Corporation
Click link to access PPAP Request Directly from Email
22Confidential & Proprietary
PPAP Request: Sourcing Approval Responsibility:
Commodity Leader
Review Request Details
Select “Yes” to approve request to proceed- OR -- Select “No” to disapprove request to proceed
If Yes, move to Review Board phase If No, route back to initiate or VOID with comments
23Confidential & Proprietary
Send forward to Review Board
Phase Dialog –Pops up when routed to next phase
The Workflow Routing Bar is located at the top of every page of every record. Use this bar to move between phases.
• Red arrow = active phase • Black print = available phase • Gray print = unavailable phase (as you enter data and make
decisions new phases become available)
Failure to route to the next phase means your step is not complete since you did not pass responsibility to the next person.
Include comments if desired
Assigned to all Review Board members
Notify anyone who should be informed
24Confidential & Proprietary
Review Board
The purpose of this process step is to:
• Engineering & Quality review project details • Supplier Quality Leader records PPAP project request approval decision on behalf of the Review Board• Define PPAP Category Level (based on request details provided)
25Confidential & Proprietary
Review Board Responsibility: SQL (with review board)
Responsibility:SQL/Review Board
The Review Board has 4 options when reviewing a PPAP request:
PPAP Required
• Select a category level
• Launch PPAP to validate the change
PPAP Not Required
• Typically used for category parts that do not require validation
• Launch Cat 0 and push to Final Approval
Reject Request
• Void request
• No action required
On-Hold
• Email the requestor
• Leave request open until a decision is made
26Confidential & Proprietary
Review Board Responsibility: SQL (with review board)
Responsibility:SQL/Review Board
4. Make a decision during the Review Board meeting
➢ Save & Close➢ Route to Void
➢ Select Category Level
➢ Save the request
➢ Launch PPAP
➢ Save the request
➢ Launch PPAP
27Confidential & Proprietary
Who is Responsible?
If PPAP is required, the Review Board selects a category level based on who should be involved in the validation
▪ Cat 0: PPAP NOT Required✓ Primary SQE
▪ Cat 1: Engineering and Quality Approval Required✓ Supplier Quality Leader (Moderate & High Risk Only)✓ Primary/Secondary SQE✓ Primary/Secondary DE✓ Principal Engineer (Moderate & High Risk Only)
▪ Cat 2: Quality Approval Only✓ Supplier Quality Leader (Moderate & High Risk Only)✓ Primary/Secondary SQE
▪ Cat 3: Engineering Development✓ Primary/Secondary DE
Critical part, NPI, or engineered system
Validated design, Low risk changes for an established part/supplier
Prototype Projects
PPAP Process Steps Explained
29Confidential & Proprietary
Assign Team
The purpose of this process step is to :
• Assign the team members required to complete the PPAP project actions per the defined PPAP Category requirements.
CAT 0
• SQE Only
CAT 1
• Primary & Secondary SQE
• Primary & Secondary Design Engineer
• Principal Engineer
• Supplier Quality Manager
• Buyer
CAT 2
• Supplier Quality Manager
• Primary & Secondary SQE
• Buyer
CAT 3
• Primary & Secondary Design Engineer
• Principal Engineer
30Confidential & Proprietary
Assign Team Responsibility:SQL/Review Board
NOTE: Each PPAP will require a different blend of team members based on its category
Begin typing a name and then select from the Drop-Down list
Users can also be searched for by clicking on the directory button
Use the routing bar at the top of the page to route the PPAP to the next step
31Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
EHS Questionnaire Required
*Denotes required fields. Answer all the required EHS questions
* The answers to the EHS questionnaire determine if an EHS Compliance Review is needed
32Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
Click this link to launch the required risk assessment
33Confidential & Proprietary
Risk Assessment Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
Ensure the location is set to “GET”Then scroll down to complete the rest of the questionnaire
34Confidential & Proprietary
Risk Assessment Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
Select one of the responses from the drop-down list that best answers the question
Risk levels will be calculated from the selected responses after the Risk Assessment has been saved
Consequences will also require responses
35Confidential & Proprietary
Risk Assessment Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
To save a Risk Assessment, use this button at the top of the screen
Scroll up to route the complete questionnaire to the next step using the routing bar
The “Save” and “Save and Close” buttons should only be used to calculate a risk score; or save the document to work on it later.
36Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
Define the PPAP Milestone Expected Completion Dates
37Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
1. Select applicable verification requirements & provide associated information
2. Select the “Initiate Selected Deliverables” action button to create the required deliverables.
38Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
❑ Samples ❑ Material Performance Testing
❑ Process Flow Diagram (PFD) ❑ Non-Destructive Testing (NDT)
❑ Process Failure Mode Effects Analysis (PFMEA) ❑ Paint & Coatings Qualification
❑ Characteristic Control Plan (CCP) ❑ Quality Certifications
❑ Measurement System Analysis / Gage R&R (MSA) ❑ Qualified Laboratory Documentation
❑ First Article Inspection (FAI) ❑ Records of Compliance
❑ Blower Checklist ❑ Reduction Ratio
❑ Electrical Properties ❑ TPG Audit
❑ Engineer Change Documents ❑ Training Records
❑ Gear Root Steps ❑ Verification of Coupon Size Location
❑ Heat Treat Records ❑ Weld Qualification
❑ Initial Process Capability Study ❑ X-Ray Required
❑ Manufacturing Instructions ❑ Other (Defined in Comments)
❑ Packaging & Cleanliness
Below is a list of Verification Requirements that may be selected
39Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
After a deliverable is initiated, it will appear as a Blue link.
40Confidential & Proprietary
Assign DeliverablesResponsibility:
SQE (CAT 1 & 2) / DE (CAT 3)
NOTE: The deliverable can not be routed to “Send to Supplier” until after the PPAP has been routed to “Supplier Acknowledgement”. At this time it is only necessary to click “Save and Close”
Select Templates Attach applicable files
Define Due Date, Responsibility & Add Requirement Comments
41Confidential & Proprietary
Assign Deliverables Responsibility:SQE (CAT 1 & 2) / DE (CAT 3)
Route to next phase after Deliverables have been Defined
Note: • CAT 1 & 3 – Next phase is Validation Plan• CAT 2 – Next phase is Supplier Acknowledgement
42Confidential & Proprietary
Validation PlanResponsibility:
DE
Complete required fields
2. Select applicable validation requirements
3. Select the “Initiate Selected Engineering Documents” action button to create validation requirements.
43Confidential & Proprietary
Validation PlanResponsibility:
DE
Define Due Date, Responsibility & Add Requirement Comments
44Confidential & Proprietary
Validation PlanResponsibility:
DE
Note: • CAT 1 & 3 – Next phase is PE Review Moderate and High Risk, Otherwise
skip to Validation Plan Review
Route to next phase after Deliverables have been Defined
45Confidential & Proprietary
Principal Engineer ReviewResponsibility:PE (CAT 1&3)
Moderate & High Risk Only
Review: 1. Risk Assessment2. Selected Deliverable
Requirements3. Validation
Requirements
Provide PE Approval Decision
46Confidential & Proprietary
Principal Engineer ReviewResponsibility:PE (CAT 1&3)
Moderate & High Risk Only
If Disapproved, Click Here
If Approved, Click Here
47Confidential & Proprietary
Validation Plan ReviewResponsibility:
SQE (CAT 1)
Review the Validation Requirements
If no, Click Here If yes, Click Here
48Confidential & Proprietary
Validation Plan ReviewResponsibility:
SQE (CAT 1)
If No, Click Here
If Yes, Click Here
49Confidential & Proprietary
Supplier AcknowledgementResponsibility:
Supplier
Review:1. Selected Deliverable
Requirements2. Validation Requirements
(if applicable)
Provide Acknowledgement Decision
50Confidential & Proprietary
Supplier AcknowledgementResponsibility:
Supplier
If No,- Click Assign Deliverables to send to SQE- Click Validation Plan to send to DE
If Yes, Click Here
51Confidential & Proprietary
Link SupplierResponsibility:
SQE (CAT 1&2)
Select Yes once supplier is Linked in Oracle, Click Here
Route to next step
52Confidential & Proprietary
PPAP: Issue Sample POResponsibility:
Buyer
Review all PPAP Details
Button will display if EHS Review is Required. –Left Click action button to launch
Enter Sample PO Number ! PCB must approve all sample QTY changes
Once the supplier submits their acknowledgement of Wabtec Corporation’s expectations, and the SQE has linked the part to the supplier, an e-mail is sent to the buyer requesting issuance of a sample PO.
53Confidential & Proprietary
PPAP: Initiate EHS ReviewResponsibility:
Buyer
Review the material, then route the EHS Review to “Assign Supplier”
After routing the EHS Review, be sure to return to the PPAP and route it as well.
54Confidential & Proprietary
EHS ReviewResponsibility:
Supplier
Click here to route the EHS Compliance to the next phase
Upload the proper EHS Document
55Confidential & Proprietary
EHS Review (Conducted EHS Review)Responsibility:
EHS Team
Scroll to the bottom of the page, then decide if additional EHS Review is necessary
If additional EHS Review is required, fill in the Sourcing Specialist field
If additional Review IS required, route here
If additional Review is NOT required, route here
56Confidential & Proprietary
EHS Review (Final Decision)Responsibility:
EHS Team
If Rejected, fill in the required comments section and route here
If Rejected, route here
If Accepted, route here
57Confidential & Proprietary
EHS Review (Chemical Approval)Responsibility:
EHS Team
Indicate Approval of Safety or Technical Data Sheets
If Disapproved, Route here
If Approved, Route here
58Confidential & Proprietary
PPAP: Issue Sample POResponsibility:
Buyer
Send to Supplier to Execute PPAP Requirements after Sample PO is created
Buyer may send back to SQE if there is an issue with requirements or ERP linkage
59Confidential & Proprietary
Execute DeliverablesResponsibility:
Supplier
1. Login through Supplier Chain Connect (SCC)https://scc.wabtec.com/
60Confidential & Proprietary
Execute DeliverablesResponsibility:
Supplier
Supplier clicks blue hyperlinks to open PPAP requirements and add their objective evidence
61Confidential & Proprietary
DeliverablesResponsibility:
Supplier
After uploading the required deliverables route the deliverable to “Submit to WABTEC” so the deliverables can be reviewed
Submit to Wabtec
Attach the completed deliverables
Deliverable templates may be provided or referenced for use
62Confidential & Proprietary
Execute DeliverablesResponsibility:
Supplier
Submit to Wabtec
Submit to Wabtec
Add any additional comments
After submitting all deliverables use the routing bar at the top of the page to route the PPAP to “Approve Deliverables”
63Confidential & Proprietary
Approve DeliverablesResponsibility:
SQE (CAT 1 & 2) / DE (CAT 3)
Click the link to open, review and approve each deliverable
After deciding if the deliverables are acceptable or not, the decision will appear on the link
64Confidential & Proprietary
Approving DeliverablesResponsibility:
SQE (CAT 1 & 2) / DE (CAT 3)
If approval is given, route to “Completed”
If the deliverable is not acceptable, route to “Send to Supplier” for revision and resubmission
Review the deliverable Objective Evidence
Provide Approval Decision
65Confidential & Proprietary
Approve DeliverablesResponsibility:
SQE (CAT 1 & 2) / DE (CAT 3)
If any deliverables are unacceptable or incomplete, SQE may add comments and route back to Execute Deliverables phase.
If any deliverables are acceptable route the PPAP to Ship Samples phase
66Confidential & Proprietary
Ship SamplesResponsibility:
Supplier
Attachment may be used to attach documents such as final inspection results or bill of lading
Send to Review Samples phase after shipping information has been provided
Completely fill in all required fields:
67Confidential & Proprietary
Review SamplesResponsibility:
SQE (CAT 1 & 2) /DE (CAT 3)
1. Indicate if samples have been received and date received, if Yes2. Indicate if inspection is required, if Yes indicate if they passed inspection 3. SQE may decide to assign fit-up actions using the “Assign Fit-Up” action button, if
required4. Indicate if Sample fit-up is approved once complete, if required
68Confidential & Proprietary
Fit-up ActionResponsibility:
SQE (CAT 1 & 2) /DE (CAT 3)
1. SQE may indicate fit-up requirements in the “Comments” field2. SQE assigns responsible MTA3. SQE assigned responsible Quality Engineer4. SQE assigned responsible Secondary SQE
After all required info is provided the SQE sends to MTA to schedule fit-up
69Confidential & Proprietary
Fit-up ActionResponsibility:
SQE (CAT 1 & 2) /DE (CAT 3)
After all required info is provided the MTA sends to Quality Engineer to conduct fit-up as planned
MTA to schedules fit-up
70Confidential & Proprietary
Fit-up ActionResponsibility:
SQE (CAT 1 & 2) /DE (CAT 3)
After all required info is provided the Quality Engineer sends to Supplier Quality Engineer to disposition fit-up
Quality Engineer performs fit-up and indicates PASS or FAIL and may attach objective evidence
71Confidential & Proprietary
Fit-up Action
SQE may choose to send back to quality engineer to address identified issues.
SQE sends to Completed phase when final disposition is provided
Supplier Quality Engineer assesses fit-up details and provides a fit-up disposition decision
72Confidential & Proprietary
Review SamplesResponsibility:
SQE (CAT 1 & 2) /DE (CAT 3)
SQE sends to Validation Review phase once all inspections and fit-up actions are completed
73Confidential & Proprietary
Validation ReviewResponsibility:
DE (CAT 1 & 3)
Review the Validation Records and make an approval decision
Use the routing bar at the top of the page to send the PPAP to the next stage
74Confidential & Proprietary
Approval Types
Full Approval
• All PPAP requirements are complete, change is approved and product is released.
Disapproval
• Product cannot be shipped
• Change cannot be cut-in
Approved with Conditions
• Define all conditions that apply
• Required to set expiration date / maximum quantity (optional)
75Confidential & Proprietary
Team ApprovalResponsibility:
SQE (CAT 1 & 2) DE (CAT 1 & 3)
PE (CAT 1, except Low risk)SQL (CAT 1 & 2, except Low risk)
Each team member will provide an approval decision & the system records who provided approval decision
76Confidential & Proprietary
Team ApprovalResponsibility:
SQL, SQE, DE, PE
If “Approved with Conditions” is selected, Condition Details and Expiration Date is Required
Disapproved requires a reason to be entered
77Confidential & Proprietary
Approved With ConditionsResponsibility:
SQL, SQE, DE, PE
A PPAP will remain in the Approved with Conditions phase until: 1. The conditions are met and the PPAP gets routed back to “Team Approval” for
final approval2. It becomes clear that the conditions can not be met and the PPAP gets routed to
VOID
Conditions can be seen by clicking on the “Approval” tab
78Confidential & Proprietary
Closed Closed PPAPs are kept on file for future reference, the fields are not editable and no additional action needs to be taken.
Use the tabs to help find information you are looking for