PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce OECD-April 2013

Upload: others

Post on 19-Oct-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

PPP challenges and initiatives

in France

Francois BERGERE Director French MoF PPP taskforce

OECD-April 2013

Page 2: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

2

1. French PPP market: track

record to date Building on a long experience of concessions, the new

availability-payment PPP toolbox – around the Contrat de

Partenariat – has managed a quick ramp up since its

adoption:

2004, general legislation on “contrats de partenariat” (CP),

2005, creation of the MoF PPP taskforce (MAPPP)

New law passed in July 2008 to improve, extend & clarify the legal framework for PPPs

2009-10: PPP used for Economic stimulus package

Page 3: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

3

First feedback promising quality- & quantity-wise, but limited visibility on future deal flow

Feedback & Prospects First encouraging assessment for PPPs

• Over 500 projects attributed (2004-2012) for an aggregate amount of investment >16 bn€

• France= 1st or 2nd market by volume of PPP investment in 2011-12 (EIB) due to its mega infra projects.

• But still a niche (<5 % of total public investmt)

• Large number of projects of limited size (admin. Buildings, street lighting, road works…) at local level

• 90% of project equipment delivered on time, on budget (PWC study of PPP performance June 2011)

• Still too early to assess operating performance

Page 4: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

4

2-New Challenges ahead

Limited visibility for 2013 & beyond, due to crisis:

1.Budgetary sustainability

Projected Fiscal base of procuring authorities revised downwards

2.Financing issues

Credit crunch still affecting market, with Banks MIA

& bonds still nascent

3. Political reassessment & media treatment (PPP bashing?)

Page 5: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

5

+ Beyond the crisis:

- increasing worries about LT adaptability &

sustainability of PPPs

- First projects gone wrong (Evry Hospital:

320M€)

- Complexity management both on public and

private sides: PPP deals are complex to assess,

conduct, structure & control

-limited market share for SMEs & non-French

players

- Off-balance sheet constraint in view of evolving

IPSAS & Eurostat criteria

Page 6: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

6

2.1-Budgetary sustainability

Fiscal constraint stronger than ever at central & local levels

Global lifecycle costing in PPPs makes real cost over time appear more clearly

More selectivity required upstream in launching new projects (cf Gallois report )

Budgetary sustainability study now required for central projects ( Dec 27 Sept 2012)

Page 7: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

7

2.2- Financing issues: a lingering

crisis impact

• French market for PPP projects impacted in 2008-9

and again in 2011-12 by the Credit crunch

• Several large domestic banks have withdrawn

from PPP market

•Big-ticket PPP projects in the pipe only managed to

close in 2010/11 thanks to specialized para-statal

windows ( EIB, CDC…)+ State guarantee,

•Situation difficult for small to medium projects :

increasing spreads+ unavailability of LT financing

•Concerns about New financial regulations: Basel 3

Page 8: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

8

2-3 Political reassessment :

New gov’t in place since 2012

Concerns about policies inherited

from previous govt

Issue of frontier between public &

private sensitive

Some high profile failures blown

up by media => public opinion

issue

Page 9: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

9

3- Audit & recommendations by

MoF -Jan 13

•1 Comprehensive audit performed in H-2

2012 by IGF (Ministry internal audit)

•2 Critical review of PPP projects

procedures, control & results

•3 Proposals to reinforce VfM study stage

& better protect public interests

•4- But no overall challenging of PPP

policy

Page 10: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

10

3-1 Recommendations

Unify legal framework around CP ( currently

several sectoral variants co-exist)

Clarify & strengthen legal conditions for use

Avoid budgetary grounds for resorting to PPPs

Centralize reporting/follow up of all contracts

Systematize ex post assessments

Generalize VfM preliminary comparative study to

all large gov’t projects

Page 11: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

11

3-2 Prospects for 2013 & beyond • Reassessment under way of potential

projects/sectors eligible for PPPs ( Energy transition,

Plan Numerique, Plan Campus, Grand Paris...)

• More brownfield ( rehab, modernization…), less

greenfield + Smaller unit size

• Financing issues: find new sources of LT financing

on capital markets (thru securitization, EU Project

bonds…) + public co-funding (subsidies upfront,

milestone payments…) or refinancing + user-fees

when possible…

• Pipeline programming & regular dealflow to attract

compétition

Page 12: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

12

4-Comparison with UK-PFI

Divergences:

– Minimum size requirement

– Equity funding competition to increase share of equity

– Public sector investment in SPV’s equity to improve transparency

– Fewer new projects are being launched upstream

– Limits to eligible sectors

Convergences

- Overall positive record of PPP so far despite somme weak points

- Limit “ soft services” + more flexibility required

- Centralize competences within public sphere

Page 13: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

13

Thank you for your attention!

Mission d’Appui aux PPP/ French MoF