![Page 1: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/1.jpg)
Practice Standard for SchedulingProject Manager’s Meeting Status
April 28, 2004
Project Manager – Douglas Clark, CEO of Métier
![Page 2: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/2.jpg)
2
Practice Standard for SchedulingMission
The Practice Standard for Scheduling will:
• Provide guidelines on developing, using and understanding project schedules.
• Remain consistent with the PMBOK® Guide, expanding its concepts and techniques related to Scheduling.
• Describe the processes related to Scheduling that are generally recognized as good practice for most projects most of the time.
• Include information that is broadly accepted within the project management community.
![Page 3: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/3.jpg)
3
Practice Standard for SchedulingOrganizational chart
PM I S tandards Program Adm inistrato rK ristin W righ t
P ro jec t M an age r A ss is tantA m y V acca ri
C h a ir A ss is ta n tT B D
C h a ir A ss is ta n tT B D
Com m ittee M em bersT BD
L e x ico n C o m m itte e C h a irT a m m o W ilke ns
C h a ir A ss is ta n tT B D
Com m ittee M em bersT BD
P ro ce ss C o m m itte e C h a irP e te r D im ov
C h a ir A ss is ta n tT B D
Com m ittee M em bersT BD
S ch e d u le P a rts C o m m itte e C h a irC h a rlie F o llin
C h a ir A ss is ta n tT B D
Com m ittee M em bersT BD
O th e r P ra c tice A re a s L ia sonJe n n ifer R e ad
Practice S tandard for Scheduling P ro ject M anagerD oug C lark
P M I Sta n d a rd s M an a g erS te ve F ah re nkrog
![Page 4: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/4.jpg)
4
Practice Standard for SchedulingCharter
The expected publication date for the Standard produced by PS-Scheduling is: March 2006
The team will provide the following interim deliverables:• Detailed Project Plan• Outline of the Standard• Pre-exposure Draft of the Standard• Exposure Draft of the Standard• Final Draft of the Standard incorporating agreed-to Exposure
Draft comments• Documents showing disposition of all Exposure Draft
comments• Publicity articles for PMI publications
Additional deliverables may be identified during project planning, and should be reflected in the Project Schedule.
![Page 5: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/5.jpg)
5
Practice Standard for SchedulingMethodology
• Organize - Build foundation processes to generate the standard
• Audit – Ensure all intra-team comments are tracked
• Develop Piecemeal – ground up
• Components of a schedule
• Component attributes, behaviors, and best practices
• Best practices for scheduling (MPMOTT)
• Appendices
• Integration
• Exposure
![Page 6: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/6.jpg)
6
Practice Standard for SchedulingHigh level schedule
![Page 7: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/7.jpg)
7
Practice Standard for SchedulingHigh level schedule
![Page 8: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/8.jpg)
8
Practice Standard for SchedulingSuccess to date
• Finalized process document
• Approved draft glossary
• Developed and approved style guide
• Developed a web based comment tracking system
• Developed template system for component development
• Identified and adjudicated through team a draft component list
• Initial committee work underway
• Developed a draft document outline
• Approved an initial schedule
![Page 9: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/9.jpg)
9
Draft Document Outline
PrefaceIntended audienceDocument organizationIntroduction
OverviewPurposeApplicabilityWhy use a schedule?What is a schedule?The schedule as a model
Components of a ScheduleComponent - NAME
DefinitionBehaviorsAttributesRecommended best practice
Scheduling Best Practices (most projects most of the time)Properties of a Good Schedule
AppendicesAppendix A – Standards Setting ProcessAppendix B – Evolution of the standardAppendix C – Contributors and ReviewersAppendix D – Guidelines for a PMI Practice StandardIndustry Specific best practices and examplesFuture directions and trendsXML SchemaReferencesGlossaryIndex
![Page 10: Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier](https://reader036.vdocument.in/reader036/viewer/2022072006/56649f4a5503460f94c6bb75/html5/thumbnails/10.jpg)
10
Practice Standard for SchedulingQ&A