Page 1: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

1

PRE- FEASIBILITY

REPORT

FOR

BLACK TRAP (AREA – 00-52-64 HECTARE)

OF APPLICANT

ANAND QUARRY WORKS(UNIT-1)

AT

SURVEY NO: 52 K PAIKI ON MAHI RIVER,

VILL: UDALPUR, TAL: SAVLI,

DIST: VADODARA- 393105, GUJARAT

Page 2: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

2

EXECUTIVE SUMMARY The application has been done for the Environment Clearance of Black Trap lease area 00-52-64 hectare by M/s ANAND QUARRY WORKS(UNIT-1).

Mr. Arjunbhai kesavbhai odera is a proprietor of this proposed project.

The project is located at Survey No: 52 K paiki On Mahi River, Vill: Udalpur, Tal: Savli,

Dist: Vadodara - 393105,Gujrat.

This is a proposed Black Trap project.

Some facts about the mining lease:-

I. This is a New Black Trap project.

II. Lease application copy is attached as per Annexure – 1 of Form-1 application.

III. There is no blasting involved in this project.t.

IV. Approximately 10 Nos. of workers shall get employment opportunity

V. Sr. No. In the schedule is 1(a)

VI. Category of project is B.

VII. The proposed Lease area – 00-52-64 hactare.

VIII. The lease area is located between 22°48'27.00"N Lattitude and 73°23'42.79"E Longitude.

IX. Proposed production of Black Trap is @ 1,80,000MT/ TPA.

X. There is no any National Park, Forest, Wild Life Sanctuary, Eco Sensitive Area

and notified industrial area are presented within 15 km radius of the project.

XI. Order of Honorable Supreme Court of dated 27/02/2012 regarding the mining

projects with lease area less than 5 hectare including projects of minor mineral (with less than 5 hectare) required environment clearance.

Page 3: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

3

INDEX

SR. NO. DESCRIPTION PAGE NO.

1. Introduction of the Project / Background Information 4

2. Project Description 6

3. Site Analysis 9

4. Planing Brief 10

5. Proposed Infrastructure 12

6. Rehabilitation and Resettlement (R & R Plan) 14

7. Project schedule and Cost Estimates 15

8. Analysis of Proposal (Final recommendation) 16

Page 4: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

4

CHAPTER – 1

INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

1.1 IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT

This is a project of Black Trap.

The project is located at Survey No: 52 K PAIKI On Mahi River, Vill: Udalpur, Tal:

Savli, Dist: Vadodara - 393105,Gujrat .

Category of project – B

Sr. No. In the schedule – 1(a)

The existing Lease area – 00-52-64hactare

The applicant Mr. Arjunbhai kesavbhai odera is a proprietor of this Black Trap

project.

1.2 BRIEF DESCRIPTION OF NATURE OF PROJECT.

Black Trap mining is a practice that is used to extract Black Trap, mainly through

an open pit. However, Black Trap is also mined from beaches, inland dunes and

dredged from ocean beds and river beds.This Black Trap is being done at Mahi

River. It is often used in manufacturing as an abrasive, for example, and it is used to make concrete. As communities grow, construction requires less wood and

more concrete, leading to a demand for low-cost Black Trap. Black Trap is also

used to replace eroded coastline.

Another reason for Black Trap is for the extraction of minerals such as rutile,

ilmenite and zircon, which contain the industrially useful elements titanium and zirconium. These minerals typically occur combined with ordinary Black Trap,

which is dug up, the valuable minerals being separated in water by virtue of their

different densities, and the remaining ordinary Black Trap re-deposited.

Page 5: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

5

1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY

The Mining project falls in the area of the Vadodara district, Guajrat. As industrial

growth and infrastructure growth is going on day by day in Gujarat, there is huge requirement of Black Trap that plays a very crucial role in any developing

countries as it is major ingredient in constrution work and various other industies.

1.4 DEMAND AND SUPPLY GAP

As infrastructure growth is on peak in Gujarat, there is a huge demand of Black

Trap as a raw material in costruction works. There is a marginal gap between

demand and supply.

1.5 EXPORT POSSIBILITY

Total Black Trap extract from the mining will be sale out in domestic market only.

No export is proposed.

1.6 DOMESTIC/EXPORT MARKET

Total BLACK TRAP extract from the mining will be sale out in domestic & nearby

market as per the requirement.

1.7 EMPLOYEMENT GENERATION (DIRECT & INDIRECT) DUE TO THE PROJECT.

About 10 staff members including labors directly and approximately 10 persons

will be engaged indirectly in this proposed Black Trap project. Thus total 20 person

will get employment including directly or indirectly. Considering 5 people in a

family, total 20 x 5 = 100 person will be benefited and shall depend on the mining

activities of this mining lease area.

Page 6: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

6

CHAPTER – 2

PROJECT DESCRIPTION

2.1 TYPE OF PROJECT (INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY)

This is a project of Black Trap from the lease, having an area of 00-52-64 hectare and a production capacity of 1,80,000MT/TPA.

2.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES.

The entire project area is 00-52-64hectare. The area break up in the following

table:

Lease area (Ha)

Agricultural Land(Ha)

Grazing land (Ha)

Forest land (Ha)

Total (Ha)

00-52-64 Nil Nil Nil 00-52-64

Key plan of the project is attached as per Annexure – 2 of Form-I.

Layout plan and short view is attached as per Annexure – 3 & 4 of Form-I.

XII. The lease area is located between 21°51'30.18"N Lattitude and 73°14'32.05"E

Longitude .

2.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATION GONE INTO SHOULD BE HIGHLIGHTED.

The mining shall be done in the allowed lease area only. No alternative sites are

used for mining activity.

Page 7: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

7

2.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM/FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN)

Black Trap from River bed will be carried out by Semi-mechanized method. The manufacturing process is attached as per Annexure-5.

2.6 RAW MATERIAL REQUIRED ALONG ESTIMATED QUANTITY, LIKELY SOURCE, AND MARKETING AREA OF FINAL PRODUCTS MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT.

This is a mining project for mining of Black Trap so no need of raw material. The

final product will be Black Trap which will be transported directly through road to

the local market as per requirement of market.

2.7 RESOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED.

No optimization/recycling and reuse envisaged in the project.

2.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY/POWER REQUIREMENT AND SOURCE SHOULD BE GIVEN.

As this is a Black Trap project over Mahi River. No other industrial water shall be

required. Total domestic water requirement at the mine will be about 1.0 KL/Day

for drinking and others requirements. Water will be brought by water Borewell from

nearby villages. Power is required only for running the machine and diesel is required to run that

machine so diesel will be purchased from the local suppliers. No such power requirement for the project.

Page 8: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

8

2.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL.

There will be no such waste or hazardous waste generated from Black Trap. Only

rejected materials will be generated. They shall be used for refilling of low lying area

or for paving roads. Waste available are also backfilled and spared all around the

river bank. This shall strengthen the banks of river.

Page 9: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

9

CHAPTER – 3

SITE ANALYSIS

3.1 CONNECTIVITY

The existing project site is well connected with all the infrastructure i.e. telephone,

fax, road, railway, airport, etc.

The nearest railway station is Timba Road @ 1.96 km.

The nearest airport is Vadodara @ 56.03 km.

The nearest Town is Savli which is @ 32.22 km.

Also the school, collages, hospital, etc are available within the 15 km radius from

the project site.

3.2 LAND FORM, LAND USE AND LAND OWNERSHIP.

The entire lease area is 00-52-64ha.

The total lease area are used for the Black Trap.

Mr Arjunbhai kesavbhai odera is a proprietor of this proposed mining area. Lease application copy is attached as per Annexure-1 of Form –I application.

3.3 TOPOGRAPHY (ALONG WITH MAP)

Topography of the area is plain terrain.

3.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO THE PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN.

There is no any National Park, Forest, Wild Life Sanctuary, Eco Sensitive Area

and notified industrial area are presented within 25 km radius of the project.

Page 10: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

10

CHAPTER – 4

PLANNING BRIEF

4.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION.

Other facilities such as power, transportation and communication, social

infrastructure facilities are locally available near project site.

4.2 POPULATION PROJECTION

The project is small in magnitude. No influx of population is expected as labor

shall be hired from nearby area and/or local villages.

About 10 staff members including labors directly and approximately 10 persons

will be engaged indirectly in this proposed mining project.

Heads According to 2011 Total population of Vadodara

Dist 807022

Total Male Population 42188 Total Female population 44834

Percentage of decadal growth 12.14 Total Literacy in % 68.26 Total Area (Sq m) 3239

Page 11: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

11

4.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.)

Existing Black Trap is covered 00-52-64 hectare area.

SR. NO. Items Existing Green Belt

1. Total

Mining area

00-52-64hectare Green belt shall be developed

along periphery of lease area. 2. Depth of

mining

Mining will be done as per guidance

of Geology and Mining department

4.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL)

4.4.1 PHYSICAL INFRASTRUCTURE

The road facility is already available which are being used and maintained. The

labour requirement are drawn from the nearest villages, which are also be trained

as per requirement. Other requisite infrastructure as transport of mine labours is

available by way of jeep, two-wheeler. Medical facility is available for fist aid at

project site. Govt. Dispensary is available nearest villages.

4.4.2 SOCIAL INFRASTRUCTURE

About 10 staff members including labors directly and approximately 10 persons

will be engaged indirectly in this mining project. Primary infrastructure like road,

water, phone, schools are available in nearby area.

4.5 AMENITIES/FACILITIES

An office-cum-store shall be constructed near working area. Water is required for

drinking purpose as well as for domestic, sprinkling and plantation. Water is

available in nearby area and shall be supplied through Borewell.

First aid box with all necessary materials shall be kept all time in the office building

for use as and when required.

Page 12: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

12

CHAPTER – 5

PROPOSED INFRASTRUCTURE

5.1 INDUSTRIAL AREA (PROCESSING AREA)

An office-cum-store shall be constructed at mine area for primary necessities.

5.2 RESIDENTIAL AREA (NON PROCESSING AREA)

No residential area is existing. Workers are available in nearby area.

5.3 GREEN BELT

To improve the environment of the area it will be planted 50 trees along periphery

of the lease area.

5.4 SOCIAL INFRASTRUCTURE

This project shall provide employment oppertunity for about 10 people directcly

and indirectly, employment shall be generated for providing about 10 persons

which are shopkeepers, mechanic, drivers, transporters etc. The project is

responsible for social benifits like water, health care measures, educational

benifits, promotion of culture & religious activities.

5.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO / WATER WAYS ETC)

6 The existing project site is well connected with all the infrastructure i.e. telephone,

fax, road, railway, airport, etc.

7 The nearest railway station is Timba Road @ 1.96 km.

8 The nearest airport is Vadodara @ 56.03 km.

9 The nearest Town is Savli which is @ 32.22 km.

Page 13: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

13

9.1 Also the school, collages, hospital, etc are available within the 15 km radius from the project site. DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)

Water requirement of 1.0 KL/Day will be met through Borewell.

9.2 SEWAGE SYSTEM

Domestic sewage i.e. 0.50 KL/Day will be generated which will be disposed off

through Septic/Soak Pit system.

9.3 INDUSTRIAL WASTE MANAGEMENT

No Industrial waste will be generated from the project.

9.4 SOLID WASTE MANAGEMENT

Spoil material from Black Trap will be generated which will be used for filling up low lying area. It is also proposed that remaining waste will be used by local

people either for making and maintaining roads or as filler for the foundation of the

house at no cost.

9.5 POWER REQUIREMENT

Power is required only for running the machine and diesel is required to run that

machine so diesel will be purchased from the local suppliers. No such power

requirement for the project.

Page 14: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

14

CHAPTER – 6

REHABILITATION AND RESETTLEMENT(R&R PLAN)

No R&R plan is required as no displacement of people is proposed for the mining project.

Page 15: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

15

CHAPTER – 7

PROJECT SCHEDULE AND COST ESTIMATES

7.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN)

This is Black Trap project.There is no such construction activity is required for this

project.

.

Page 16: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

16

CHAPTER – 8

ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

8.1 CONCLUSION

In the interest of mineral development infrastructure boom and improving the

social conditions of the local habitants, this project should be allowed after considering all the environmental aspects.

Page 17: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/...5 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the

17