Page 1: PRELIMINARY ENERGY ACTION PLAN

PRELIMINARY ENERGY PRELIMINARY ENERGY ACTION PLANACTION PLAN

MUNICIPALITY OF NEA KYDONIA – MUNICIPALITY OF NEA KYDONIA – CRETECRETE

————————————INCUBATOR OF NEW ENTERPRISES INCUBATOR OF NEW ENTERPRISES

OF CHANIAOF CHANIA

Meeting in Chania 19-21/5/2010

Page 2: PRELIMINARY ENERGY ACTION PLAN

Municipality of Nea Kydonia is located west of Municipality of Nea Kydonia is located west of Chania, in an area of 2150 hectares.Chania, in an area of 2150 hectares.

It has a population of 7500 inhabitants and It has a population of 7500 inhabitants and approximately 18000 beds in hotels of all approximately 18000 beds in hotels of all categories.categories.

The estimated energy consumption in the hotels The estimated energy consumption in the hotels in this municipality is 35.758 KWh during 2009 in this municipality is 35.758 KWh during 2009 and the CO2 emissions due to energy use are and the CO2 emissions due to energy use are 28.606 tn CO2.28.606 tn CO2.

Page 3: PRELIMINARY ENERGY ACTION PLAN

The distribution of energy per hotel sector is The distribution of energy per hotel sector is presented below:presented below:

Distribution per sector of energy used in hotels Distribution per sector of energy used in hotels

in Nea Kydoniain Nea Kydonia

%% KWhKWh

Hot water Hot water productionproduction

2323 8.224.3408.224.340

Space coolingSpace cooling 3434 12.157.72012.157.720

KitchenKitchen 1919 6.794.0206.794.020

LightingLighting 88 2.860.6402.860.640

OthersOthers 1616 5.721.2805.721.280

TOTALTOTAL 100100 35.758.00035.758.000

Page 4: PRELIMINARY ENERGY ACTION PLAN

The Energy saving potential in the hotels The Energy saving potential in the hotels includes:includes:

1.1. Proper insulation of the buildingProper insulation of the building

2.2. Replacing old bulbs with new more efficientReplacing old bulbs with new more efficient

3.3. Improving power ratio (cos Improving power ratio (cos φφ))

4.4. Install ceiling fans in the roomsInstall ceiling fans in the rooms

5.5. Install automatic energy control in the roomsInstall automatic energy control in the rooms

6.6. Regular maintenance of heating and cooling Regular maintenance of heating and cooling systemsystem

Page 5: PRELIMINARY ENERGY ACTION PLAN

The Renewable energies’ potential in the The Renewable energies’ potential in the hotels includes:hotels includes:

1.1. Hot water production with solar thermal Hot water production with solar thermal systemssystems

2.2. Space and water heating with solid biomassSpace and water heating with solid biomass

3.3. Use of PV systemsUse of PV systems

4.4. Use of goethermal heat pumps with high Use of goethermal heat pumps with high C.O.P.C.O.P.

Page 6: PRELIMINARY ENERGY ACTION PLAN

The energy savings in hotels of Nea The energy savings in hotels of Nea Kydonia due to various measures include:Kydonia due to various measures include:

a)a) Installation of solar thermal systems for hot water Installation of solar thermal systems for hot water production, particularly in summer operating hotelsproduction, particularly in summer operating hotels

b)b) Replacing old bulbs with new energy efficientReplacing old bulbs with new energy efficient

c)c) Installation of automatic power control in each roomInstallation of automatic power control in each room

d)d) Use of heat pumps with high C.O.P. Currently air to air Use of heat pumps with high C.O.P. Currently air to air heat pumps are broadly used with C.O.P. = 2heat pumps are broadly used with C.O.P. = 2

e)e) Proper insulation of the buildings (roof and walls) and Proper insulation of the buildings (roof and walls) and replacing old windows with new with double glazingreplacing old windows with new with double glazing

f)f) Installation of ceiling fans in the roomsInstallation of ceiling fans in the rooms

g)g) Use of PV systems for power generation in the case of Use of PV systems for power generation in the case of attractive feed in tarrifsattractive feed in tarrifs

Page 7: PRELIMINARY ENERGY ACTION PLAN

Estimated energy saving potential in hotels Estimated energy saving potential in hotels in Nea Kydoniain Nea Kydonia

SECTORSECTOR POWER POWER CONSUMEDCONSUMED

ENERGY SAVING POTENTIALENERGY SAVING POTENTIAL

KWhKWh %% KWhKWh

Hot water Hot water productionproduction

8.224.3408.224.340 3030 2.467.3022.467.302

Space coolingSpace cooling 12.157.72012.157.720 2020 2.431.5442.431.544

KitchenKitchen 6.794.0206.794.020 1515 1.019.1031.019.103

LightingLighting 2.860.6402.860.640 3030 858.192858.192

OthersOthers 5.721.2805.721.280 1010 572.128572.128

TOTALTOTAL 35.758.00035.758.000 20,5520,55 7.348.2697.348.269

Page 8: PRELIMINARY ENERGY ACTION PLAN

FORECAST OF ENERGY CONSUMPTION AND FORECAST OF ENERGY CONSUMPTION AND COCO22 EMISSIONS IN HOTELS IN NEA KYDONIA EMISSIONS IN HOTELS IN NEA KYDONIA

FOR 2020FOR 202020092009 20202020 %%

Number of beds in Nea KydoniaNumber of beds in Nea Kydonia 17.87917.879 25.74625.746 +44+44

Number of beds in CreteNumber of beds in Crete 146.955146.955 211.615211.615 +44+44

Energy consumption per bed Energy consumption per bed [KWh / bed [KWh / bed · year]· year]

2.0002.000 1.5891.589 -20,55-20,55

COCO22 emissions per bed emissions per bed

[tn / bed [tn / bed · year]· year]

1,61,6 1,271,27 -20,55-20,55

Energy consumption in hotels in Energy consumption in hotels in municipality of Nea Kydonia municipality of Nea Kydonia [KWh][KWh]

35.758.00035.758.000 40.910.39440.910.394 +14,41+14,41

COCO22 emissions from hotels in emissions from hotels in municipality of Nea Kydonia [tn]municipality of Nea Kydonia [tn]

28.60628.606 32.69732.697 +14,30+14,30

Page 9: PRELIMINARY ENERGY ACTION PLAN

Financial IncentivesFinancial Incentives

The municipality can inform and facilitate any possible The municipality can inform and facilitate any possible investor about financial opportunitiesinvestor about financial opportunities

Legal ToolsLegal Tools

a)a) Make obligatory the energy performance certificate for Make obligatory the energy performance certificate for tourism enterprises if they want to have an operation tourism enterprises if they want to have an operation license.license.

b) Facilitate procedures for energy efficient construction b) Facilitate procedures for energy efficient construction

c)A member of the municipality council will be responsible c)A member of the municipality council will be responsible for energy issues in collaboration with a staff member for energy issues in collaboration with a staff member like an engineer of the municipalitylike an engineer of the municipality

Page 10: PRELIMINARY ENERGY ACTION PLAN

Communication - InformationCommunication - Information The communication plan in municipality of The communication plan in municipality of

Nea Kydonia will include:Nea Kydonia will include:

a)a) Participation in the organization of Participation in the organization of seminars with various specialized seminars with various specialized structures of the private sector, which will structures of the private sector, which will be focused in the hotel owners and the staff be focused in the hotel owners and the staff of tourist enterprises.of tourist enterprises.

b)b) Co-organization of an info day about energy Co-organization of an info day about energy saving and application of renewables in saving and application of renewables in tourism sector, together with other tourism sector, together with other municipalities in the prefecture of Chania municipalities in the prefecture of Chania and the local Universities and Research and the local Universities and Research Institutes.Institutes.

Page 11: PRELIMINARY ENERGY ACTION PLAN

Communication - InformationCommunication - Information

c) Organization of yearly campaignsc) Organization of yearly campaigns

1.1. In the primary and secondary schools in the In the primary and secondary schools in the municipalitymunicipality

2.2. In various hotels of the municipality during In various hotels of the municipality during the summer periodthe summer period

d) Creation of a section in the web portal of the d) Creation of a section in the web portal of the municipality, regarding the possibilities and the municipality, regarding the possibilities and the opportunities for applications of cost effective opportunities for applications of cost effective energy investments in hotels and other energy investments in hotels and other enterprises in tourism sector.enterprises in tourism sector.

Page 12: PRELIMINARY ENERGY ACTION PLAN

Creation of an advising and support Creation of an advising and support structurestructure

Municipality of Nea Kydonia can participate in a Municipality of Nea Kydonia can participate in a support structure which will be created with support structure which will be created with other municipalities in a cooperative form.other municipalities in a cooperative form.

Page 13: PRELIMINARY ENERGY ACTION PLAN

Thank you for your kind Thank you for your kind attentionattention