S---~~~' Safety Review Progress and Status of AP1000 in China National Nuclear Safety Administration February 9, 2009, Washington D.C. Safety Review Progress and Status of AP1000 in China Background Format and Content of PSAR Review Team Review Target Review Progress and Status Statistical Data of the Review Technical Cooperation with NRC Achievement of the Review Shortcoming and Disadvantage Preliminary Review Comments Following Review Plan Background P.R.China and the U.S.A. signed a Frame Contract about import four AP1000 units on July 24, 2007 in Beijing, two units are assigned as Sanmen NPP unit 1&2, another two units are assigned ,as Haiyang NPP unit 1&2. * The first engineering project of AP 1000 in the world was started on December.31, 2007. * Sanmen NPP submitted a CP application for its unit 1 &2 to NNSA on February 25, 2008, with all supporting documents, including PSAR. Sanmen NPP expects that they can start construction (First Pour of Concrete) in March, 2009, and connect to the grid in September, 2013. Haiyang NPP submitted a CP application for its unit 1&2 to NNSA on May 26, 2008, with all supporting documents, including PSAR. Hiaynag NPD expects that they can start construction (First Pour of Concrete) in September, 2009, and connect to the grid in March, 2014. 22~ it. N ITP i, W-on0trucflo, >/ 1

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

S---~~~'

Safety Review Progress andStatus of AP1000 in China

National Nuclear Safety AdministrationFebruary 9, 2009, Washington D.C.

Safety Review Progress and Statusof AP1000 in China

BackgroundFormat and Content of PSARReview TeamReview TargetReview Progress and StatusStatistical Data of the ReviewTechnical Cooperation with NRCAchievement of the ReviewShortcoming and DisadvantagePreliminary Review CommentsFollowing Review Plan

BackgroundP.R.China and the U.S.A. signed a Frame Contract about importfour AP1000 units on July 24, 2007 in Beijing, two units areassigned as Sanmen NPP unit 1&2, another two units are assigned

,as Haiyang NPP unit 1&2.* The first engineering project of AP 1000 in the world was started on

December.31, 2007.* Sanmen NPP submitted a CP application for its unit 1 &2 to NNSA

on February 25, 2008, with all supporting documents, includingPSAR. Sanmen NPP expects that they can start construction (FirstPour of Concrete) in March, 2009, and connect to the grid inSeptember, 2013.Haiyang NPP submitted a CP application for its unit 1&2 to NNSAon May 26, 2008, with all supporting documents, including PSAR.Hiaynag NPD expects that they can start construction (First Pour ofConcrete) in September, 2009, and connect to the grid in March,2014.

22~it.

N ITP i, W-on0trucflo,

>/ 1

Page 2: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

Format and Content of PSAR

* PSAR of Sanmen NPP and Haiyang NPPare based on Tier 2 of AP1000 DCDRevision 16, with some plant specificinformation.

* The format and content of PSAR shallcomply with RG1.70 and SRP.

Review Team

1182 technical persons are involved in the review team for AP1000PSAR in China, they are from Nuclear and Radiation Safety Center(NSC), Nuclear Power Research and Design Institute of ChinaNPIC), Beijing Nuclear Safety Review Center (subpart of Beijinginstitute of Nuclear Engineering, BINE , Mechanical EquipmentReliability Center, Suzhou Nuclear Safety Center.NSC takes the overall technical responsibility of the nuclear safetyreview project, organizes and cooperates with other organization tocarry out the review project.- Mr. Tang Be is the technical principle of the review project.- Mr. Chai Guohan is the project manager.- All the chief Reviewer of each chapter (except QA) of PSAR are from

NSC.*Raeyiew.Seamfoi~5L, 000PSARP

Review Target

* Familiar with the design of AP1 000, obtain all ofthe technical supporting documents.

* Ensure that the review scope and depth of CPapplication of AP1000 in China are equivalent tothat of COL application of AP1000 in the USA.

* Ensure that the Scope and Depth of NuclearSafety Regulation to AP1000 in China areequivalent to that in the USA.

* Confirm the design of AP1000 are conformancewith Chinese Nuclear Safety Requirements.

Review Progress and.Stat~us

20". W.5,4, fld, ac-1,, . sZ: I~ p

a ~ ~ ~ ~ Vý 1., CPa5~, :M. I.AT _______

l.,d ,FIS~vhPT.A 20 1 31 :00 1.' ''' :0C' I 1.

p..,,,,a~w,,.or,,o.,o.Cog ImI1' at' ' nT~pflp~l.pIStpt00 1M I ta al 2 I0'p [C t5.PpP.PQ.P~,Ah~W.p.F~PI 2M, t. I, '~ o '~

a.p.p . -.

2

Page 3: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

Statistical Data of the Review

Sanmen NPP- There are 1572 questions in The First Batch of PAIS.- 663 Action Sheets are generated during the first review meeting.- There are 698 questions in The Second Balcn of. R!s.

269 Action Sheets are generated during the second reviewmeeting.

- Several review topics have been chosen.Haiyang NPP

There are B56 questions in The First Batch oefRP..- 276 Action Sheets are generated during the first review meeting.

Technical Cooperation with NRC

* NRC -has torrned Ore Regulatory Reaiew for re Descn Certdcaton of AP600 and AP1000about tO year;, Deoign cerbtbaton 01 AP

0 0 0 and AP ,&- aue been isusd e-araraly by NRC.

and NRC 0s pen~orrtne tne Regularry Revieaw of AP, 000 Dc amendment Ap.. aton a severalcOL Applc~atroO tar AP 0 rn mee USnA. tigt now.

STne frot tour undos of AP100 will be built and overated in China., fi expenenbe of safety ren-ew,cansbuctlan, commissIon, and operation of AP1000 in Chin is ry mnpyrtant O bothm unties

* Cooperabin actiono till ow:- Talannwr..nhol . APIrOa t-hb ft. A-1 5 * I 1r . 2007.

-Consaftl I. NtRt CC o t FZaI B=t.onf I1 PI P5A tbanRoIS. ta NP P tR N IuJuly 2 M8)- Worba~p No dRCdutrord ttebwtortn Ibp AP 0rbelis kon 0d 20 1o1 31. 200.- uAdot ..obue.nta r.-ted t1.tn.I.ue..r l.w•1. 0 AP 1r DO(tha . h. o OA.h- n. prid.by In

* o 151u"c R -Wa I d bn- rrd -ab noýao

- C ofaIdarr om..tlnaof IIracarty It.~ .o A N=pprrm b-F.arnb 8 W 14, 2tMd.

* Coopertoon n the computer codes tsepected

Achievement of the Review

Most of the targets have been achieved.a Review conclusion will be formed, it will

support the final decision on issue of CP.

Shortcoming and Disadvantage

* The efficiency of the safety review is affected due to thelanguage problem, all of the review documents are inEnglish;

* Some review questions has no actual progress afterseveral Q&A rounds due to poor communicationbetween the Reviewer and the Designer, and due to thelimited number of WEC experts attended the reviewmeeting.

a The review time is not sufficient, the Reviewer don't haveenough time to read all of the review documentscarefully.

* Audit calculation has not been performed due to lack oftools,

3

Page 4: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

Preliminary Review Comments

* Most of the review questions have been closed.Some open questions need a technical positionof NNSA.

* There is not any big issue which could affect theissue of CP to Sanmen NPP on schedule fromthe view point of nuclear safety review.

* There maybe some uncertainties duringconstruction, equipment manufacture,commission due to lack of experience, so risk ofinvestment (such as delay of construction and/oroperation, non-conformance of importantequipment, etc) maybe exist.

Following Review PlanSSan.men NPo

- Coalr 1,.the,. -i ,. (E et-i Is-,of teo int iod aind .- t. roml O )

-ontaren meaetnag 0 Nu iS Ind R-1. A4- Coml,~ le a- aeae IoM CP eISan... NP .- Ae O~tty edit-, -a ol ... h. PsAR of s.-. hpt.

* Haiiyar NPP

- or-d~ ah..i,

Follow up the NRC' re"ulatery review of Application of AP10DO DC amendment and Applicationof COL for AP1000 in USA, keep the design of Sanmen NPP and Hal•iang NPo the same as foatwill be buit in USA isesetensive as possible. Satety Reviewon any important design modifitdtlonin the future.riSome tofica need to be -eviewed atter CP bOc defote FSAR, so as to minimite ni mess of safety

Establotame kecondtions for Aud alationof APtOD. so as to petorm audt calculationon w en key a asgno analyses in the future.

4

Page 5: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

(7'1~i~-~' tWndarsafryMattatantonota AU hu

Organization ofthe~China regulatory body &

]organiization ofthe:China ýregdlatory Ubdyý&.overview ofthe Chinese NPP regulatory framework

~7S~ Im

• • •.. .... ... ... .,

• .• .-

O " 'Nuclearpiower plants in'China"

-') Construction. ofsafety infrastructure

Q .PP viewand apprv.:pmcess

Evolution of the rolesJ' IfNS

QSafety requirements and practices

National Nuclear Safety Administration, P. R. China

O-ýN&'cIe~rower -,pansiChaNP~o n O~erooos oaeooe.Realor Rled* ling of FCD -corn-oeejt

Qonlean !:r. I I PWR 1 -310 I 1985103/21 1 1994A)4/01

D Unaiy 1 C2 PWR 2 k .'' 19871/0017 ,1994102/01..:Day n Bay: '•Uni 2 ,CN 3 I I'•{C Y) ,-: 2 9 1 •" 1988104/07 199410510 -

,-toaunit I CN-3 PW . . - 1994900 91105/ISý isa Unft ýj -CN-4 'j tpwR • .'.. ..- 1 9961116192 ý ',2002/04/15"

'Phon I' /Unal 2 ,CN;5 (CNP650) ' - 1997914101 2004405103

ýUnhtl CN- pwR1 -19997105/15' :.21t2002/2h/Ltge Unit 2,. CN-7 t cU 1997/11129 1t3010

nQrnnlta UntI 1 t :CN " 1 :199/i06t08 2102/12/31a Phone m Unit2 CO (CN) . - 1998109/25 2003107/24

" iav .. '% 'UnI t I ICN-10 "I ".pWR. l X 1 !1999/10/20

Ua2CnO 11 n . (WWER 20"0009/20 060

*jNONE

N OPP, o -cons'rue o - ReactorR,- a Ratedpower" Do : oFCDtype 1,1,(MWe) _.._._.'"_" _,

0/tl3 pWR :2005/1 2/15 *" ' o "c" "1Uni .4 00)o 2006/06/15

-Qaja Unti(4-Qalt-ai3 ' PWR " X650 2006/04128

Pi-tofl Ui (N6 2007/01 t28 .Hog h. "Unitl P.wR 2007/08/18-4 H ng dl e:"-P l0• .2XI080-.

og . '- : int ( 2 )" 000)-2008/03/28

•I- I PWR x . ,o,

•tag .. , nti•, .. 2 P . __,_•_,,.__.:_-._.

Page 6: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

.O .... Reactor J Roted power Expected:41te of

S fety Rev iew type .(MtWe) FCD

Ow2009/tHongyanhe Unit3 PWR 2008

uit4 • CPRIOO) 2X .t . 9" . Unitt PWR , 12080

* Yangji g ".l- Unit 2 :. (CPRI000) .2009

'Unit t PWR 2009;Unit.2 (M310) "2009

sotc , Ui 0 .-'(AP1O00) : ,.2X1250; "013 ". "* Io n . Unitl I -PWR 120 r013•Saunten .• :ni. 2013 J

-Unit 2 IPOO t

Tnon Unit > PWR20/0' Unit 2. • -AP1000) 2014

"" ,U it,2 "' : EPR) "',

112 L7 7-0ýu-l -:ý-I - z ý ýý*- ý!ý- -ý

Nuclear power plants-iin China

. French Design•,:

CP: Daya Ba 29BOMWe-Lingao ZX980MWe

::ER:Taishan 2 XI750MWe

L~.

* :Canadian Design:-CNDU Qinshan hase lll,2 2X700MWe '•

RPussian Design:.V,'VVWWE R'- 'Ti awan n-22XIO•6°MWei t Wý;. N

American Design_._ APO000: Sanmen: ý2XI1250MWe'-

i Ha.yanng: 2XI25OMWe

. Chinese-Design:

..,,Qinshan 300MWe

C- p6 -5 Qinshan Phasel1"'L-

A ,,4X'S6uM i e,

~3 1'O1 Fuqing .2 X 1OOOMWe

Fangjiashan 2 X 1OOOMWe

Page 7: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

.CPRIO.00'f*;hi:ngao:3&4 2X:1080M\

i'm .L, ND

PI.-,-'-

KD~ onstucton osalfety infrastructure.:Founidation of NNSA

NsA' was fouded in 1984

ýj indepe~ndnt fromn Nuclear industry'Defning .thePrinciple: Safety first, Ouaffirsi

Promoting thesafety Culture;-,Govemrnment reform in 1998: NNSA-was combined into

SEPA-(now-he-MEP---Mift" -oiEf-omelnta4-Protection) ..

:: Totally meore than 3060 staff for.the whole system.

S ., a i s s o c i a t e d m m i e • : . • . . ,

-uEleatro agi•ntacprotection.:..' Rsec

•. re. ct.o-. , Fu -l .ec .l .R d a e... -:

11 1 ýI

Page 8: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

* Responsibilities defined by law and,reg Ulations-:-..,

Law & policy -m aki ng on nuclear Safetyand :radiation prOtection..

I- Safet reviewtandy icense management.Safetyinspectionin the installations.,KNuclear and radiationmaccidents.investigation and treatmentr.'

- Nuclear accidentlemergency preparedness'and response:'i.-onspe:tnergencyr response plan review and

- off site: cooperating with nationalcompetentauthority,.

A-Nuclear safety studyNuclea"safety international cooperationRadiation ,environmental monitoring

-Electromagnetic environment management-

Licensing, on, radioactive isotope and devices:Uranium (Thorium) and radioactive associatedmine management

w >.Radwaste~management

Supervision on nuclear equipmentzdesign," manufacture, installation:and N activities.,,

' .Welding~workercertificate

-'Foreign nuclear.equipment dompanies"registrationand equipment import checkout... :

* Licensing ProcessSittingcPzFirst fuel loading

DecommnissioningReactor ,operatorýRadioactive sources

*NucleariEqiuipmnent..

Page 9: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

4Ndersafety legalfai eok

%IAEA safety standards are'used as,reference+Goodlpractice for newcomers in nuclear'industryKeeping the high and:universal level of-safetyLegalbasisfor licensing :process5-level framewoIrk:-Laws

"Regulations-Departmental rules:Safety~guides-"Technical documents

YrLawvs. .A

of-RadioactivelContamination (2003) 4" .

N uclear instalIlations,,emergenc,,response, •I

u , lear materialss ources, equipment Reg .l •

Moretlian 20 . - .-Subdocuments unde regulations Deportmnetal Rui" • S,

., HAl'Feas (SafeG,,sRequirenents)

MNoe than 70 (HAD series):

More than 180 .techic. ..... .

-NýLaws --

. .s.,Ssued•by,ithe Congress'(mbhdatory).y,•Setting uptadinistratiV, permissions.

-"'Nuclear EnergyýAct' or "Nuclear Safety Law'-is to be establshed.

a Regdlationsýlss uedby the State Council ,(mandator~y).-Setting uip administrative scope, ýprincilples,organizations and its' functions etc.

mb.DpartmentailRules .

,- issuedbyeGovernmenta organizations-. -

';IAmplemenetanl rules: Defining the imple mentalJmeth ods based on the Regulations.Safetyý,requirements: Settirig~up nuclear safety.0 bjctives and basic requirements.

4,Safetyj'Guides.Issued ýby the eGovernmental organizations.(recommendatorý) . : . ..Recomnmending the methods or procedures'tosatisfy.the safety requirements.

Page 10: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

* Technical documentsSlssuecby therGnvenmental organiZations

§, im'ilar toI1AEA TECDOC:

.Oganizational-systemý,FrameworI -:Headquarters + advisory cornmission

""MMt

"MOM".I

+ Re.•,• .... l offices + TS• ..s ,

it.,~rI solce

mm~-a c. omVb1JL~

-9 ,divisions-and 42 staff in the headquarters.,'- Annuailproject budget about 90 000,000 RMB,

•.Advis orycommission -

*more than 100 senior experts (includingacademicians)

4 professional groups: 1) nuclear reactor andsystem, 2) fuel recycle, radwaste and sitting, 3)'

-radiation and emergency response, 4) I&C and,mechanicaI equipment

-6regional offices and totally more than .10.0-ý,.'staff- 4

prfomn inspection to nuclear installations-7.and radioactive sources in the areas.

-special function for North Regional Office:performing safety review and inspection on

-n uclear equipmient related activities.'

*TSOs

-5 main TSOs providing teclinidal support~toý.NNSA in safety review and inspection

Page 11: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

s Nuclear and ~Radiation Safety Center (NSC)I NSC was found in 1989,belonging to MEP tooz

I the most important TSO to NNSA -I MO, '14 divisions, 170 staffI annual project budget: about 20,000,000 RMB

providing comprehensive techniical support to'NNSA.,

*NSC's functionsProviding technical support on safety reviewand inspection (nuclear installations,-radwaste, decommissioning, nuclear material,transport, nuclear equipment..Performing environmental impact evaluationEvaluating nuclear installations events.Providing technical support on emergency --

preparedness and response (Accidentemergency response technical center).

I- Providing technical suipport to law-making,electromagnetic environment management,nuclear technology applications:...

-Performing international cooperation andnuclea afety studies.

*Training~.Regular trainirn :

Annual-Ins pector training course~Staff exchange within the system, or with the

-' - utilitiesThrough IAEA, OECD and bilateral agreements(USA, France, Canada, Japan...)

I4mportled Project Trarinin-Getting support from vendor couintries (USA,AFrance, Canada) for batch training -(I year,* 1I2year) - 7

-7Getting suprpor~t from buye~rfor technii'cal trainingcourse on imported-project (2 weeks)

Page 12: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

Capacity. bdiiding.:,

ýCom-puter (Cyber 18OI83O,'from UNDP)," 'Software (from vendor countries, e~g.

AS N/IRS N)".Safety studies,

' Inspection mode-and procedures,,.Databanks,--Event reporting system,~Experience feedback system,

. Emergency responrse-system, -

Ra ,dia Itio'n enviro -nmental monitoring network.-..-

4.-.Working modes'Safety Review

Technical reView

S:Advisory Commission review and-consultation

- IsSuing 'license

Inspection •

-- routine:inspections performed by.regional offices

- Comprehensiveior special inspections~organized by•'. ':NNSA ;"." .- ".: - ... • '." • . "

-- P revie~w an-d approval Process- - tonal.nuclear powef-developrnent middle-long -

term pOliah*(2005-2020),-ornationI nuclear power;,-deivelopmentfiviie-year planiý

*Approvail document'frcm!NRDC for earlier stage,

-. Apprvalý-docuýments fro'mrelated government'al I,organizations, ForeMEl(NNSA): approval documentsfor EIR (sitting stage):and site safety analysis report

• NRDC organizing advisory companyto evaluate'theapplication 'documents- ' ....

• State:-Councii :meeting for..project approvali -, -.

'a MEP,(NNSA). reviewingýPSARý, EIR (des-ign stage), QA-.- program (design stage)Ifor-CP.,: -

S'MEP( NNS.A)(reviewingFS:AR, EIR.(operational stage),- QAp•rogram•.(operational stage) Emergency Planwfor -

'first fuelrloadingapermitn it N - u n P.

-.After l~year.-triahbpera-tion, NNSA Iissuin~g OP

Page 13: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

(; Evolu ion of the roles of NNSAe At beginning:

Not involved. in the decision for national nucleardeveloPing-program (including thledecision forAmportingtNRP).,Onlyxresponsible for the safety review and inspection:ofithe :NPPthereafter. .

Remediatioqn-mea ,sures~may costz lot dlue to the,.different safety: requirementsabetweeh buyer country r.and vender country.. .

*At present:-,Actively participating-in the national-decision processon any-nuclear power related-issues.

T. For~importing project, NNSA requires the Chinese-buyer company:

To reflect nationalisafety requirements in the commercial-contract,."To setup corresponding Items in contract convenient for

- the safety~review,,equipment inspection, share oft - .:softwvare,:porsonltraining etc..

Sending observers to the commercialnegotiation.or 0rinformithe Chinese buyer company in advance

• 'i::th'e corresponding requirements '-•i

0 :- orgariizi ng comp reh ensiveý review of mo re than 100sites-,

.":More :and more supportifrom the Government

O Safety requirements and practices-* -. orIimpor~ting, .NPPs ----

-. Sfet-reiewpricipes:Prior to review, some.principlesshould.be clearly defined by discussion with,the utilities.'Esp'1ecially ,the codes and standards which

. mbstbe-followed - , - - - -

Codes and standards,:,Requirements fromnrelated,.:Chinese laws;,•eguiations,-departmental rules must be:satisfied.-Technical standards from vendorncountry-maybe adopted. (e.g.' RCC, RSEM.....Joint revi"ew:orconsutltation: Seeking for help from .

:nuclear safety authority of vendor country (e;g.,.ASN/IRSN) : .-

Inspection experience exchange: (GRO(egional office of- -,NNSA inýGuangdong)land regional office of.ASN in Lyon

signed a agreementand exchangeinspectors and --expe'riencetperiodically. t

*raining, ýho ,ingtraning course~and sending staff tovendobrcountrylfortraining (ASN IRSN), ..,

- o;bring, up technical an•l dmanagemenntistaff, ." o rasteogreth•review, thehniques sandesknll,"

- get fam•iliar•with vend6ordcountrys8afety . ODCs.•nd• .tandardsy.t r yTry'to get support frovmnutilityand vendorscountry's-nuciear safety2uthorityfor.above-mentioned aCtiVitieS.

* -Sladescomputercodsaeith utilitiec: some computercodes importa nt tousafetyireviewsshou n dcbe fs•haredb tweenuch NNSAitindcutilitiesmtIfrnecessary, NNSAewilepiurchase-additional computer codes~f frtindependent

-.checking calculation during the safety, review.

Page 14: Presentation by NNSA at Meeting with NRC February 9, 2009. · Statistical Data of the Review Sanmen NPP-There are 1572 questions in The First Batch of PAIS.-663 Action Sheets are

•Equipment inspection: -

"communicating'iniadvancewith utility, setting up someitems in the commercialcontract for-NNSA performing,inspectionto the equipment manufacturediin foreign.icountries -

*internati~onalthr party cooperation-,_ IAE4A -cD -aind1 other related i nuclear, safety authorities-.i

for independentfconsultationIAEAPr'eOSARTiOSART

r Tlanwan:. '2004:11 ;QinshanlII:,2005;03"

.IAEA expert consultationCFER design safety review in 1998,-follow-up in 2001

•:OECD MDEP-.

* Forlexported NPPs.(Chashma), V'China is-a~responsible country and has the obi'help Pakistanltoensure'the safetyof.CHASNUF

Nclea safey cooperatioinagreementllbetween-NNSA-and PNRA. A steering.'U.

implementation ofthep1annedtactivities?

At the6 requs fo NA;,:NS C h as. provided .se'rvices on training, SAR .. ,..-review~consultation,- equipment. _inspectionmconsultation€etc.sincel 992.

n .to2. .:

SRO;(regional office oflNNSA'S nshanghal) providesservices ;on~commissioning inspection;,trairning ofinspectors.

Peer review to TSO.of PNRA: At.the requestlfrom PNRAand its TSO,-.NNSA/NSC sent a~expert~team.to Pakistan

.toperfosrmrapleer-review based:onýlAEA safety-standards and-Chinese practicesin;2006.:

A .. > . ; . .

Thank you::. ofryoUr attentin!n