![Page 1: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/1.jpg)
PresentationOn
Pipe Lines and CNG Station Safety at CUGL
![Page 2: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/2.jpg)
Content
• About CUGL
• Organogram
• Safety Infrastructure
• Safety Practices
• Safety Training
• District Level Coordination for Safety
• Challenges
• Forward step for Safety
![Page 3: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/3.jpg)
Central UP Gas Ltd.
Infrastructure NO.
Cities Kanpur, Bareilly, Unnao, Jhansi(New)
CNG Stations 14 (3-MS, 10-OLS, 1-DBS)
CS Pipe 87 Kms
MDPE Pipe 310 Kms
Industrial Connections 37
Commercial Connections 92
Domestic connections 4200
Gas Sales 0.2 MMSCMD
Turnover FY 13-14 197.00 Cr.
EBITDA FY 13-14 46.24 Cr.
PAT FY 13-14 25.07 Cr.
![Page 4: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/4.jpg)
Organogram
Managing Director
Sr. Manager O&M
*Dy. Manager-HSE
Officer-HSE
2-Firemen8 Line Patroller
Kanpur
1-Firemen 2-Line Patroller
Bareilly
Asst. Manager Proj
*Recently Joined
![Page 5: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/5.jpg)
Safety Infrastructure• Odoriser at all three CGS
• TR Unit for Cathodic Protection for all CS Pipe Line
• Pole Markers/Directional Markers/RCC Markers for pipe line
• Warning Mat for identification of pipe lines
• ABC,DCP,CO2 Fire extinguisher at CNG Station as per OISD 179
• CO2 Flooding system at all compressors
• Flame Proof light at CNG Stations
• LEL & Gas detectors
• CS Pipe line tracker
• Emergency Vehicles
![Page 6: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/6.jpg)
Safety Practices• Monthly Cathodic Protection monitoring
• Daily Pipe Line patrolling
• Daily inspection of all commercial & Industrial installations
• Weekly Inspection by Firemen for Pipe line and CNG Stations
• Regular painting of Pole Markers/Directional Markers
• Timely Hydro testing of mobile and stationary cascade
• Work place inspection
• Monthly safety reporting and meeting
• Timely maintenance of Fire extinguishers
• Quarterly safety Audit by Third party
• Electrical Safety Audit
• CNG Station inspection by Fire deptt. For fire fighting facilities
• Mock Drill
![Page 7: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/7.jpg)
Safety Training
• STC training twice in a year for all CNG filler and operators
• STC training for PNG Control room persons and Line patroller.
• Monthly safety trainings at all CNG stations
• Tool Box talk
• Safety training with Nagar Nigam, Development Authorities, Fire department, Police, Jal Nigam, PWD, NHAI, Telecommunication companies.
• Audio Campaign at domestic societies.
• Safety training before Commissioning.
![Page 8: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/8.jpg)
District Safety Coordination
• To avoid third party damages, DM/ADM is taking meeting onevery Wednesday and sharing information related toexcavation.
• A common information forum is created to share and preintimate the excavation plan and take NOC from all stakeholders.
• Stake holders are Nagar Nigam, Development authorities,Electricity companies, PWD, NHAI, BSNL, CUGL, Jal Nigam andPvt. Telecommunication companies.
• Provision of huge penal action in case of any fault.
![Page 9: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/9.jpg)
Challenges
• OFC laying companies. 550 Kms 4G OFC laid by Reliance. IDEA, AIRTEL, BSNL is yet to laid the OFC in Kanpur and Bareilly.
• Electricity Company and Jal Nigam are laying their cable and pipe line for severe.
• Widening of HN-2 to four lane in Kanpur is effecting 12 Kms of existing CS pipe line catering 20000 SCMD to industries.
• Non availability of Hydro testing facility at Bareilly. All vehicles have completed 3 year dead line. Matter has raised to CCOE but they don’t found any solution. They are asking CUGL to establish own hydro testing facility.
![Page 10: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/10.jpg)
Forward step ensuring Safety
• Training to third parties for creation of awareness.
• Collection of Supervision charges for pipe line crossing and provide supervision for safe crossing.
• Measurement of CS Pipe line thickness randomly.
• GPS facility for all LCV.
• Annual meet/gathering for all Govt excavation bodies.
• Mutual Aid with IOC BKPL terminal and KFCL Kanpur.
• Common Mock Drill with IOC BKPL Terminal.
• Mutual Agreement with Gun Factory is in process.
![Page 11: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/11.jpg)
Commenced Training Program Recently
• Safety And Technical Competency Training
![Page 12: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/12.jpg)
Celebrated National Safety Week
![Page 13: Presentation On Pipe Lines and CNG Station Safety at CUGL · 2014. 9. 9. · Presentation On Pipe Lines and CNG Station Safety at CUGL. Content • About CUGL • Organogram ... Asst](https://reader036.vdocument.in/reader036/viewer/2022071514/613612da0ad5d2067647c8b9/html5/thumbnails/13.jpg)