Peninsula-Mallorca interconnection. ROMULO project
2
Contents
Project motivation
General description
Marine activities
Project challenges
Peninsula-Mallorca interconnection. ROMULO project
3
Project motivation
Connect Balearic electric system to the Peninsular-European system
Benefits for the Spanish electric system: generation costs
CO2 emissions
Benefits for the Balearic electric system: large improvement in security of supply
existing
planned
RÓMULO
Peninsula-Mallorca interconnection. ROMULO project
4
General description
Double link, HVDC, 2 x 200 MW, 250 kV, metallic return
2 HV cables + 1 MV/FO cable
No submarine joints
Max. depth: 1.485 m
Length: 244 km
Turn-key contracts: Siemens (converters)
Nexans/Prysmian (cable system)
Peninsula-Mallorca interconnection. ROMULO project
5
Morvedre converter station (Sagunto, peninsular side)
Peninsula-Mallorca interconnection. ROMULO project
9
HVDC Cables design
2 direct current cables Conductor: copper 750 mm² - 1.200 mm² Insulation: mass impregnated paper Screen: lead alloy Reinforcement (armour): double layer of
galvanized steel tapes Outer diameter: 94 mm
DIRECT CURRENT CABLES (poles)
Land cable Submarine cable (shallow)
Submarine cable (deep)
Cu 1.200 mm2
No armour
Cu 750 mm2
Single armourDepth < 200-220 m
Cu 750 mm2
Double armour
Weight: 23 kg/m Weight: 23,5 kg/m Weight: 29,5 kg/m
Peninsula-Mallorca interconnection. ROMULO project
10
Within scope of turn-key contract
3 independent laying campaigns January – March 2011 From Mallorca to Sagunto Giulio Verne and Skagerrak
Post laying protecion works Scope: burial of cables 1m under seabead,
up to 1000 m water depth January – July 2011 Jetting, 284 km (Edda Fjord)
Rock trenching (Argo), 23 km
Protection works in Posidonia
Marine activities
Peninsula-Mallorca interconnection. ROMULO project
11
Status of the project All permits and authorizations were granted in 2009 and 2010 (Spanish
Ministries of Environment and Industry, Coastal Departments, Port Authority)
Converter stations: civil works and installation finished, testing ongoing
Morvedre (Sagunto) converter station energized in June 2011
Santa Ponsa converter Station will be energized in October 2011
Land and marine sections works: cable installation and protection completed
Operation of the interconnection will start late 2011
Peninsula-Mallorca interconnection. ROMULO project
12
Project challenges
First HVDC submarine interconnection in Spain
World second deepest installation (1.485 m)
Highest investment for a single project in REE (400 M€)
Interconnection operation and energy management