  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    1/25

    QC Issues - Contents

    Comparison on Cube vs Cored samples

    QC issues on Spraying Application

    Curing

    QC issues on Pre-Application

    Test Methods

    Calculation on Accelerator Dosage

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    2/25

    EUROPEAN SPECIFICATION for SPRAYED CONCRETE

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    3/25

    Good Spraying Technique ?

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    4/25

    Spraying Technique Hand Spraying

    Spot the mistake ???

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    5/25

    If you value your

    hands

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    6/25

    6

    State of the Art - Robotic Spraying

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    7/257

    Application Nozzle AngleNozzle angle

    Nozzle should always point 90 to the receiving surface

    For spraying onto steel arch / lattice girder exceptions will be required

    90

    90

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    8/258

    Application Nozzle Distance

    Nozzle distance For Robotic application the distanceshould between 1 2 m

    Influence Incorrect nozzle angel and distance

    has significant influence on concrete

    quality like poor compaction,

    strength etc, and will dramatically

    increase rebound

    90

    90

    1-2m

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    9/25

    QC issues on Application -Layering

    9

    The surfaces must be cleaned before

    spraying to guarantee bond

    Consistent high quality concrete isessential throughout the different layers

    Thin passes guarantee continuity inthe quality of the sprayed concrete

    throughout the different layers. This is

    essential for final linings

    Consistent Sprayed Concrete quality through out

    the different layers

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    10/2510

    In case of bad spraying, spray shadows form behind the

    reinforcement bars

    Water migrates into these voids, allowing corrosion of the

    reinforcing bars

    Corrosion reduces the diameter of the bars and there fore

    there strength. The lining looses its lode bearing capacity

    No spray shadows behind reinforcement bars

    QC issues on Application - shadow

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    11/25

    QC issues on Application - shadow

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    12/25

    Same concrete mix from one truck, sprayed 10 minutes apart!

    Sprayed by two different nozzlemen during training

    Compaction is important for durability

    Application technique can be dramatic

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    13/25

    Shotcrete Applicator Training Programs

    13

    Recognized Standards

    Trial Panel Spray Training Basic & Advanced Concrete Technology

    Training

    Robotic operator training

    Hand Spraying applicator training

    Shotcrete Application Techniques

    Equipment Calibration and Instruction

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    14/25

    Shotcrete & Nozzleman Certification

    The American Concrete Institute conducted the first ShotcreteNozzleman Certification Scheme in Asia

    Kah Fai Lee ( Tam Singapore ) Alve Rutgersson ( Tam Singapore )

    and Ritchard Hood ( Tam Hong Kong ) successfully completed the

    course, and examinations, and are now ACI certified shotcrete

    nozzlemen.

    Alve Rutgersson is to be accedited with ACI Assessor certification

    Alve Rutgersson , Ritchard Hood, Kah Fai Lee of Normet have

    recently obtained the EFNARC Shotcrete Nozzlemen Assessor

    certification for Robotic Shotcrete Application

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    15/25

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    16/25

    Curing is essential in sprayed concrete

    As with conventional concrete, permanent

    sprayed concrete structures need to be curedor the following may occur:

    Rapid moisture loss and dryingresulting from the tunnel ventilationsystems

    Relatively high cement content in mixand early reaction temperatures due toaccelerated mix may cause rapid dryingand shrinkage cracking

    Without proper curing, we get poorbonding, low strength and poor

    durability

    16

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    17/25

    So why is curing important? The term hydration of cement means the

    reaction between the cement and the waterwhich makes calcium silicate hydrates(CSH)

    The CSH is the gel or binder that givesconcrete its strength

    If the water in the concrete evaporates tooquickly, then these important hydration

    processes are not given a chance to createa dense, strong matrix between theaggregates

    Curing is needed to keep the water in thesprayed concrete as long as possible tohelp hydration of the cement

    Good curing gives: Higher compressive strengths

    Higher bond strengths

    Increased durability

    Less shrinkage cracking

    17

    (Cement + water = CSH)Original cement particle

    Hydration products

    ( CSH )Water to complete

    the hydration

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    18/25

    Pre-Application - Ordering of Concrete

    The Nozzlemen should be informed about:

    General mix design, w/c ratio, slump, with or withoutfibres, etc.

    The use of special admixtures for control ofhydration (open time), etc

    The quality/performance requirements of theapplied concrete

    Result from pre test, type and dosage of setaccelerator

    Location and orientation of the area to be applied

    Details of reinforcement and concrete thickness tobe applied

    Total amount of shotcrete to be applied at thelocation

    The timing for the application and supply rate for theconcrete

    18

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    19/25

    Pre-Application Delivery Acceptance

    Control of concrete on arrival at the spraying location should be

    according the contract requirements Check delivery note of each truck mixer if according to order, and note

    any exceptions

    General visual assessment of the supplied mix before transferred into thehopper

    Visually check presence of fibre and possible fibre balling (if applicable)

    Check visually for any separation of the concrete mix Measure slump or flow for each delivery

    Never add water to the mix for correction of slump

    Spraying of test panels and sampling as required according to contractQC requirement

    In case of interruptions longer than 15 minutes, slump to be observed

    and re measured

    In case of exceptions, or any doubt, report to responsible site engineerfor approval prior to start of application

    19

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    20/25

    Vicat Test testing the reactivity of cement with accelerator

    Interpretation of results:Initial set < 2 min 4 min

    Final set < 5 min < 8 min > 8 min

    Rating Good Acceptable Not acceptable

    E l St th T ti P t t

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    21/25

    Early Strength Testing Penetrometer

    Penetrometer Needle For testing of early strength

    from 0.2 to 1.0 MPa

    21

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    22/25

    Early strength testing -Hilti Pull Out Tester V

    22

    Early Strength Testingusing stud driving from

    3 to 12 MPa

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    23/25

    Compressive Strength Testing

    23

    Test Spray Panels Coring of Spray Panels

    For Compressive Strength > 10 MPa

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    24/25

    Pre-ApplicationDelivery Acceptance 1 Litre Test

    1 2

    3 4

  • 7/27/2019 Presentation-Sprayed Concrete QC Issues (Customer)

    25/25

    Calculation of Accelerator Dosage

    What we need to Know ?

    Weight of cement in kg per m3 (Cementkg )

    Weight of Silica Fume / PFA / Slag (

    Binder kg)

    Output of concrete pump ( Qc m3 / hr)

    Density of Accelerator ( D = kg /L)

    Dosage of Accelerator in % by weight of

    cement ( %)

    Formula is :

    ( Cement kg + Binder kg ) x (m3/ hr) x (%) / 60 min/hr / D