Page 1: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

PRESS FILE

|PRESS FILE | SEPT 2015Matmut ATLANTIQUE

Page 2: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

| |PRESS FILE | SEPT 2015 | PAGE 2

Page 3 . . . . . . . . . . . . Computer graphics and key numbers

1. UN STADE INÉDIT

Page 4 . . . . . . . . . . .

Page 5 . . . . . . . . . . .

Page 6 . . . . . . . . . . .

Page 7 . . . . . . . . . . .

Page 8 . . . . . . . . . . .

Page 9 . . . . . . . . . . .

Page 10 . . . . . . . . .

. A stadium for Bordeaux

. A practical and functional architecture

.A new English style stadium

. A strategic location

. A successful landscape integration�

Les Girondins, resident club

More than a stadium, a new living space

2. CONSTRUCTION PROJECT DONE RIGHT

� Page�11�

� �

Page 12 . . . . . . . . .

Work completed in 42 months

The stadium driving jobs

Key construction figures

3. A 21st CENTURY STADIUM

Page 14 . . . . . . . . . .

Page 15 . . . . . . . . . .

Page 16 . . . . . . . . . .

Page 17 . . . . . . . . . .

�High technology sound and lights �

A hybrid playing field

The actors

�Contact & useful information

The Atlantic’s Largest Scene

DISCOVERING THE MATMUT ATLANTIQUE

The Matmut Atlantique is a new generation multifunction venue dedicated to sports and culture. With a modular capacity of 42,000 seats, it is designed to welcome a rich and diversified programming: sports competitions, spectacles, concerts, corporate events… Through its novel architecture and comfort, it offers spectators a unique experience centered on a spirit of conviviality. The only stadium of its size in the larger South West, it inscribes itself as a structuring element in the region, a unique venue for gatherings, sharing and partaking of emotions for all generations. Inaugurated in May 2015, the Matmut Atlantique will host on May 23 the first match of the FC Girondins de Bordeaux, the stadium’s resident club and the semifinals of the TOP 14, this coming June 5 and 6. Official stadium of the 2016 Euro, it will host 5 of the competition’s games in June and July 2016.

SUMMARY

Crédits�Photos�:

©�Vigouroux�–�Perspective

©�Thomas�SANSON

©�Philippe�CAUMES

©�Richard�NOURRY

Matmut ATLANTIQUE

Page 3: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

| |PRESS FILE | SEPT 2015 | PAGE 3

Tram lines B and C

Several bus lines plus special services on game nights

8,000 parking places nearby

1,500 places for two wheelers (secured)

KEY NUMBERS…

ID CARD

SURFACE AREAS

MATMUT ATLANTIQUE’S COST AND FINANCING

AUTRES CHIFFRES CLÉS

Main events’ calendar

KEY PROJECT DATES

ACCESS

-> Concept architects : Herzoz & De Meuron

-> Executive architects : Groupe 6

-> Construction : VINCI-FAYAT Group

-> Owner : City of Bordeaux

-> Management : Société Stade Bordeaux Atlantique (SBA)

-> Resident Club : FC Girondins of Bordeaux

-> Capacity : 42,115 seats

(19,000 seats if upper stands are closed off)

-> Concept and construction cost : €183M

Global surface area : 18, 6 hectares

Parvis�:�4,9 hectares (41 047 m² West and 8 445 m² East)

Stadium : 4, 6 hectares (233 meters long, 210 meters wide, 37 meters high)

State

City of Bordeaux

Bordeaux Métropole

ELoan taken out by VINCI/FAYAT

M6 contribution and annual 30 year lease to the FCGB

Aquitaine Region

Field : about 1 hectare

-> January 2010 Municipal council votes on the start of the tendering process

-> July 2011 Le�projet�de�l’équipe�«�Vinci-Fayat/herzog�&�de�Meuron�»�est�retenu

-> October 2011. The “Vinci-Fayat/Herzog & de Meuron” project is selected

-> July 2012 The building permit is obtained

-> November 2012. The land parcels are available for the work to begin

-> April 2015. The New Bordeaux Stadium is made available to the city

-> Ligue 1 - May : Girondins de Bordeaux – Montpellier May 23, 2015

-> Top 14 – June :

Semi-finals of the French rugby league championshipJune 5 and 6, 2015

-> Open House – June : June 20, 2015

-> Ligue 1 – August :

Resumption of the French championshipAugust 9, 2015

-> French National Team – September : France – Serbia September 7, 2015

-> Euro 2016 – June and July :

Four qualifying round matchesJune 11, 14, 18 and 21, 2016 One quarter final July 2, 2016

24 km of tiers

41 000 m3 of concrete

14 km 664 trees planted on the site

1 000circular metal columns

6 km of stairs

12 000 tonnes of metal framework

28 M€

17 M€

15 M€

15 M€

114 M€

20 M€+ 3,85 M€

of stair treads

Matmut ATLANTIQUE

Page 4: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

A stadium for Bordeaux

A novel stadium

Bright and open, the Matmut Atlantique is also elegant, inasmuch as one can use that word to describe such an imposing structure. Clean and understandable, its geometry gives and impression of monumentality and grace. One would be tempted to compare it to an ancient temple set atop its pedestal, but here the passageway blurs the boundaries between the interior and the exterior. Countless columns rising from the large staircases accompany the visitors’ comings and goings. The fusion between the steps and the columns stand as a gesture of welcoming and accessibility.

Particular attention was given to the structure’s integration into the larger Bordeaux landscape. The meticulous configuration and geometry of the bowl and the columns are the reflection of the landscape created by the surrounding trees and access roads. The stadium is designed for this specific space – an open and flat landscape in close proximity to the Fair Park which extends to the lake’s shores. The word “elegant” has become a depreciated term to describe architecture but imposes itself when referring to the urban and architectural heritage of Bordeaux. We never sought to inspire ourselves from the city’s historical quarters with their limestone edifices and monuments whose beauty takes your breath away. What we perceive as this city’s elegance stems in large part from the consistency of scale and materials as well as from a formal precision of great purity. It was not a matter of copying this but what we could gain from it valuable teachings.

The Matmut Atlantique was designed by the architectural firm of Herzog & de Meuron with the assistance of Groupe 6. Its construction was entrusted to two major players, the VINCI and FAYAT groups. This solid and perennial association guarantees the highest levels of expertise and know-how in the design and construction of the New Stadium. Herzog & de Meuron is a partnership jointly managed by five Senior Partners: Jacques Herzog, Pierre de Meuron, Christine Binswanger, Ascan Mergenthaler and Stefan Marbach. Jacques Herzog and Pierre de Meuron founded their agency in Basel in 1978. Today, a team of 400 international collaborators work on projects across Europe, North and South America as well as Asia. The projects designed by Herzog & de Meuron range from the individual home to large scale urban works. The agency can be credited with numerous highly recognized public buildings, notably stadiums and museums as well remarkable private factories, offices and housing projects. The National Stadium in Beijing, the Allianz Arena in Munich, the Tate Modern in London, and social housing project on the Rue des Suisses in Paris are amongst the often quoted works. Numerous prizes have been awarded to Herzog & de Meuron including the Pritzker Architecture Prize in 2001 along with the RIBA Royal Gold Medal and the “Praemium Imperiale, both in 2007.

1.

| |PRESS FILE | SEPT 2015 | PAGE 4Matmut ATLANTIQUE

Page 5: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

A “bowl” for 42,115 people�

With more than 42,115 seats, the bowl truly frames the playing field. Its geometry offers optimal visibility to all the spectators guaranteeing maximum modularity in terms of capacity and use. Polyvalent, the stadium is designed to host a rich and diversified programming: rugby and soccer matches but also spectacles, concerts and corporate events.

�The bowl is made up of two superimposed stands divided into four sectors with a cover for protection from the inclement weather. The roof’s soffits, offering great visual homogeneity, concentrate one’s gaze onto the playing field while letting sunlight through. The structure’s roof is not visible from the inside so as to not distract the spectators’ attention. The simplicity and purity of the bowl and pedestal’s architecture guarantee the safety of the crowd’s flow as well as ease of orientation.

Pedestal, Bowl, Cover

�A singular rectangular roof sits on top of the raised bowl. The choice of such a pure and quasi abstract shape is a clear and efficient response to the site’s natural conditions and to the principal flow of spectators from east to west.

This white rectangle seems to be projected towards the ground by a shower of slender columns. An undulating ribbon of concession stands and restrooms runs through this forest of columns, animated by the flow of the crowd. All at once dense and light, the structure forms an evanescent rectangular space through which one can make out the bowl’s sculpted silhouette.

�This architecture imparts a strong identity to the Matmut Atlantique. . The diaphanous volume is oriented towards the larger landscape while its passagewayexpresses its openness and accessibility to all. One can guess, through its transparency, the activities and energy that will transform this site into a new neighborhood, alive and animated.

The passageway and its coil

Accessible from the East and West parvis by large staircases, the passageway, composed of an undulating coil, forms a belt around the playing field and houses eating establishments, restrooms and services. It establishes a link between the two stand levels and offers the possibility to the spectators to move about freely without leaving the stadium’s walls. It offers all at once views of the playing field towards the interior, and of the surrounding landscape towards the exterior.

Herzog�&�De�Meuron,�2015

DID YOU KNOW?A stadium adapted to the needs of persons with disabilities and reduced mobility

Equipped with 16 elevators, the Matmut Atlantique was designed to welcome persons with disabilities and reduced mobility. 125 seats and 125 additional seats for their guides are located in the passageway near the glass railings offering a perfect visibility onto the playing field as well as optimal security of the traffic flow.

| |PRESS FILE | SEPT 2015 | PAGE 5

A practical and functional architecture

Matmut ATLANTIQUE

Page 6: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

A New English style stadium

��

At the Matmut Altantique, , no pit or fencing. The tiers’ first rows are situatedexactly 6, 5 meters away from the players’ sidelines. Safety barriers equipped withelastic cables prevent spectator access onto the field at the level of the North and South stands. Having proven itself at England’s famous Wembley stadium, the utilization of these materials is a safe bet recognized by international soccer bodies (FIFA, UEFA, FFF).

��

One meter high, the lower rim barriers allow for optimal visibility onto the playing field. Furthermore, in the case of crowd movement, access gates monitored by the stadium’s security control station open onto the field and allow the public to be directed towards the multiple building exits planned in case of evacuation.

Higher up, such as on the lodges’ level 2 and the passageway’s level 3, the barriers are larger and inverted, 90 cm high and composed of a glass surface. The utilization of glass here guarantees perfect visibility to 100% of the venue’s seats.

The work offers a perfect visibility from all parts of the infrastructure. This architectural requirement has already earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the playing field as well as an ideal configuration of the stands for creating an atmosphere worthy of the most beautiful British stadiums. This reference makes its way into the very term used for the field’s safety barriers: “the Wembley safety barriers”.

DID YOU KNOW?Local know-howThe manufacturing and installation of the metal structures linked to public safety at the Matmut Atlantique are the work of ARESTALFER, a company from the Gironde located in Gradignan. All together, the local company has produced the equivalent of 3 km of handrails positioned along the flights of stairs as well as 500 m of glass safety barriers positioned on the higher level of the New Bordeaux Stadium.

| |PRESS FILE | SEPT 2015 | PAGE 6Matmut ATLANTIQUE

Page 7: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

A strategic location

Long ago, it was a large floodable area of 1,000 hectares; starting in the 60’s however, this perimeter became the object of infrastructural and great capital works: construction of the Aquitaine Bridge, draining of the swamps, putting in place an artificial 160 hectare lake, creation of the Fair Park, etc.

�This urban planning led to the arrival of numerous administrations, companies and commercial activities as well as the emergence of a substantial hotel center.

In full boom, as illustrated by the creation of the eco-neighborhood of Ginko (the largest in France), Bordeaux-Lac has pursued its development of public works and major leisure activities (casino, international camping…)

The New Stadium’s location, with an overall surface area of 20 hectares, is at the heart of a major cultural, sports and leisure center for the Bordeaux region: golf, woods, sailing center, velodrome stadium…

Directly accessed by the region’s main roads and freeways, the work is located only 15 km from the Bordeaux-Mérignac airport. The extension of the B and C tramway lines directly connect the stadium to the city center and the St Jean station, adding to the existing bus network and self-service bicycles.

In terms of parking, the 6,000 spaces located in the Fair Park are reserved for the spectators of the New Bordeaux Stadium on the night of events. Between the floral park and the North� Stand, 1,500 spaces are planned for VIP, persons with disabilities and reduced mobility, visitors and the media. In total, more than 8,500 free parking spaces are located just a few steps away from the Matmut Atlantique. Three large bicycle parking lots will also be made available to the� spectators.

The Matmut Atlantique it situated in the Bordeaux-Lac neighborhood, on the left bank of the Garonne to the north of the city.

DID YOU KNOW?TO THE NEW STADIUM BY TRAMThe C Tram Line can transport nearly 10,000 spectators an hour on the night of matches, concerts and other events. The trains follow one another at a regulated interval of 2 min 30 sec, dropping off the spectators at the “Parc des Expositions/Stade” or the last stop on the C line, 500 meters away from the Matmut Altantique

| |PRESS FILE | SEPT 2015 | PAGE 7

BordeauxSt-Emilion

Arcachon

Biarritz

Le Cap Ferret

Espagne

Margaux

Matmut ATLANTIQUE

Page 8: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

The landscaping for the site and its surroundings was entrusted to Michel Desvigne, the French landscape artist having received the city planning Grand Prize in 2011. Here is what he has to say about his work :

“The stadium’s installation is nourished by a particular location: that of an area connected on the one hand to a high quality natural setting to be enhanced to the north, and to an urban landscaped framework to be reinforced to the south. The planning tied to the Stadium’s arrival marks an essential step in the realization of the wooded corridor of the North Rocade Sector provided for in the City Planning Charter of the City of Bordeaux with the forested strips which define an overall structure and organize the various spaces: the parvis, the parking and the ecological corridor. Additionally, natural bosques define the successive horizon lines and visual planes that combine or appear. The west parvis is the keystone to this landscape. The trees are inserted into large bands of natural lawn in turn held in mineral soil. Their east-west disposition preserves clear views of the Stadium and guarantees adequate qualities for intensive public use. Put into perspective, the whole constitutes a landscape in its own right.”

Located between the more than 30 hectare Floral Park and the 50 hectare Bordeaux woods, the site of the Matmut Atlantique is perfectly integrated into its environment.

The west parvis, with a surface area of 4 hectares, will host an events village with food services and activities on the nights of events.

DID YOU KNOW ?A sustainable approach

The stadium was conceived to limit its consumption thanks to a good insulation and a heating system for the interior spaces allowing to distribute evenly the temperature from one room to the other. Rain water is collected from the roof to water the lawn, insuring quasi self-sufficiency. 700 m² of solar panels are placed on the north stand’s roof. The stadium is self-sufficient in energy when in “stand-by” mode, that is to say when not hosting a major event.

LANDSCAPING APPROACH

A successful environmental integration

TO BE NOTED:

| |PRESS FILE | SEPT 2015 | PAGE 8Matmut ATLANTIQUE

Page 9: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

��

Must we still present the Girondins de Bordeaux? The leading club of Gironde, Aquitaine and the south-west of France has one of the greatest records in French soccer with six French Champion titles, four French Cups, three League Cups, one UEFA Cup final and two Champion’s League semi-finals. The “Navy Blue and White” will play all of their League 1 matches (19) on their new field as well as the League Cup and French Cup games, without forgetting their European encounters.

The New Stadium represents an important stake for the club. It will thereby dispose of modern sporting equipment meeting current international standards for showcase soccer. These new infrastructures will allow it to pursue its development and to host both spectators and club partners in the most optimal conditions.

The Union Bordeaux Bègles, Bordeaux’s professional rugby club will play at least three of its most important season’s matches at the Matmut Altantique.

Being the resident club, the Football Club des Girondins de Bordeaux will play all of its matches at the Matmut Atlantique. Additionally, it will dispose of a retail area called “La Galerie Girondins”. This 700 m² Concept store is unique within the professional soccer world in France.

DID YOU KNOW ?Opening of the Galerie Girondins May 23, 2015

This 700m² gallery located on the ground floor of the south façade of the Matmut Atlantique benefits from a daring concept and an innovative design expressing the off the wall and sporting spirit of the Girondins. It is made up of three boutiques, one “play” area, one lounge and many exclusive services: receptions, exhibits, fashion shows, open door events… Open weekdays and game nights, this space is to become an exceptional living space in the Matmut Atlantique throughout the year, including off season. The design and execution of this unique innovative and identity building space was given to a local team of interior architects and designers.

THE GIRONDINS DE BORDEAUX

Matmut Atlantique’s resident club

TO BE NOTED :

| DOSSIER DE PRESSE | SEPT 2015 | PAGE 9

The Matmut Atlantique’s financial partner thanks to its shareholder and owner M6, the Club is participating in the venue’s financing with an initial contribution of EUR 20 million and a yearly lease of EUR 3.85 million over 30 years.

The FG Gironding will hold its first match at the New Stadium on Saturday, May 23, 2015 on the closing day of the 2014-2015 League 1 Championship.

Matmut ATLANTIQUE

Page 10: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

More than a stadium: a new living space

Zoom on the Matmut Atlantique’s infrastructures for event organization...

THE PASSAGEWAY : bright and airy, this 800 m long space is laid out according to the organizers’ wishes. Ideal space for shows or exhibits. Capacity: 10,000 seats.

AUDITORIUM : located immediately near the locker rooms, this space is fully equipped with sound and video controls, a podium, and seats with folding tables positioned on a sloping floor insuring optimal visibility. It has a maximum capacity of 250 seats.

THE WEST SUITS : the most prestigious spaces in the Stadium, the West boxes welcome the official guests on game nights. With a surface area of 2,500 m² and 7 m wide terraces running along their length, they can be divided into three or four, according to your needs. Fully equipped, one box is able to host up to 310 guests. Located just above the players’ tunnel.

THE EAST BOXES : three modular boxes with a total surface area of 1,700 m² make up an airy space with an exceptional view onto the field. Located across from the players’ entrance.

�LODGES : For your meetings, luncheons or subcommittees, these spaces are designed to host 12 to 90 guests.

�SIDELINES : This space found at the level of the players’ bench is accessible and can become an event’s highlight with the possibility of organizing a cocktail.

�LOCKER ROOMS : Option of organizing a work meeting up to 50 people at the very heart of the locker rooms – ideal for team building.

The Matmut Atlantique has the required infrastructures to organize seminars, incentive meetings, tradeshows, symposiums, product launches or group lunches. Already, professional events outside match days have been successfully organized. Other have been programmed until the end of 2015.

•� � �9000�m2�of reception areas or4,400 guests

•� �60 lodges available or1,000 guests

• � ��6 boxes + specific decoration and adjoining terraces

•�Panoramic view of the field�

•�A 250 seat auditorium �•�A permanent 250 seat restaurants•�A Girondins 700 m² retail space2

•� �A close proximity parking with morethan 1,000 places reserved forcompanies

A complete digital format presentation brochure is available upon simple request

| |PRESS FILE | SEPT 2015 | PAGE 10Matmut ATLANTIQUE

Page 11: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

The stadium driving jobs

Committed to driving employment insertion programs, the New Bordeaux Stadium’s works received 3,500 journeymen and carried out more than 72,000 hours of professional insertion during its construction period. In the management phase, around 1,000 persons will work on site during major events. The arena is thereby guaranteeing the creation of 500 jobs when holding events. Recruiting sessions have already begun and are being orchestrated by the French agency for recruiting.

Completed in 42 months, including 16 months for preliminary studies and 26 months of work, the construction of the Matmut Atlantique was orchestrated around 8 key stages. The project was delivered according to the planned schedule and without any delays.

Clearing, depolluting, installation of the headquarters

Metallic framework for the roof

Parvis and access

Foundations

Finishing worksMetallic framework for stands and tiers

Large works

Sports equipment

• 63,000 hours of professional insertion• 3,500 journeymen worked on the site• 80% of the 120 companies having worked on the site have

their headquarters within a 200 km radius

A construction project done right

2.

DID YOU KNOW ?

During a year and a half, the New Stadium’s construction site had an on-site concrete production facility. Assuring flexibility and the reduction of the carbon footprint, the facility avoided the passage of 75 mixing trucks daily, thereby reducing bottlenecks on the big boulevards and the Bordeaux rocade. Working with the prefabrication zone at the north of the stadium, all of the 3,600 components used for the tiers were built in the Bordeaux-Lac area.

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 11

Page 12: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

Key construction figures AN INNOVATIVE MIX OF CONCRETE/METALAside from the uniqueness of its architectural aspect, the Matmut Atlantique is� made from a structure unprecedented in France which replaces the traditional and quasi exclusive use of concrete. The choosing of this process is not insignificant: it allows to considerably diminish the weight of the stadium thereby reducing the foundations and leading to a gain in time and costs. Metal, very present in the work, makes up the structure for the north and south stands, the backbone of the upper rim, the metallic roof framework and most of the lining: the underside of the bowl’s upper tiers, the cladding, the covering of the coil and all of the roofing’s cover. It’s the first time in France that a stadium has been realized with such a proportion of steel.

THE METAL FRAMEWORKThe work of Castel & Fromaget in the Gers, the framework is made up of two components: the lower stands and the north/south quarter bend, then the whole of the high stands and the roof. Only the lower east/west stands have a concrete structure (up until the 3rd level). Tests run in a wind tunnel at the Centre Scientifique et Technique du Bâtiment (Scientific and Technical Centre for Construction) permitted the analysis of the wind’s power against the structure and guaranteed a good ventilation without jeopardizing the spectator’s comfort (drafts). This framework represents 12,000 tons of metal that is to say, nearly twice the weight of the Eiffel Tower. It is made up of 644 circular steel posts up to 37 meters high and 40,000 m² of aluminum composite lining materials.

DID YOU KNOW ?A framework made in the South-WestThe 12,000 ton framework was entirely produced in France, on 12 manufacturing, galvanizing and painting sites. The vast majority of this production originates in the South-West since 80% of its manufacturing was done within a radius of less than 200 km around Bordeaux in response to a logic of circular economy favoring a short supply chain.

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 12

Page 13: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

Other key numbers…

THE ROOFThe arena’s roofing, with its cantilevered 44 meter roof, covers all of the spectators. Its 7° slope protects the spectators from the sun and inclement weather. It is composed of acoustic panels which allow for an ideal sound quality, whatever the nature of the event. Its installation necessitated the use of a crane unique in France (read opposite box). The roof’s lining was put in place 41 meters above ground thanks to a movable scaffolding positioned on the tiers of the upper rim allowing to install the roof’s lining all around the arena. For the second part of the roof, the extension above the tiers’ first rows, cherry pickers able to climb to 48 meters were positioned in the center of the playing field extending up to the height of the Boxes. The roof’s cover is partially made of metal sheets (for support), of insulation (to optimize its acoustic and thermal performance) and of membrane (for waterproofing reason). The front part of the roof in polycarbonate is translucent. The lining of the bowl’s underside is made of corrugated metal sheets that are perforated for acoustic reasons. In all, this multi layered membrane cover covers 25,000 m².

• 945 piles 22 meters deep for the foundations• 900 posts including 600 structural (to hold up the

building) and 300 decorative (running of cables)• 40,000 m² of aluminum composite panels to line the stadium• 3 km of railing around the stadium• 36 km of pipes to water and heat the pitch

• 42,115 seats for soccer (all sitting including 2,000 reserved forthe opponents’ supporters) – 41,212 seats for rugby (sitting) –44,683 seats for spectacles (sitting and standing)

• 14 general public access paths• 47 cm between each seat• 2 days to install the modular tiers around the playing field• iSlope of lower stand: 25°• iSlope of upper stand: 35°

DID YOU KNOW ?Installing the roof: a key moment in the constructionInstalling the roof was one of the most spectacular phases of the construction work. In order to bring it to term, a crane unique in France – reserved one year prior – arrived on the site. After 5 days of assembly, it performed its first lift on February 20, 2014, starting the roof’s installation over the western stand and moving clockwise. With a lift capacity of 600 tons, its assembly and installation required 50 semis. The operator cabin alone weighs 85 tons.

�� FOR CONSTRUCTION WORK

FOR NEW STADIUM

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 13

Page 14: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

High technology sound and lights

A 21st century stadium3.

When the intensity reading for all of the lighting is measured, an average of the measured points is calculated. In order to honor the established contract, there must not exist a difference of more than 30% between the strongest and weakest point in all of the stadium’s bowl. This criteria takes into account vertical lighting as well as horizontal lighting so as to avoid too great a shadow from the players on the game’s surface area. This measure is destined to insure the visual comfort of the players, spectators and viewers.

All in all, 308 points of measurement were read for the vertical lighting and 77 points for the horizontal lighting. These measurements are taken when the lines are drawn on the playing field.

The Matmut Atlantique is made up of 556 lamps broken down into 3 categories:

� �1.�The category corresponds to soft lamps, that is to say 284 waterproof lamps which light up traffic on the technical bridge as well the underside of the upper stands’ tiers.�

� �2.�The “arenavision” category of lamps, 216 in total, which allow to light upspecific areas on the playing field.

��

� �3.�The projector category, these are “powervision” lamps totaling 56 which lightup the entire crowd of spectators both on the upper and lower stands.

��

The management of the light flow between the soft lamps, arenavision and powervision allows for an extensive or intensive luminosity depending on the chosen anchor spots. A software created by PHILIPS is in charge of the calculations, perfectly regulating both the linearity and continuity of the whole system.

Very precise norms govern new generation stadiums for very high level sports. To face the constraints of televised retransmissions, the FIFA et the UEFA require a light output of 2,300 lux when put into service with a uniformity index of at least 70%.

DID YOU KNOW ?On big screen and HD WIFI

Furthermore, the stadium has two giant 70 m² screens situated under the roof and about 250 46” screens spread out in various reception areas. The Matmut Atlantique is the first connected stadium in France with HD WIFI. A relay antenna for 3G/4G and 450 terminals permit access.

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 14

Page 15: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

DID YOU KNOW ?

The length of the players’ entrance in the new arena is much different than that of Chaban which is a 120 meter long hallway. Today the players will only have to travel about ten meters in the New Stadium, thereby going from the longest entrance in Europe to the shortest.

A hybrid playing field

The arena has a “hybrid” lawn, that is to say semi synthetic and semi natural equipped with the AirFibr technology created by NATURALGRASS. What is truly synthetic is not the grass, which is completely natural, but the substrate on which it sits. It sits on a substrate sized XXL and 15 cm thick. Made up of fine silica sand presenting a compact surface, cork beads allowing the absorption of the athletes’ footholds and of synthetic fibers insuring a strong ground adherence. This new generation substrate considerably improves the athletic qualities of the players, the spectacles’ quality and further reduces the risk of injuries. There are in all 450 billion small synthetic fibers present in the substrate.

The process of bringing together all these components while seeding grass is novel in France. Increasing in this manner the resistance and rooting of the grass, this technique is ideal for a new generation multifunctional arena. Seeded 6 months before the first game of the Football Club des Girondins de Bordeaux, the playing field presented during its first match a root system 20 cm deep. Just like the New Stadium, the arena is equipped with a playing field compatible with all types of event.

In the soccer and rugby jargon, one often uses the famous phrases “green carpet” or “like a true pool table” to symbolize the pitch. The playing field is a key element of the Matmut Atlantique made of a “new generation” playing surface.

15  cm  

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 15

Page 16: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

The Société Stade Bordeaux Atlantique (SBA) holds a 30 year partnership contract, starting from date of delivery, for the design, financing, construction, management and maintenance of the New Bordeaux Stadium. SBA, a joint subsidiary of VINCI Concessions and FAYAT SAS, insures the management of this multifunctional structure designed to host sports, cultural, musical or corporate events.

VINCI is a global actor in franchising and construction, employing 185,000 collaborators in a hundred countries (€39 billion in revenues in 2014).Major actor amongst European stadiums, it has put forth, at the service of the Matmut Atlantique, all of the expertise of its integrated design, finance, construction and management model via its subsidiaries VINCI Construction, VINCI Concessions, VINCI Energies and Eurovia. The Group has notably built and manages the Stade de France and the MMArena in Mans. Vinci also built the Océane Stadium in the Havre, Nungesser 2 in Valenciennes and is finishing construction on the Arena 92 in Nanterre. Within the context of the Euro UEFA 2016, VINCI realized the Allianz Riviera in Nice, the Matmut Atlantique and is finalizing the Stade des Lumières in Lyon. VINCI Concessions created its subsidiary VINCI Stadium, specialized in stadium management, in order to optimize their stadium management model and thereby bringing them to economic maturity. VINCI Stadium is today the first European stadium management network with the Stade de France, the MMArena in Mans, the Allianz Riviera in Nice, the New Bordeaux Stadium and the old Olympic stadium in London.

�First Independent Construction Group in France, FAYAT is a major actor in construction and manufacturing. FAYAT has been present for over 50 years in 6 major sectors and has nearly €3.5 billion in revenues.Its 19,500 collaborators, in more than 100 independent subsidiaries across 120 countries, participate daily in its growth.Since its creation in 1957, FAYAT has continued its development. Diversification, external and organic growth have punctuated the path to success guided by a taste for entrepreneurship.Beyond fads, FAYAT has built itself on three strong core values: boldness, confidence and commitment. FAYAT has placed all of its competencies at the service of the New Stadium through its subsidiaries like SEG-FAYAT, FAYAT TP and CASTEL & FROMAGET which is responsible for all of the stadium’s metallic structure representing more than 85% of the building.

The actors

SHAREHOLDER OFFICIAL PARTNERS OFFICIAL SUPPLIERS

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 16

Page 17: PRESS FILE - Matmut ATLANTIQUE · earned it the qualifier of “English style” stadium. This term brings to mind a visual comfort for all the spectators, a close proximity to the

Rue Micheline Ostermeyer

Aliénor d'Aquitaine

Alfred Daney

Rocade Nord

Avenue Du Port Du Roy

Avenue Jean Jaures

Avenue De La JallereA

llée

Lou

is R

atab

ou

Crs Charles Bricaud

Rue

Du

Ver

gne

Allee D

u Bois

Boul

evar

d Al

iéno

r D'a

quit

aine

Avenue Du Lac

Cours Jules Ladoumegue

Avenue Des Trois Cardinaux

Rue D

u ProfesseurR

ené Cruchet

Avenue Perier

Rue Andre Messager

Rue

Du

Pont

Neu

f

Rue Du DocteurGabriel Péri

Bois de BordeauxParc Floral

Echangeur Du Jonc

Vers Mérignac aéroport

Vers ParisPont d’Aquitaine

Avenue de Pernon

Bordeaux Lac nord

4A

4B4C

Des

ign

Fran

ck T

allo

n

Les Aubiers

Quarante Journaux

Berges du Lac

Palais des Congrès

Parc desExpositions

parc des expositions P

P2

P1

secteur A B C

Vélodrome

En voiture sortie bordeaux lac/parc des expositions direction bordeaux lac sortie rocade 4, 4a ou 4b

En tramligne C, arrêt «Parc des expositions»

En busdepuis l’arrêt «Les Aubiers» liane 7, liane 32

En trainarrivée gare Saint-Jean puis tram c jusqu’à l’arrêt «Parc des expositions»

En avionaéroport international de Bordeaux-Mérignac à 15 kms du nouveau stadeVIP

PRESS CONTACT :Céline Cluzel

Communication & Marketing Manager

[email protected]

OTHER INFORMATION ON THE NEW BORDEAUX STADIUM : site�officiel�www.matmut-atlantique.com

MEDIA ACCESS

PHOTOS AVAILABLE UPON REQUEST (PHOTO GALLERY AVAILABLE ON THE INTERNET SITE)

CONTACTS & USEFUL INFORMATION

– 14 Bordeaux Métropole– Charte graphique– Mars 2015

Le logoplan BORDEAUX MÉTROPOLE

La boîte à outils

Usages et restrictions du logoplan BORDEAUX MÉTROPOLEVersions en quadrichromie

Matmut ATLANTIQUE | |PRESS FILE | SEPT 2015 | PAGE 17