SEISMIC ISOLATION OF PIERS AND WHARVES USING LEAD-RUBBER BEARINGS Bob Harn Senior Project Manager | Jeff Kilborn Project Manager PREVENTION FIRST 2012 October 24, 2012

Upload: others

Post on 01-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

SEISMIC ISOLATION OF PIERS AND WHARVES USING LEAD-RUBBER BEARINGSBob Harn – Senior Project Manager | Jeff Kilborn – Project Manager

PREVENTION FIRST 2012October 24, 2012

Page 2: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Presentation Overview

• Principles of seismic isolation

• Principles of lead-rubber bearings (LRBs)

• Applications

• MOT case study

• Broadway Pier retrofit

Page 3: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Behavior with and without Seismic Isolation

Without Isolation With Isolation

Foundation

Structure

Isolators

Page 4: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Characteristics of a Seismic Isolation System

• Added flexibility increases period of vibration and reduces force response

• Energy dissipation (damping) controls forces and displacements

• Rigidity under service demands

Page 5: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Lead Rubber Bearing (LRB)

Lead Core provides initial stiffness with high damping when yielded

Internal Plate

Laminated Rubber provides flexibility and re-centers bearing after earthquake

Rubber Cover

Flange Plate

Page 6: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Requirements of Marine Seismic Isolation System

• Every element tested

• Resist desired earthquake undamaged

• Saltwater resistant

Lead-Rubber Bearing

Page 7: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

LRB Dolphin

• Batter piles are stiff and strong for service loads

• LRBs add flexibility and damping system• LRBs capacity protect the batter piles

Example Pushover Plot Damping vs. Displacement Plot

Page 8: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Uses of LRB Dolphins“Seismic Isolation” and “Drift Control”

Bas

e Sh

ear

Period

Drift Control

Seismic Isolation

Page 9: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Applications of LRB dolphins

• Retrofit of existing piers• Seismic isolation reduces base shear, protects assets

• Construction below deck

• Minimize need for new piles

• Deep water piers• Drift control reduces displacements, protects assets

• LRB dolphins strengthen pier for non-seismic demands

• Reduces number and size of required plumb piles

Page 10: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Previous Applications of Seismic Isolation to Piers

POLA Berth 136 Extension (1994)Sliding Friction Dampers

Puerto de Coronel Chile (2008)

LRB

Page 11: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Use of Seismic Isolation on Piers by BergerABAM

• Retrofit of Broadway Pier – San Diego, CA (2009)• Deep water pier (2011)• Deep water pier with large industrial building (2011)

105’

110’

Page 12: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

MOT Case Study

• Earthquake - MOTEMS POLA CLE• No liquefaction• Target displacement 10 inches

85’

Section

Concrete deck

Pipe piles

60’ x 100’ unloading platform (ULP)

MOT Plan

Page 13: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Solution Using 54” Diameter Plumb Piles

54” x 2” wall pipe piles

• Mass = 4700 kips• Displacement = 10 inches• V= 2100 kips• Damping 8%• Steel weight in piles = 2,000,000 lbs• Approx. Cost = $4 million

Section

4’-6” thick deck

Pile Plan

Page 14: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Solution Using 36” Piles and LRBs for Drift Control

36” x 0.75” pipe piles plumb and battered (28 total)

• Mass = 3100 kips• Displacement = 9.5 inches• V=1170 kips• 19% damping• Steel weight in piles = 1,100,000 lbs• Approx. Cost = $2.8 million36” thick deck

LRBs

Section

Pile Plan

Page 15: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

MOT Unloading Platform Case Study Summary

• 54” diameter piles• Thick heavy deck required to fix piles• Less damping – higher force

• $ 4.0 million for unloading platform

• LRBs with 36” diameter piles• Thinner deck – less mass• More damping – less force

• $2.8 million for unloading platform

Page 16: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Broadway Pier Seismic Upgrade – San Diego, CA

• Owner - San Diego Unified Port District

• Part of larger Broadway Pavilion project

• Completed in late 2010

• Project Team• BergerABAM• Bermello/Ajamil Partners Inc. • Moffatt&Nichol-Blaylock

Page 17: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Broadway Pier Project Overview

• Client wants new building on an aging pier• Pier had seismic deficiencies – did not meet CBC• No permit for new piles• Project completion date fixed• Limited budget

1025’Bulkhead

Plan of Broadway Pier

Proposed Building

Page 18: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Seismic Deficiencies

Beach deposits (liquefiable)

• Brittle batter pile connections both directions• Insufficient ductility in plumb piles

Section Through Pier

Page 19: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Solution

New Pavilion Building

New seismic isolation bearings on new pile caps supported on the existing piles

• All work done under pier

• No building impact

• Cost $3 million

Page 20: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Construction Step 1

• Install falsework• Remove pile cover• Install stage 1 pile cap

• Install falsework• Remove pile cover• Install stage 1 pile cap

Page 21: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Construction – Step 2

• Install pipe shoring• Cut-off existing piles• Anchor reinforcement

• Install pipe shoring• Cut-off existing piles• Anchor reinforcement

Page 22: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Construction – Step 3

• Complete stage 2 pile cap• Install LRBs• Complete grouting, remove

shores and falsework

• Complete stage 2 pile cap• Install LRBs• Complete grouting, remove

shores and falsework

Page 23: Prevention First 2012 (10-22-12) · 2018-09-24 · Presentation Overview ... • MOT case study • Broadway Pier retrofit . Behavior with and without Seismic Isolation Without Isolation

Summary - Applications of Seismic Isolation

• Deep water Piers• Drift control of plumb pile structures

• Reduce base shear to protect assets (buildings, equipment & utilities)

• Retrofit of existing piers• Seismic isolation

• Reduce base shear to protect assets

• Minimize impacts on operations

• Minimize number of new piles

• Questions?