Page 1: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

PRESENTATION

NUCLEAR POWER ENGINEERING

Page 2: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

EXAMPLES OF DELIVERIES TO

Page 3: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

fuel handling

Scope of deliveries:

reconstruction and modernization of control system

FUEL HANDLING MACHINE

Page 4: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

cutting of used and irradiated instrumentations (sensors)

Scope of deliveries:

hydraulic shears

control system modification

CUTTING MECHANISM OF IK CONTAINER

Page 5: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

Cutting of used in-core neutron flux sensors

Scope of deliveries:

complete deliveries of equipments

The unit falls into safety category BT-3 according No.132/2008 Sb.

CUTTING MECHANISM OF SENSORS KNI

Page 6: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

reduction of volume of contaminated waste filled in drums

Scope of deliveries:

electrical equipment of presses

HYDRAULIC PRESSES

Page 7: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

control switchboards of manipulators of tubes inspection and repairing into steam generator

Scope of deliveries:

control switchboards

CONTROL SWITCHBOARDS AND PANELS

Page 8: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

test stands for the checking of safety valves end fixture of the primary circuit NPPs

Scope of deliveries:

control system exchange

new PLC Siemens Simatic S7

new HMI Siemens WinCC

SAFETY VALVES TEST STANDS

Page 9: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

Devices for measuring rods (clusters) friction forces

Scope of deliveries:

final supply of devices

MEASURING DEVICES FOR INSPECTION OF CONTROL RODS

Page 10: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

hot cells for research reactor RJH

Scope of deliveries:

development a design of electrical equipment

development of 3D model of hot cells

design of control system

HOT CELLS FOR RJH PROJECT

Page 11: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

Purpose of equipment:

seismically qualified terminal boxes

Scope of deliveries:

development and production of seismically resistant terminal boxes according to IEC 980:1993 and IEC 60780: 2001 with IP 65

HOT CELLS FOR RJH PROJECT

Page 12: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

HOT CELLS FOR RJH PROJECT

Purpose of equipment:

seismically qualified switchboards

Scope of deliveries:

development and production of seismically resistant switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65

Page 13: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

SUSEN PROJECT PRIMARY FIRST WALL TECHNOLOGY

Purpose of equipment:

testing of components (modules) of the first wall to high heat flux cyclic loading of plasma-facing components of the thermonuclear reactors

Scope of deliveries:

diagnostic and control system

Page 14: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

MEMBER OF ATOMEX GROUP

DEL a.s. is a member of Czech association ATOMEX GROUP (www.atomex.cz)

Common project:

Atomex4Energy

Page 15: PREZENTACE - DEL a.s.en.del.cz/sites/DEL.cz/repository/2018_PREZENTACE... · switchboards according to IEC 980:1993 and IEC 60780:2001 with IP 65 . SUSEN PROJECT PRIMARY FIRST WALL

THANK YOU FOR YOUR ATTENTION

DEL a.s. Strojírenská 2270/38

591 01 Žďár nad Sázavou Czech Republic