ISS INTERNATIONAL SpA PROCESS & PRUDUCTION ENGINEERING SERVICES
Il pr
esen
te d
ocum
ento
è p
ropr
ietà
del
la IS
S In
tern
atio
nal S
pA e
non
può
ess
ere,
tota
lmen
te o
par
zial
men
te, d
iretta
men
te o
indi
retta
men
te, t
rasf
erito
, rip
rodo
tto, c
opia
to, r
ivel
ato
o us
ato,
sen
za l’
auto
rizza
zion
e de
lla IS
S In
tern
atio
nal S
pA.
The
pres
ent d
ocum
ent i
s pr
oper
ty o
f IS
S In
tern
atio
nal S
pA a
nd s
hall
not b
e to
tally
or p
artia
lly, d
irect
ly o
r ind
irect
ly, t
rans
ferr
ed, r
epro
duce
d, c
opie
d, d
iscl
osed
or u
sed,
with
out t
he a
utho
rizat
ion
of IS
S In
tern
atio
nal S
pA.
Process & Production EngineeringProcess & Production Engineering CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Process Services
Tecnomare SpA
Italy 2010 14 months World Wide Services
• Instrument tollerance control activities on production phase.
Saipem SpA
Italy / Algeria 2010 8 months
Sonatrach Menzel Ledjmet East Project (MLE) Oil&Gas Treatment Plant & Pipeline
• Plant Operating Manual
CEMIT Srl / ENI E&P
Italy 2010 8 months Val D’Agri Oil & Gas Treatment Plant
• Development of Process Engineering in a EPC contract
CEMIT Srl / ENI E&P
Italy 2010 8 months Val D’Agri Oil & Gas Treatment Plant
• Plant Operating Manual
Edison SpA
Greece 2009 / 2010 6 months Thisvi Combined Cycle Power Plant • Plant Operating Manual
ENIPower
Italy 2009/2010 6 months
Combined Cycle Power Plant
• Development of Standard Operating Procedure
Veco Engineering
Algery 2009 6 months
Water Pumping Station • Plant Operating Manual
Qcon
Qatar 2009 6 months VOC Plant • Plant Operating Manual
Snamprogetti
Italy 2008/2009 2 months
Hydrogen Unit (Ras Laffan)
• Support Services for Process Design
ISS INTERNATIONAL SpA PROCESS & PRUDUCTION ENGINEERING SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Process Services
Technip SpA
Polland 2008/2009 12 months HDS Plant
• Development of Precommissioning and Commissioning Manual / Procedures
Saipem Spa
Italy 2008/2009 6 month Gas Compression Station – Wafa Libya
• Process Activities in Saipem Team
Technip SpA
Polland 2008/2009 3 months HDS Plant • Development of Plant Cure &
Custody Management Procedures
Comart SpA Italy 2008/2009 3 month Gas Dehydration Plant – Ras Laffan - Qatar
• Plant Operating Manual
Saipem Spa
Italy 2008/2009 6 month Booster station – Wafa Libya • Process Activities in Saipem Team
Comart SpA Italy 2008/2009 3 month Gas Sweetening Plant – Ras Laffan - Qatar
• Plant Operating Manual
Saipem Spa
Italy 2008/2009 6 month Gathering System – Wafa Libya • Process Activities in Saipem Team
Saipem Energy Servicies Spa
Italy 2008/2009 6 month Gas Compression Station – STGP Plant Tunisia
• Process Activities in Saipem Team
Technip SpA
Italy 2008 10 month Gas Compression Station – El Arish Egypt
• Development of Precommissioning and Commissioning Manual / Procedures
Tecnomare SpA
Italy 2008 6 month “Centro Olio Ragusa Oil”Treatment Plant
• Development of Operating Manuals and Procedures
ISS INTERNATIONAL SpA PROCESS & PRUDUCTION ENGINEERING SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Process Services
Tecnomare SpA
Italy 2008 6 month “Nuovo Centro Olio Gela” Treatment Plant
• Development of Operating Manuals and Procedures
Tecnomare SpA
Italy 2008 6 month “Terzo Centro Olio Gela” Treatment Plant
• Development of Operating Manuals and Procedures
Comart SpA Italy 2008 3 month
Fuel Gas Treatment Packaget – MEPI, MOQ, Sime Darby - UAE
• Plant Operating Manual
Comart SpA Italy 2008 3 month Fuel Gas Treatment Packaget – MOQ, - UAE
• Control Philosophy
Comart SpA Italy 2008 3 month Gas Sweetning Plant – MOQ - UAE • Plant Operating Manual
Technip SpA
Italy 2007/2008 10 month Hydrogen Unit Croatia
• Development of Precommissioning and Commissioning Manual / Procedures
Tecnomare SpA
Italy 2008 6 month “Perla Platform” Gela
• Development of Operating Manuals and Procedures
Tecnomare SpA
Italy 2008 6 month “Gela 1 Platform” Gela
• Development of Operating Manuals and Procedures
Tecnomare SpA
Italy 2008 6 month “Prezioso Platform” Gela
• Development of Operating Manuals and Procedures
Technip KTI SpA
Chile 2008 6 month Topping Column Simulation – Concon Chile
• Simulation Study
ISS INTERNATIONAL SpA PROCESS & PRUDUCTION ENGINEERING SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Process Services
Technip KTI SpA
Chile 2008 6 month Vacuum Column Simulation – Concon Chile
• De-bottlenecking Study
JGC
Qatar 2007/2008 18 month Oil Treatment Plant – Dolphin Qatar
• Development of Operating Manuals and Procedures
Guascor Italia Spa
Italy 2006/2007 12 month Recovery Oil Plant • Development of Precommissioning
/ Commissioning Start up Manual and Procedures
Technip KTI SpA
Congo 2006 10 month HDS Plant • Development of Precommissioning
and Commissioning Manual / Procedures