product end-of-life disassembly instructionsh22235. · 2016-12-23 · product end-of-life...
TRANSCRIPT
EL-MF877-00 Page 1 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions Product Category: Personal Computers
Marketing Name / Model [List multiple models if applicable.] HP ENVY 34 Curved All-in-One PC Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE). 1.0 Items Requiring Selective Treatment 1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes Quantity of items included in product
Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA)
With a surface greater than 10 sq cm
2
Batteries All types including standard alkaline and lithium coin or button style batteries
2
Mercury-containing components For example, mercury in lamps, display backlights, scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm
Includes background illuminated displays with gas discharge lamps
1
Cathode Ray Tubes (CRT) 0 Capacitors / condensers (Containing PCB/PCT) 0 Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height
0
External electrical cables and cords 0 Gas Discharge Lamps 0 Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above)
0
Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent chambers, and service stations.
0
Components and waste containing asbestos 0 Components, parts and materials containing 0
EL-MF877-00 Page 2 Template Revision B
PSG instructions for this template are available at EL-MF877-01
refractory ceramic fibers Components, parts and materials containing radioactive substances
0
2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description Tool Size (if
applicable) Electric screwdriver (#1) #1, Cross Electric screwdriver (#2) #2, Cross
Electric screwdriver (Hexagon Head) Hexagon Head
Electric screwdriver (T20,Torx Pin-Head) T20,Torx Pin-Head
Description #5 3.0 Product Disassembly Process 3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw. 4. 5. 6. 7. 8. 9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY
MODEL : Schumi34
1.00
Station Version Station Version Station Version Station Version Station Version Station Version
1 1.00 9 1.00 17 1.00
2 1.00 10 1.00 18 1.00
3 1.00 11 1.00 19 1.00
4 1.00 12 1.00 20 1.00
5 1.00 13 1.00 21 1.00
6 1.00 14 1.00 22 1.00
7 1.00 15 1.00 23 1.00
8 1.00 16 1.00
Station Ver.
ALL 1.**
Sub-assembly name: Schumi34 DISASS'Y SOP
Document No.: Schumi34 DISASS'Y SOP
Page:
Design
Revision:Written by: Ethan Lai
1 of 1
Date Content
Date:
Ya-dong YangFirst version2016/11/17
A.Current station version list:
B.Version Modify list:
2016/11/17
Auditor : Xin-Xin Chen Tabulator: Ethan Lai
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Machine handling notice
1. Do not press the top side and both sides of
panel active area hard when handling
machine (Fig. 1, 2).
2. Do not press the panel active area during
handling (Fig. 3).
3. Hold the bottom side of panel from the back
with both hands carefully (Fig. 4, 5).
Fig. 1
Fig. 2
1(1/2)
2016/11/17 1.00
Fig. 3
Press the panel active
area is forbidden
Fig. 4
Fig. 5
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Stand Bottom Cover
1. Put the machine on the working table (Fig. 1).
Place the machine as illustrated.
2. First unscrew (Cross × 7) 7 screws (Fig. 2),
then unscrew (Cross × 8) 8 screws (Fig. 2, 3).
Take the screwdriver vertically to the screw
holes.
3. Take out Stand Bottom Cover from the top
side.
Fig. 1
Fig. 2
1(2/2)
2016/11/17 1.00
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Working Table 1
Fig. 3
4 7
1
5
2 3 6
8
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out FAN
2(1/1)
2016/11/17 1.00
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Bits Type: Hexagon Head 1
Torque Wrench 1
1. First disconnect the FAN cable, then unscrew
(Cross × 3) all joints to take out FAN (Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Take out Hinge Stand screw (Fig. 2).
Press the screwdriver hard to the screw hole
to avoid stripping the screw.
Fig. 1
1
3
2
1
Fig. 2
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out SSD, WLAN card and cables
1
3(1/1)
2016/11/17 1.00
Electric Screwdriver (S-6000MS) 1
Bits Type: #1,Cross 1
1. If machine is equipped with SSD, then
unscrew (Cross × 1) one screw to take out
SSD (Fig. 1).
2. First disconnect WLAN antennas, then
unscrew (Cross × 1) one screw to take out
WLAN card (Fig. 2).
3. Disconnect all the cables from the following
connectors on M/B (Fig. 3, 4).
Connectors: Scalar-1, Scalar-2, Scalar-3,
HDD.
Fig. 1
Fig. 2
Fig. 4
Fig. 3
1
1
2
Scalar-2
Scalar-3
Scalar-1
HDD Cable
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
4(1/1)
2016/11/17 1.00 Take out Base Module
Fig. 1
1. Take out Base Module slowly upwards from
the opposite direction of panel, and at the
same time thread slowly the cables through
the bracket hole (Fig. 1).
Thread Scalar-cables
through the bracket
hole
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out HDD
5(1/1)
2016/11/17 1.00
1. First unscrew (× 4) the joints, then slide
upwards HDD ASS’Y to take out (Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Unscrew (× 4) the joints to take out HDD
bracket (Fig. 2).
Take the screwdriver vertically to the screw
holes.
3. First unscrew (× 2) the joints of HDD cable,
then separate HDD cable and HDD (Fig. 3).
Take the screwdriver vertically to the screw
holes.
Fig. 1
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Fig. 2
Fig. 3
1
2
3
4
Screw * 2
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Thermal Module & GPU board
6(1/1)
2016/11/17 1.00
1. Unscrew nine screws (× 9) to take out
Thermal Module with GPU part, then take out
GPU board (Fig. 1, 3); unscrew five screws
(× 5) to take out Thermal Module w/o GPU
part (Fig. 2, 3).
Take the screwdriver vertically to the screw
holes.
Unscrew the screw #1 half, then unscrew the
others, and finally unscrew the #1 to prevent
deformation of Thermal Module.
Fig. 1
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Fig. 2
1 2
3
1 2
3 4
1 2
3
4
1
Fig. 3
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Speaker mesh and screws
1
Fig. 3
7(1/1)
2016/11/17 1.00
1. Press the both sides of Speaker mesh to
separate the hooks and Stand Cover Top,
then take out Speaker mesh in the direction
from the both sides to the middle (Fig. 1).
2. Turn over Stand Cover Top, then unscrew
(Cross × 8) all joints (Fig. 2, 3).
Take the screwdriver vertically to the screw
holes.
Fig. 1
Fig. 2
7
8 6 2 3
4 5 1
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Working Table 1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Speaker
Fig. 3
8(1/1)
2016/11/17 1.00
1. Turn over Base Module, and need to press
Speaker to avoid its dropping.
2. Disconnect Speaker cable on M/B, then take
out Speaker (Fig. 3).
Be careful not to damage the tympanum of
Speaker.
Be careful not to collide the components of
M/B.
Fig. 1
Fig. 2 Do not touch the
tympanum
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out M/B & Power board
9(1/1)
2016/11/17 1.00
1. Take out Power board and Power/B cable
(Fig. 1).
2. Take out Dongle Module, then pull out its
cable (Fig. 2).
3. Unscrew (Cross × 5) all joints to take out M/B,
then disconnect Dongle cable on M/B (Fig. 3).
Take out M/B obliquely upwards from the
opposite direction of the connector side of
the cover.
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Fig. 3
Fig. 1
Dongle
CNTR
Dongle
Module
CNTR is on the
underside of M/B
Sponge
Sponge (Set
material)
5 1
4
2
3
Fig. 2
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Collect CPU, DDR and M/B
10(1/1)
2016/11/17 1.00
1. Take out and collect CPU.
Open the bracket by pulling off the link and
take out CPU.
2. Take out and collect DDR.
Expand the springs on the both sides of the
DDR socket.
3. Collect M/B.
Working Table 1
Socket 1
Socket 2
Remove CPU Open CPU bracket Check PIN is slanted or
not. If it’s slanted, it’s
NG
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Hinge Stand Bottom
11(1/1)
2016/11/17 1.00
1. Put Stand Cover Top on the working table,
then unscrew (× 6) all joints of Hinge Stand
Bottom (Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Take out Hinge Stand Bottom.
Fig. 1
1
6
2
5 4
3
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Volume Dial/B
12(1/1)
2016/11/17 1.00
1. Unscrew (× 4) all joints of Volume Dial
Shielding (Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Tear off the acetate tape of Volume Dial/B
cable, then take out Volume Dial/B and its
cable (Fig. 2).
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Fig. 1
Fig. 2
1 2
4
3
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Hinge Stand
13(1/1)
2016/11/17 1.00
1. Put Panel Module on the working table.
2. Take out STAND ARM_REAR COVER.
3. Unscrew the hexagonal screw.
Take the screwdriver vertically to the screw
holes.
4. Unscrew the joint of STAND ARM_FRONT
COVER.
Take the screwdriver vertically to the screw
holes.
5. Thread cables through Hinge Stand, then
take out Hinge Stand.
Electric Screwdriver (S-6000MS) 1
Bits Type: #1,Cross 1
Bits Type: Hexagon Head 1
Torque Wrench 1
Slide downward
the Cover
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
14(1/1)
Take out Rear Cover 1.00 2016/11/17
Plastic Stick 1
1. Press the region of webcam to pull open
Rear Cover.
2. Use the stick to pull open the region of
webcam for lever force to unfix the hooks
between the Rear Cover and Middle Cover.
3. First hold the region of webcam, then insert
fingers inside to upwards pull open the inner
hooks to take out Rear Cover.
When pull out cables from Rear Cover, be
careful not to scrape Rear Cover.
2 2
3 2 3
4 4
5
1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Scalar Shielding and cables
15(1/1)
2016/11/17 1.00
1. Unscrew (Cross× 8) all joints to take out
Scalar Shielding (Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Pull out Scalar-1, Scalar-2, Scalar-3 cables
and WLAN antennas along the hooks.
Fig. 1
Fig. 2
3
1
4
2
5 8
7 6
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Disconnect cables
16(1/1)
2016/11/17 1.00
1. Pull out e-DP cable and Backlight cable
illustrated as figures (Fig. 1, 2).
2. Disconnect all the cables on Scalar board as
below (Fig. 2).
Cables: CCD, MIC and Holder Sensor.
Fig. 1
Fig. 2
e-DP
BACKLIGHT-
QHD+LG
MIC & CCD &
Sensor cables
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out CCD Module
17(1/1)
2016/11/17 1.00
1. Take out Springs (× 2) (Fig. 1).
2. Unscrew (× 4) all joints to take out CCD
bracket (Fig. 2).
Take the screwdriver vertically to the screw
holes.
3. Take out CCD Module, then unscrew (× 3) all
joints to take out bracket (Fig. 3).
Take the screwdriver vertically to the screw
holes.
4. Take out CCD and pull out CCD cables (Fig.
4).
Tear off CCD slowly to avoid breaking CCD.
5. Tear off webcam Windoor PMMA (Fig. 5).
Fig. 1
Fig. 2
Fig. 3
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Bits Type: T20,Torx Pin-Head 1
1
BASE_PAN_R,
BASE_PAN_L
2
3 4
1 2
3
Fig. 4
Fig. 5
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Base Pan
18(1/1)
2016/7/12 1.00
1. Unscrew (× 1) to take out Reduction Gear
(Fig. 1).
Take the screwdriver vertically to the screw
holes.
2. Take out Door Lock (Fig. 1).
3. Take out Holder Sensor Cable (Fig. 2).
Need to pry open the hook obliquely to take
out Holder Sensor Cable.
4. Unscrew (× 7) to take out Base Pan (Fig. 3).
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Bits Type: #1,Cross 1
Fig. 1
Fig. 2
Fig. 3
Door
Lock
Damper
Holder Sensor
2
BASE PAN
3
4 5
6
7
1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Take out Stand Bracket
19(1/1)
2016/11/17 1.00
1. Unscrew the screws (× 9) illustrated as Fig. 1.
Take the screwdriver vertically to the screw
holes.
2. Take out Stand Bracket, then put into box.
Fig. 1
9 8
5
2
4
1
3
7
6
STAND BRACKET
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
20(1/1)
2016/11/17 1.00
1. Unscrew the screws (× 11) illustrated as Fig.
1.
Take the screwdriver vertically to the screw
holes.
Unscrew Front Bezel
Fig. 1
1 8
2
5
6
9
3
4 11
10
7
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
21(1/1)
2016/11/17 1.00
1. Unscrew the screws (× 20) illustrated as Fig.
1.
Take the screwdriver vertically to the screw
holes.
Unscrew Front Bezel
Fig. 1
Electric Screwdriver (S-6000MS) 1
Bits Type: #2,Cross 1
1 2
3
4
7 8 9 10
6 5
3
2
4
1
6 5
7 8 9 10
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
22(1/1)
Take out Front Bezel 1.00 2016/11/17
Plastic Stick 1
1. Pull open slowly the bottom side of inner
hooks, then upwards pull up to take out Front
Bezel.
When pull out cables from Rear Cover, be
careful not to scrape Rear Cover.
Bottom side of hooks
Standard Operation Procedure
Tabulator: Issue Department: Xin-Xin Chen NPSU-PPE Auditor : Ethan Lai
Steps:
Document No. : Schumi34 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification) Qty. Fixture list (Specification) Qty.
Inspect Panel and put into box
23(1/1)
2016/11/17 1.00
1. Inspect to ensure Panel with no scratches,
bruises, ruptures and etc.
2. Good parts are put into the dedicated box.