product end-of-life disassembly instructionsh22235.€¦ · cross electrical screwdriver 3.0...
TRANSCRIPT
EL-MF877-00 Page 1 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions Product Category: Personal Computers
Marketing Name / Model [List multiple models if applicable.] HP Elite Slice G1
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment 1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes Quantity of items included in product
Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA)
With a surface greater than 10 sq cm
1
Batteries All types including standard alkaline and lithium coin or button style batteries
1
Mercury-containing components For example, mercury in lamps, display backlights, scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm
Includes background illuminated displays with gas discharge lamps
0
Cathode Ray Tubes (CRT) 0 Capacitors / condensers (Containing PCB/PCT) 0 Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height
0
External electrical cables and cords 0 Gas Discharge Lamps 0 Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above)
0
Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent chambers, and service stations.
0
Components and waste containing asbestos 0
EL-MF877-00 Page 2 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Components, parts and materials containing refractory ceramic fibers
0
Components, parts and materials containing radioactive substances
0
2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
Tool Description Tool Size (if applicable)
T15, T8 Electric Screwdriver Support fixture M/B B side support fixture Suction pen Cross electrical screwdriver 3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw. 4. Disconnect RTC battery cable and remove battery from M/B. 5. Dispose of all removed components according to regulation requirements. 6. 7. 8. 9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONSMECHANICAL ASSEMBLY
MODEL : Slice
auditor: Stanley Chen
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Loosen screw *4 of bottom case (Fig.1)
Torque:3.0 ± 0.2 Kgf.cm
2. Take off bottom case (6070B1043901) ,and put it in the box
Disassembly bottom case
1(1/1)0.10 2016/6/29
Fig. 1
3
1
2
4
Cross electrical screw driver #1 1
Fig. 2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Disassembly Speaker connector form MB
2. Disassembly Speaker module(6039B0082201) and put it in the box
Do not press the Speaker eardrum when disassembly the speaker .
Disassembly Speaker
2(1/1)0.10 2016/6/29
Speaker Connector
eardrum
Put the right side hook , and release the speaker .
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Disassembly HDD connector from MB(Fig. 2)
2. Loosen HDD bracket screw *4 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
Disassembly HDD
3(1/1)0.10 2016/6/29
Cross electrical screw driver #1 1
HDD connector
1
23
4
Fig.1
Fig.2 Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Take HDD and remove the HDD cable from the HDD . Put it in the box . (fig.1)
2. Loosen HDD bracket screw (6054B1636401)*4 from the both side of the HDD . (Fig.2)
Torque:2.5 ± 0.2 Kgf.cm
3. Put the HDD bracket and HDD in the different box .
Disassembly HDD
4(1/1)0.10 2016/6/29
1
3
4
2
Fig. 2
Fig.1
Cross electrical screw driver #1 1
HDD support fixture 1
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Loosen screw *4 of the middle frame (Fig. 1)
Torque:3.0 ± 0.2 Kgf.cm
2. Turn over the machine , and disassembly top case . (Fig.2)
3. Only for Touch model Disassembly cable (6017B0773101)
connector on touch/B , and disassembly the other side connector on M/B . Put the cable in the box . (Fig.3)
4. Only for charger model Disassembly cable connector on touch/B , and disassembly the other side connector on M/B . Put the cable in the box . (Fig.3)
Disassembly top cover
5(1/1)0.10 2016/6/29
Cross electrical screw driver #1 1
4
13
2
Fig.2
Fig. 1
Touch ,charger CNTR
Fig. 3
Fig.4
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
14
32
Thermal cover
1. Disassembly DDR from the M/B , and put it in the box .(Fig.1)
The numbers of DDR disassembly is base on it on the M/B .
2. Loosen thermal cover screw(6052B0156301) *4 (Fig.2)
Torque:2.0 ± 0.2 Kgf.cm
3 . Put top cover & thermal cover (6070B1042401) in the different box.
Disassembly DDR & thermal cover
6(1/1)0.10 2016/6/29
Cross electrical screw driver #1 1
Fig.2
Top cover
Fig.3
Fig.1
DDR
Fig.4
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Disassembly Fan cable connector on M/B (Fig. 2)
2. Loosen thermal screw *4 (Fig.1)
Torque : 2.5 ± 0.2 Kgf.cm
Disassembly thermal module
7(1/1)0.10 2016/6/29
Fig.1
Fig.2
1
3
4
2
FAN CNTR
T15 electrical screw driver 1
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Loosen FAN screw (6052B0262901)* 4 (Fig.1)
Torque:0.8 ± 0.2 Kgf.cm
2. Put thermal (6043B0209401/6043B0209411) & FAN module(6033B0048801/6033B0048802) in the different box .
Disassembly FAN
8(1/1)0.10 2016/6/29
Fig.1
1
23
4
Cross electrical screw driver #0 1
Thermal assembly fixture 1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Disassembly antenna plug *2 from WLAN card(Fig.1)2. Disassembly thermal sensor connector from M/B . (Fig.2) . Pick up sensor module from rubber (Fig.3) ,and put it in the box .3. Disassembly finger print FFC connector from M/B (Fig.4).
Disassembly antenna plug ,thermal sensor
9(1/1)0.10 2016/6/29
图一
Thermal sensor connector图二
图三
Support Rubber
F/G CNTR
图四
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
1. Disassembly antenna cover *2 on the middle frame , and put them in the box . (Fig.1 )
2. Loosen WLAN card screw (6052B0118301) *1 . (Fig.2)
Torque :2.0 ± 0.2 Kgf.cm3. Disassembly WLAN card , and put it in the box .
Only for M2 SSD model .1 . Loosen SSD screw (6052B0118301) *1 . (Fig.2)
Torque:2.0 ± 0.2 Kgf.cm2. Disassembly SSD card from M/B ,and put it in the box .
Disassembly WLAN card, SSD, antenna
10(1/1)0.10 2016/6/29
Fig.2
WLAN M2 SSD
Cross electrical screw driver#1 1
Aux antenna
Fig.1
Main antenna
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
ILM
11(1/1)
Disassembly CPU
M/B B side support fixture 1Suction pen 1
图一Press IML handle
Suction pen图二
图三
CPU box
IML box
1. Press the ILM handle, and take off the CPU cover .
2. Use the suction pen to pick up CPU on the CPU socket, and collect it in the CPU box .
3. Lock the ILM handle and assembly CPU IML cover
Cannot touch CPU pin with hand .
0.10 2016/6/29
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
12(1/1)
Disassembly MB
图一
Fig.2
1. Loosen MB screw(6052B0118301)*1
2. Disassembly MB from middle frame , and put it in the box .
Push the middle frame of audio side , and let audio jack been outside of the middle frame . (Fig.3) Take the M/B audio side out of the middle frame , and disassembly it .(Fig.3)
0.10 2016/6/29
Screw
Push middle frame with finger , and let audio jack been outside of the middle frame.
Fig.3
Cross electrical screwdriver#1 1
Fig.1
Fig.4
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
13(1/1)
Disassembly antenna
1. Disassembly main antenna cable (shorter one ,036B0177401 WNC /6036B0176101
INPAQ)(Fig.1)2. Disassembly AUX antenna cable (longer one6036B0177501 WNC /6036B0176001 INPAQ)
(Fig.2)3. Put these antenna in different box .
0.10 2016/6/29
Aux antenna
Main antenna
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor: Stanley Chen NPSU-PPE
14(1/1)
Disassembly Finger module
With Finger model 1. Loosen screw (6052B0118301)*1 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disassembly finger iron parts (6053B1309101), and put it in the box .(Fig.2)
3.Disassembly Finger module and FFC (6035B0158301), and put Finger &FFC in the different box (Fig.3)
Without finger model1. Loosen screw(6052B0118301)*1 (Fig.4)
Torque:2.5 ± 0.2 Kgf.cm
0.10 2016/6/29
Cross electrical screwdriver #0 1
Fig.1
Screw
Fig.3
finger iron parts Fig.2
Fig.4 Fig.5
MANUFACTURING PROCESS INSTRUCTIONSMECHANICAL ASSEMBLY
MODEL : Slice
Auditor: Stanley Chen
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor Stanley Chen NPSU-PPE
Disassembly Bottom case
1(1/1)
1. Loosen bottom case screw *4 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disassembly bottom case(6070B1044001), and put it in the box
Fig.1
1
24
3
Cross electrical screwdriver #1 1
0.10 2016/6/29
Fig. 2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor Stanley Chen NPSU-PPE
1. Disassembly left side Rubber (6054B1795001)*2 and right side Rubber (6054B1795101)*2 (Fig.1)
2. Loosen ODD support frame screw(6052B0049401) * 1 and right side iron parts screw (6052B0049401) *1 , and disassembly right side iron parts (6053B1308601) . (Fig.1)
Torque :2.5 ± 0.2 Kgf.cm
Disassembly rubber & screw
2(1/1)0.10 2016/6/29
Rubber
ODD support frame screw
Iron parts screw
Cross electrical screw driver #0 1
Fig. 2Fig. 1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor Stanley Chen NPSU-PPE
FFC CNTR
1. Disassembly ODD FFC from ODD/B (Fig.1)
2. Disassembly ODD toward downside (Fig.1)
Disassembly ODD
3(1/1)0.10 2016/6/29
Fig.1
Toward down side
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor Stanley Chen NPSU-PPE
1. Disassembly ODD FFC connector from ODD side , and put it(6017B0773501) in the box (Fig.1)
2. Loosen ODD support frame screw (6052B0228001)*2(Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
3. Put the frame in the box .
Disassembly ODD FFC & support frame
4(1/1)0.10 2016/6/29
Support frame
screw*2
ODD FFC connector
Cross electrical screw driver#1 1
Support fixture 1
Fig.1Fig. 2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.:Auditor Stanley Chen NPSU-PPE
1. Loosen ODD/B screw (6052B0049401)*1(Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disassembly ODD/B , and put it in the box.
3. Put bottom case in the box (6070B1043301)
Disassembly top cover
5(1/1)0.10 2016/6/29
Cross electrical screw driver #1 1
图一
Fig.1
screw
Fig. 2
MANUFACTURING PROCESS INSTRUCTIONSMECHANICAL ASSEMBLY
MODEL : Slice
Auditor: Stanley Chen
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
Disassembly bottom case
1(1/1)
1. Loosen bottom case screw * 4 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disasembly bottom case(6070B1043601) , and put it in the box .
Fig.1
Cross electrical screwdriver #1 1
0.10 2016/6/29
1
2
4
3
Fig. 2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
1. Disassembly Sponge 4 pcs . (Fic.1/Fic.2/Fic.3)
Disassembly Sponge
2(1/1)0.10 2016/6/29
Fig.1
Fig.2
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
1. Disassembly speaker connector and Audio /B FFC from ODD/B (Fig.1)
2. Loosen Speaker screw (6052B0362401)*2(Fig.2)
Torque:2.5 ± 0.2 Kgf.cm
3. Disassembly Speaker (6039B0082301), and put it in the box .
Disassembly Speaker
3(1/1)0.10 2016/6/29
Fig.1
3
4 2
1
Cross electrical screwdriver #1 1
Fig.2Fig. 3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
1. Disassembly Mic.-1 cable connector from audio/B , and disassembly it from the frame . (Fig.1)
2. Disassembly Mic.-2 cable connector from audio/B , and disassembly it from the frame . (Fig.2/Fig.3)
Disassembly Mic. -1 & Mic. -2 cable
4(1/1)0.10 2016/6/29
图一
图二
图三
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
1. Disassembly rubber from Mic.-1 cable .(Fig.1)2. Disassembly rubber from Mic.-2 cable .
(Fig.2)3. Put the Mic. -1 (6017B0773201)Cable and
Mic. -2 Cable (6017B0773401) in the different box .
4. Disassembly support rubber (6054B1792901)of the audio/B (Fig.2)
Fig.1
Rubber
Fig.1
Mic.-1
Mic.-2
disassembly Rubber
5(1/1)0.10 2016/6/29
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation ProcedureDocument No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Issue Dept.Auditor: Stanley Chen NPSU-PPE
1. Loosen screw *2 , and take the iron parts in the box . (Fig.1)
2. Loosen Audio/B screw(6052B0228001) * 2(Fig.2)
Torque:2.5 ± 0.2 Kgf.cm
3. Disassembly Audio/B (1310A2843201)
4. Put the Audio/B and top cover (6070B1043401) in the different box .
Disassembly iron parts & Audio/B
6(1/1)0.10 2016/6/29
Cross electrical screwdriver #1 1
Fig.2
12
Fig.1
Fig. 3