production demand mature blocks closeout, up to 4,4 gw power demand production

33
CCHBC Poland Demand Side Response

Upload: lance-gudgeon

Post on 01-Apr-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1

Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 PRODUCTION DEMAND Slide 9 Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION Slide 10 Demand Side Response (DSR): temporary reduction of energy consumption, implemented on demand, realized according to schedule agreed by Energy Consumer and Supplier Technology Supplier / VEMS Operator = VemsEcoFound DSR Integrator = WSEInfoEngine / Sparkhouse Slide 11 NotifyRespondRestore Slide 12 Slide 13 INDUSTRY BUSINESS PUBLIC INSTITUTIONS HOSPITALS SHOPPING MALLS AGGREGATOR: SPARKHOUSE/ INFOENGINE VEMS SYSTEM / DSR ENABLER PSE / OSD ENERGY WHOLESALE MARKET MW / STAND BY / MWh Slide 14 AUTOMATICMANUAL OR Slide 15 Automated power reduction aggregation in all managed entities through VEMS A GGREGATOR OPERATING ENERGY MANAGEMENT SYSTEM Slide 16 Operational platform for power reduction management in distributed entities = VEMS Enabler DSR Slide 17 Slide 18 Power demand in peak times relates to approx. 1% of the whole year period (50-70 hours) Need for DSR may reach from 500 MW to 4000 MW Current costs of extraordinary power supply for peaks reach 600- 800 mln PLN Slide 19 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL ?? Slide 20 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL 1,380 MWs (estimated) 5.0% (estimated) Slide 21 Slide 22 Slide 23 Slide 24 Virtual Energy Management System (VEMS) VEMS allows power use reduction during peak energy demand periods. Slide 25 Reduction up to 30% Rationalization of ventilation, heat and cooling management Slide 26 Daily profile changes technical handling Roster unit profile optimization for dealing unit Profiting from daily profile changes (price x quantity) Energy measurement management Slide 27 DSR deals Profiting from: DSR and daily profile changes Power reduction technical handling Slide 28 income costs Slide 29 1.New income source 2.Media costs reduction 3.No investment costs for Partner (*) (*) Possible exception in case of necessary measurement infrastructure adjustement or repair Slide 30 Slide 31 Slide 32 VEMS ON Slide 33 https://www.facebook.com/Virtual2Power