SQAM Course, Proficience, SQAM Course, Proficience, IISc IISc 1 Adopted from the internet - Introduction to Six Sigma-ASQ 2004 Adopted from the internet - Introduction to Six Sigma-ASQ 2004 Module 9 &14: Introduction to Module 9 &14: Introduction to statistical techniques and Six statistical techniques and Six Sigma Sigma 14.1 Concept of Six Sigma 14.1 Concept of Six Sigma 14.2 Methodologies 14.2 Methodologies 14.3 Six Sigma Structure 14.3 Six Sigma Structure 14.4 Projects Selection and 14.4 Projects Selection and Execution Execution 14.5 Reporting 14.5 Reporting 14.6 Case study – only demo 14.6 Case study – only demo

Upload: vijayasekar

Post on 11-Apr-2015

464 views

Category:

Documents


1 download

DESCRIPTION

This is one of the modules in the Software Quality Assurance and Management course

TRANSCRIPT

Page 1: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 11

Adopted from the internet - Introduction to Six Sigma-ASQ 2004Adopted from the internet - Introduction to Six Sigma-ASQ 2004

Module 9 &14: Introduction to statistical Module 9 &14: Introduction to statistical techniques and Six Sigmatechniques and Six Sigma

14.1 Concept of Six Sigma14.1 Concept of Six Sigma

14.2 Methodologies14.2 Methodologies

14.3 Six Sigma Structure14.3 Six Sigma Structure

14.4 Projects Selection and 14.4 Projects Selection and ExecutionExecution

14.5 Reporting14.5 Reporting

14.6 Case study – only demo14.6 Case study – only demo

Page 2: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 22

AgendaAgenda• Introduction and Course ObjectivesIntroduction and Course Objectives• Six Sigma OverviewSix Sigma Overview• The DMAIC MethodologyThe DMAIC Methodology

– DefineDefine• CharterCharter• Team ToolsTeam Tools

– MeasureMeasure• Process Map (IPO)Process Map (IPO)• Prioritization MatrixPrioritization Matrix• Statistical Process ControlStatistical Process Control• Capability AnalysisCapability Analysis• Measurement System AnalysisMeasurement System Analysis

Page 3: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 33

Agenda (Continued)Agenda (Continued)

– AnalyzeAnalyze•Failure Modes Effects Analysis (FMEA)Failure Modes Effects Analysis (FMEA)•ANOVAANOVA•RegressionRegression•Multi-Vari AnalysisMulti-Vari Analysis

– ImproveImprove•Design of Experiments (DOE)Design of Experiments (DOE)

– ControlControl•Effective Control PlansEffective Control Plans

Page 4: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 44

What is Six Sigma?What is Six Sigma?

Page 5: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 55

What is Sigma?What is Sigma?

• A MetricA Metric– Something we can measure for any Something we can measure for any

processprocess

• PhilosophyPhilosophy– Becomes part of our cultureBecomes part of our culture

• Is defined to be the standard Is defined to be the standard deviationdeviation

Page 6: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 66

2

3

4

56

308,537

66,807

6,210

Defects per

Million opportunities

233

3.4

What is Six Sigma? A Statistical Metric

Page 7: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 77

What is Six Sigma Performance?What is Six Sigma Performance?

99% Good (3.899% Good (3.8)) 99.99966% Good (699.99966% Good (6))

• 20,000 lost articles of mail per 20,000 lost articles of mail per hourhour

• Unsafe drinking water for Unsafe drinking water for almost 15 minutes each dayalmost 15 minutes each day

• 5,000 incorrect surgical 5,000 incorrect surgical operations per weekoperations per week

• Two short or long landings at Two short or long landings at most major airports each daymost major airports each day

• 200,000 wrong drug 200,000 wrong drug prescriptions each yearprescriptions each year

• Seven articles lost per hourSeven articles lost per hour

• One unsafe minute every seven One unsafe minute every seven monthsmonths

• 1.7 incorrect operations per 1.7 incorrect operations per weekweek

• One short or long landing every One short or long landing every five yearsfive years

• 68 wrong prescriptions per year68 wrong prescriptions per year

Page 8: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 88

What is Six Sigma?What is Six Sigma?First ThoughtsFirst Thoughts

• 3.4 PPM defective long term3.4 PPM defective long term• Cpk = 2.0Cpk = 2.0• The customer specs are much wider than my process The customer specs are much wider than my process

capability.capability.• I always thought 4I always thought 4sigma (Cpk=1.33) was “good sigma (Cpk=1.33) was “good

enough”.enough”.– Sigma - a measure of the statistical variation about a target valueSigma - a measure of the statistical variation about a target value– PParts arts PPer er MMillion defective - number of units expected to be found illion defective - number of units expected to be found

defective in a lot size of 1 million defective in a lot size of 1 million – CpK - the ability of the process to meet the range and target CpK - the ability of the process to meet the range and target

specifications (i.e. is the process centered on the target and in specifications (i.e. is the process centered on the target and in the desired range)the desired range)

– NO. IT IS MUCH MORE THAN THIS!!!!!!!!NO. IT IS MUCH MORE THAN THIS!!!!!!!!

Page 9: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 99

What is Six Sigma ?What is Six Sigma ?A random sampling of definitionsA random sampling of definitions

• 66 is not magic or high tech razzle-dazzle. is not magic or high tech razzle-dazzle.• 66 is a change process. is a change process.• 66 helps organizations make helps organizations make money.money.• 66 identifies and identifies and eliminates costseliminates costs which provide no value to which provide no value to

customers.customers.• 66 is a rigorous, focused, and highly effective implementation is a rigorous, focused, and highly effective implementation

of proven principles and techniques.of proven principles and techniques.• 66 is a management system focused to is a management system focused to deliver cashdeliver cash to the to the

bottom line.bottom line.• 66 is a strategic and tactical system for managing the whole is a strategic and tactical system for managing the whole

business.business.• 66 is a systematic methodology that is focused on achieving is a systematic methodology that is focused on achieving

significant significant financial resultsfinancial results..• 66 is a quality culture of strategies, statistics, and tools for is a quality culture of strategies, statistics, and tools for

improving a company’s improving a company’s bottom linebottom line..

Page 10: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1010

What Is Six Sigma?What Is Six Sigma?

Six Sigma is a highly technical method used by engineers and statisticians to fine-tune products and processes. YES AND……….

Six Sigma is a goal of near-perfection in meeting customer requirements. YES AND ……….

Six Sigma is a sweeping culture change effort to position a company for greater customer satisfaction, profitability, and competitiveness. YES AND ……….

Page 11: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1111

Six Sigma : A DefinitionSix Sigma : A Definition

A comprehensive and flexible system for achieving, sustaining and maximizing business success. Six Sigma is uniquely driven by close understanding of customer needs, disciplined use of facts, data, and statistical analysis, and diligent attention to managing, and reinventing business processes.

Page 12: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1212

Six Sigma : 5 Hidden TruthsSix Sigma : 5 Hidden Truths

[#1][#1] Six Sigma encompasses a broad array of business best practices and skills that are essential ingredients for success and growth.

[#2][#2] It works just as well in leading an entire organization as it does a department - it’s scalable.

[#3][#3] Potential gains are equally significant in service organizations and non-manufacturing activities.

[#4][#4] It is as much about people excellence as it is about technical excellence.

[#5][#5] Done right, Six Sigma improvement is thrilling and rewarding.

Page 13: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1313

Six Sigma :Requirements for Six Sigma :Requirements for Culture ChangeCulture ChangeSix Sigma :Requirements for Six Sigma :Requirements for Culture ChangeCulture Change

• Top-down commitment and involvementTop-down commitment and involvement– Actively be involved in project progress and Actively be involved in project progress and

reviewreview

• Measurement system to track progressMeasurement system to track progress– Evaluate the ability to access process changeEvaluate the ability to access process change

• Common well-understood set of metrics tied to Common well-understood set of metrics tied to project and organizational strategic planproject and organizational strategic plan

• Tough goal setting (reach out!) Think Tough goal setting (reach out!) Think entitlement!!!!!entitlement!!!!!– Benchmark best in classBenchmark best in class– Provide the required educationProvide the required education

• Spread the Success Story ; LeverageSpread the Success Story ; Leverage

Page 14: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1414

Six Sigma : The ProjectsSix Sigma : The Projects

• Projects are linked to the Strategic PlanProjects are linked to the Strategic Plan• Projects prioritized based on value to the Projects prioritized based on value to the

business, resources required, and timingbusiness, resources required, and timing– Yield improvement (RTY)Yield improvement (RTY)– Waste reductionWaste reduction– Capacity-productivity improvementCapacity-productivity improvement– Cycle time reductionCycle time reduction

• InventoryInventory• Days sales outstandingDays sales outstanding• Order processingOrder processing

• Projects selected with leadership buy-inProjects selected with leadership buy-in• Projects are formally trackedProjects are formally tracked• Team Leader and Management are held Team Leader and Management are held

accountableaccountable

Page 15: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1515

An Yield Improvement Example :An Yield Improvement Example : Card Drop RTY Exercise Card Drop RTY Exercise• This is a 3-stage process. The goal is to move 20 cards This is a 3-stage process. The goal is to move 20 cards

through the process by landing at least a portion of through the process by landing at least a portion of each card on a “Target” located on the floor.each card on a “Target” located on the floor.

• These cards may only move to the next stage when the These cards may only move to the next stage when the any portion of the card lands on the target surface.any portion of the card lands on the target surface.

• A card is to be dropped ONE AT A TIME from shoulder A card is to be dropped ONE AT A TIME from shoulder height.height.

• The card must be dropped from a vertical position.The card must be dropped from a vertical position.• Each operator is to count the total number of cards Each operator is to count the total number of cards

dropped at each station.dropped at each station.• The total time for 20 “good” cards to go through the The total time for 20 “good” cards to go through the

system must be recorded.system must be recorded.

Page 16: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1616

Six Sigma Project SelectionSix Sigma Project Selection

• Scope Projects ProperlyScope Projects ProperlyA Team document that clearly states the A Team document that clearly states the

goal.goal.

The project “Y” must be clearly measurable The project “Y” must be clearly measurable to maximize success.to maximize success.

The team document should include a from/to The team document should include a from/to statement clearly stating team goal. statement clearly stating team goal.

• Basic QualificationsBasic QualificationsThere is a gap between current and There is a gap between current and

desired/needed performancedesired/needed performance

The solution isn’t predetermined, nor is the The solution isn’t predetermined, nor is the optimal solution apparent.optimal solution apparent.

Page 17: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1717

Six Sigma : The People Six Sigma : The People

• Champions (Management Sponsor) Champions (Management Sponsor) – High level, committed to successHigh level, committed to success– Identify critical business needs to meet goalsIdentify critical business needs to meet goals

• Master Black Belts (Expert & Trainer)Master Black Belts (Expert & Trainer)– Provide 6Provide 6 technical leadership and statistical training. technical leadership and statistical training.– Mentor and guide black beltsMentor and guide black belts– Facilitate project generation sessions for businessFacilitate project generation sessions for business

• Black Belts (Team Leader & Mentor)Black Belts (Team Leader & Mentor)– Organizational change agentsOrganizational change agents– Project team leadersProject team leaders– Mentor for Green BeltsMentor for Green Belts– Facilitates project generation sessions and helps write project charterFacilitates project generation sessions and helps write project charter

• Green Belts (Team Leader and Team Member)Green Belts (Team Leader and Team Member)- Team member and process owner when project completed.Team member and process owner when project completed. project leadersproject leaders

Page 18: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1818

PLAN

DOCHECK

ACT

Define

Measure

AnalyzeImprove

Control

Six Sigma Improvement Methodology – D-M-A-I-C

Page 19: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 1919

DMAIC Methodology• Define :

– Establish project charter and scope– Determine return, resources, timing– Ensure management commitment

• Measure :– Generate process “is” map– Prioritize project Y’s and document process input variables– Access critical Y initial capability and measurement system

• Analyze :– Establish input variable (X’s) ranking via Prioritization matrix– Evaluate current control system via FMEA– Gather additional information via passive data collection/analysis

• Improve– Do active data collection/analysis (DOE’s, etc.) on key inputs

• Control– Develop/Implement control plans to maintain gains– Gather long term capability

Page 20: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2020

Key TermsKey TermsY’sY’s• Key process output variable Key process output variable

• Thought of in terms of performance/defect Thought of in terms of performance/defect measuresmeasures

X’sX’s• Key process input variable Key process input variable

• Are a list of variables that influence the Are a list of variables that influence the response(s) or Y’sresponse(s) or Y’s

• Y is a function of the X’s or Y = f(X1, X2, …)Y is a function of the X’s or Y = f(X1, X2, …)The goal of six sigma is to understand the X’s that control the Y’s.

Page 21: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2121

Common Six Sigma MistakesCommon Six Sigma Mistakes

•Thinking the key to Six Sigma is Statistics, Statistics, Statistics - NO ! IT IS A MANAGEMENT SYSTEM !!!

•Overemphasis on Cost Reduction

•Failure to address improvement as part of the job

•Ignoring team dynamics as a cause of project failures

•Overreliance on the Black Belt, Six Sigma equals projects

•Not understanding common cause vs. special cause variation

•Failure to apply the concept of the customer internally

•Recognizing management’s involvement not just commitment

•Ignoring the management of change

Page 22: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2222

The Six Sigma Road The Six Sigma Road Map Map

The DMAIC The DMAIC MethodologyMethodology

Page 23: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2323

DMAIC Methodology

• Define :– Establish project charter and scope– Determine return, resources, timing– Ensure management commitment – List of customer (internal & external) requirements

• Measure :– Generate process “is” map– Prioritize project Y’s and document process input variables– Access critical Y initial capability and measurement system– Baseline data on current process performance– Revisions/Improvements to project charter– Access measurement system capability

Page 24: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2424

DMAIC MethodologyDMAIC Methodology

• AAnalyze :nalyze :– Establish input variable (X’s) ranking via Prioritization matrixEstablish input variable (X’s) ranking via Prioritization matrix– Evaluate current control system via Failure Modes Effects Evaluate current control system via Failure Modes Effects

Analysis (FMEA)Analysis (FMEA)– Gather additional information via passive data Gather additional information via passive data

collection/analysis (ANOVA and Multi-Vari)collection/analysis (ANOVA and Multi-Vari)

• IImprovemprove– Do active data collection/analysis (DOE’s, etc.) on key inputsDo active data collection/analysis (DOE’s, etc.) on key inputs

• CControlontrol– Develop/Implement control plans to maintain gains (use Develop/Implement control plans to maintain gains (use

FMEA as initial input)FMEA as initial input)– Gather long term capability documenting before/after Gather long term capability documenting before/after

improvement resultsimprovement results

Page 25: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2525

Define :Project Scope

• Identify well-defined Baseline, Goal, and Entitlement values

• Values must be included for ALL metrics, not just the one(s) of primary focus for improvement– The productivity improvements are Operating Income or

Working Capital

• Values are entered as Yearly values, maintaining a connection to business metrics and measurement

• Values can change throughout the project - make sure the Charter is updated

Page 26: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2626

Entitlement

• Defines what’s possible - a vision

• Provides a performance level for which to aim

• “Best in class” performance

• Bound by either equipment or engineering limitations

Page 27: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2727

DMAIC Methodology :DMAIC Methodology :The Tools : DefineThe Tools : Define

• Project Charter : Line of sight to business Project Charter : Line of sight to business unit strategic goalsunit strategic goals

• Process Map : Map showing high level and Process Map : Map showing high level and detailed inputs and outputsdetailed inputs and outputs

• Affinity Diagram – Can identify specific Affinity Diagram – Can identify specific process for improvementprocess for improvement

• Process Perspective : Rolled Throughput Process Perspective : Rolled Throughput Yield or First Pass YieldYield or First Pass Yield

• Stakeholder Analysis (WIFM) Stakeholder Analysis (WIFM)

Page 28: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2828

DMAIC Methodology :DMAIC Methodology :The ToolsThe Tools• Project Charter MUSTS :Project Charter MUSTS :

– Clarify team expectationsClarify team expectations– Clarify team rolesClarify team roles– Define business “pain” or problem Define business “pain” or problem

• Improve product RTY from XX to YYImprove product RTY from XX to YY

•Reduce product cycle time from XX to YY.Reduce product cycle time from XX to YY.

•Decrease defects from process A from XX Decrease defects from process A from XX to YYto YY

– Identify key milestones and objectivesIdentify key milestones and objectives

Page 29: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 2929

Affinity DiagramAffinity Diagram

• Used as a brainstorming tool to Used as a brainstorming tool to generate ideas for “weakness based” generate ideas for “weakness based” opportunities.opportunities.– What are the main issues preventing us What are the main issues preventing us

from implementing six sigma?from implementing six sigma?– How should a new product be marketed?How should a new product be marketed?– What are our challenges to achieve next What are our challenges to achieve next

year’s growth objectives?year’s growth objectives?

Page 30: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3030

Affinity Diagram StepsAffinity Diagram Steps

• State the problemState the problem

• Brainstorm ideas/issues by writing ideas on a sticky Brainstorm ideas/issues by writing ideas on a sticky notenote

• EVERYONE writes EACH idea on separate sticky EVERYONE writes EACH idea on separate sticky notesnotes

• Place all notes on the wall.Place all notes on the wall.

• In SILENCE, group the ideas by general categories.In SILENCE, group the ideas by general categories.

• In group discussion, develop titles for groups.In group discussion, develop titles for groups.

• (Optional) Vote on top priority issues (3 votes per (Optional) Vote on top priority issues (3 votes per person, 9=top priority; 3=2person, 9=top priority; 3=2ndnd priority; 1=3 priority; 1=3rdrd priority. priority.

Page 31: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3131

Affinity Diagram ExerciseAffinity Diagram Exercise

• What are the main issues preventing What are the main issues preventing us from implementing six sigma?us from implementing six sigma?

Page 32: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3232

Stakeholder AnalysisStakeholder Analysis

• Stakeholder analysis identifies key Stakeholder analysis identifies key stakeholders, accesses potential risks or stakeholders, accesses potential risks or resistance, and helps plan strategy to resistance, and helps plan strategy to reduce identified gaps.reduce identified gaps.

• Stakeholders are people who have an Stakeholders are people who have an interest in a project’s outcome (positive or interest in a project’s outcome (positive or negative).negative).

• Stakeholder analysis should be done at the Stakeholder analysis should be done at the beginning of a project.beginning of a project.

Page 33: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3333

Doing a Stakeholder Doing a Stakeholder AnalysisAnalysis• Develop a “stakeholder table” (see next Develop a “stakeholder table” (see next

slide).slide).

• Do an assessment of each stakeholders Do an assessment of each stakeholders importance to the project success and importance to the project success and their relative power/influence.their relative power/influence.

• Identify risks and assumptions which Identify risks and assumptions which will affect project design and success.will affect project design and success.

Page 34: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3434

Stakeholder Analysis Worksheet 

 

Stakeholder Analysis of Present Relationship

Plans to Improve Relationship

Plans to Communicate

Primary Point of Contact (Internal)

 

  

       

  

       

  

       

  

       

  

       

 

Page 35: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3535

RACI MatrixRACI Matrix• A team tool used to clarify team roles A team tool used to clarify team roles

and pinpoint potential conflicts or gaps and pinpoint potential conflicts or gaps in assignments.in assignments.– R = ResponsibleR = Responsible– A = AccountableA = Accountable– C = ConsultantC = Consultant– I = InformedI = Informed Team Member

Project Task A B C D E

1 R I R C2 I C R I C3 R R R I C4 A C I C5 R A

Page 36: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3636

The GRPI ToolThe GRPI Tool

• A team evaluation tool which allows a self assessment to be used for A team evaluation tool which allows a self assessment to be used for improving team effectiveness.improving team effectiveness.– Project Project GGoalsoals

• Are they specific, measurable, attainable, relevant, and timely?Are they specific, measurable, attainable, relevant, and timely?– Team Team RRolesoles

• Are the team roles and responsibilities defined and agreed Are the team roles and responsibilities defined and agreed upon?upon?

– Team Team PProcessesrocesses• Do we know the project key success factors ; is there an Do we know the project key success factors ; is there an

effective project plan in place ; Do we have specific metrics effective project plan in place ; Do we have specific metrics linked to the project goals?linked to the project goals?

– IInterpersonalnterpersonal• Do we have trust, flexibility, sensitivity, and creativity in Do we have trust, flexibility, sensitivity, and creativity in

communicating with each other?communicating with each other?• Each member of the team is to rank each of these questions on a 0-Each member of the team is to rank each of these questions on a 0-

100 scale and submit privately for data analysis.100 scale and submit privately for data analysis.

Page 37: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3737

Managing Change For A Successful Six Sigma Project

• Establish the need for change

• Design change to meet that need

• Identify the impact of the planned change

• Plan how the change will be implemented

• Implement the changes

Page 38: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3838

Change Management Exercise• Stand up• Choose a partner• Take a couple seconds to observe your partner’s

appearance• Turn around• Each of you change 5 things about your appearance

– Turn around and face your partner when finished

• Each person identify the changes your partner made to their appearance

Page 39: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 3939

Key Outcomes of Change Exercise

1. People will feel awkward and self-conscious

2. People will think about what they have to give up

3. People will feel alone, even if others are going through similar change

4. People are at different levels of readiness for change

5. People can handle only so much change

6. People will be concerned that resources will be inadequate

7. Without pressure, people will revert to old behaviors

Page 40: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4040

Change Management• The ability to change must be greater than our

resistance.

• We can either increase the force mandating change (management edict, etc.) or reduce the level of resistance.

Page 41: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4141

So, how do we deal with Resistance?

Page 42: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4242

What is Resistance?

• It is energy in another direction

• It is not necessarily bad

• There is valuable information in it

• It is the energy it takes to stay in the same place

Page 43: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4343

Faces of ResistanceFaces of Resistance

•Technical ResistanceTechnical Resistance

•Political ResistancePolitical Resistance

•Organizational ResistanceOrganizational Resistance

•Individual ResistanceIndividual Resistance

Page 44: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4444

Technical ResistanceTechnical Resistance

• Perceive that the change will make Perceive that the change will make you feel inadequate or stupidyou feel inadequate or stupid

• Focuses on highly detailed and Focuses on highly detailed and insignificant issuesinsignificant issues

• To help dissipate, focus on higher To help dissipate, focus on higher level concepts which encourage level concepts which encourage demonstration of competencedemonstration of competence

Reproduced from “Making Six Sigma Last”, Eckes

Page 45: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4545

Political ResistancePolitical Resistance

• Perceive that change is a threat or Perceive that change is a threat or loss to the status quoloss to the status quo

• Focuses on real or perceived lossFocuses on real or perceived loss

• To dissipate, focus on positive To dissipate, focus on positive aspects of change and be honest aspects of change and be honest when dealing with real losswhen dealing with real loss

Reproduced from “Making Six Sigma Last”, Eckes

Page 46: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4646

Organizational ResistanceOrganizational Resistance

• Perceive that change initiative Perceive that change initiative removes sense of controlremoves sense of control

• As before, sense of loss or As before, sense of loss or subtractionsubtraction

• To dissipate, get person involved To dissipate, get person involved such that they feel greater control such that they feel greater control and a greater sense of ownershipand a greater sense of ownership

Reproduced from “Making Six Sigma Last”, Eckes

Page 47: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4747

Individual ResistanceIndividual Resistance

• Stress is at such a level that change Stress is at such a level that change results in emotional and behavioral results in emotional and behavioral paralysisparalysis

• May say the right thing but action is May say the right thing but action is slowslow

• To dissipate, empathize and off-load To dissipate, empathize and off-load action itemsaction items

Page 48: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4848

Team DynamicsTeam Dynamics

Page 49: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 4949

Team Performance Model :Team Performance Model :Four Stages of Team Four Stages of Team PerformancePerformance•FormingForming• Who are you?Who are you?• Why am I here?Why am I here?• Will you accept me as I am?Will you accept me as I am?• Are there hidden agendas?Are there hidden agendas?

•StormingStorming• Can I trust you?Can I trust you?• Is there group consensus on goals?Is there group consensus on goals?• What tasks must the team do?What tasks must the team do?••••

Page 50: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5050

Team Performance Model :Team Performance Model :Four Stages of Team Four Stages of Team PerformancePerformance•Norming Norming • How do we manage the team?How do we manage the team?• Are conflicts resolved?Are conflicts resolved?• Do we all own responsibility for success?Do we all own responsibility for success?• Who are our stakeholders how do we resolve Who are our stakeholders how do we resolve needs?needs?

•PerformingPerforming• Are boundaries and limits broken?Are boundaries and limits broken?• Are activities coordinated?Are activities coordinated?• Is communication intuitive?Is communication intuitive?• Is there openness and frank discussion?Is there openness and frank discussion?

Page 51: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5151

Team Management ExerciseTeam Management Exercise

• Using your prior knowledge from Using your prior knowledge from teams you have been involved with teams you have been involved with during your careers, brainstorm a list during your careers, brainstorm a list of critical success factors which of critical success factors which enabled those teams to succeed.enabled those teams to succeed.

Page 52: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5252

DMAIC Methodology Tools : DMAIC Methodology Tools : The Tools : MeasureThe Tools : Measure• Process Maps :Process Maps :

– A graphical illustration of the current processA graphical illustration of the current process– All input and output variables are All input and output variables are

documenteddocumented– Must be done via team approach including Must be done via team approach including

process owners and stakeholdersprocess owners and stakeholders– Helps identify gaps in current process Helps identify gaps in current process

control which may require immediate test control which may require immediate test measurement or capability analysismeasurement or capability analysis

– Helps identify non-value-added stepsHelps identify non-value-added steps

Page 53: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5353

x

x

x

Process Thinking: S-I-P-O-CProcess Thinking: S-I-P-O-C

Suppliers Customers

X’s, Inputs•Process variables•Inputs to the process•Essential actions to achieve strategic goals•Key influences on customer satisfaction

Y’s, Outputs•Customer requirements•Yield, Waste, Rate•On Time Delivery•Economic Profit•Strategic goal •Customer satisfaction

ProcessProcess

Inputs Outputs

PandPandee

Page 54: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5454

Six Sigma Process Map :Six Sigma Process Map :IPO (Inputs, Process, Outputs)IPO (Inputs, Process, Outputs)

• The process map is derived from the SIPOC diagramThe process map is derived from the SIPOC diagram..– S: SuppliersS: Suppliers– I : InputsI : Inputs– P: ProcessP: Process– O: OutputsO: Outputs– C: CustomersC: Customers

• Identifies the current process in terms of inputs, Identifies the current process in terms of inputs, process, and outputs.process, and outputs.

• Provides initial team consensus on all input variables Provides initial team consensus on all input variables (X’s) which may affect the process outputs (Y’s).(X’s) which may affect the process outputs (Y’s).

Page 55: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5555

Steps to Complete the Process Steps to Complete the Process MapMap

• Gather a cross-functional team which Gather a cross-functional team which is familiar with the process.is familiar with the process.

• At a reasonably high level, list all the At a reasonably high level, list all the process steps. As a guide, the total process steps. As a guide, the total number of process steps should not number of process steps should not exceed six.exceed six.

• List the outputs for each step.List the outputs for each step.• List the inputs that cause those List the inputs that cause those

outputs to occur.outputs to occur.

Page 56: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5656

DMAIC Methodology :DMAIC Methodology :The ToolsThe Tools• MeasureMeasure

– Prioritization Matrix (reducing the Prioritization Matrix (reducing the number of X’s to consider for further number of X’s to consider for further evaluation)evaluation)

– Capability Analysis (Initial baseline Capability Analysis (Initial baseline performance)performance)

– Measurement System Analysis (Gage Measurement System Analysis (Gage R&R and %P/T)R&R and %P/T)

– Basic Data Analysis Tools (histograms, Basic Data Analysis Tools (histograms, box plots, pareto diagrams, etc.)box plots, pareto diagrams, etc.)

Page 57: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5757

DMAIC Tools :Prioritization Matrix

• This is a simplified QFD (Quality Function Deployment) matrix to rank the importance of the input variables against the project and customer requirements

• Key Outputs are scored for their importance to the project and customer

• Key Inputs are scored based on their relationship to these outputs

Page 58: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5858

Prioritization Matrix Steps1. Identify key outputs from the “30,000 ft”

process map2. Rank order and assign priority factor to

each output (using a 1 to 10 scale)3. List all process steps and inputs from the

detailed process map4. Evaluate correlation of each input to each

output using a 0,1,3,9 ranking– 0 = no correlation ; 9 = strong correlation

5. Cross multiply correlation values with priority factors and sum for each input (X)

Page 59: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 5959

Prioritization Matrix Layout

Rating

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Outp

ut

Total

Process Step Process Input

1 02 03 04 05 06 07 08 0

Page 60: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6060

The Measure Phase :The Measure Phase :SPC and CapabilitySPC and Capability• SPC is a methodology of attaining and SPC is a methodology of attaining and

maintaining statistical controlmaintaining statistical control

• SPC distinguishes between common SPC distinguishes between common cause and special cause variabilitycause and special cause variability– Common cause variability : Random or Common cause variability : Random or

systematic variation inherent in the systematic variation inherent in the systemsystem

– Special cause variability : Isolated and/or Special cause variability : Isolated and/or related to a specific eventrelated to a specific event

Page 61: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6161

SPC and CapabilitySPC and Capability

• Types of control charts :Types of control charts :– Variables DataVariables Data

• Individual/Moving Range (I/MR)Individual/Moving Range (I/MR)

• X-Bar/RX-Bar/R

– AttributesAttributes• P-Chart (Percent defective, unequal sample size)P-Chart (Percent defective, unequal sample size)

• NP-Chart (Number defective, equal sample size)NP-Chart (Number defective, equal sample size)

• C-Chart (Number of defects, constant sample area)C-Chart (Number of defects, constant sample area)

• U-Chart (Number of defects/area, variable sample U-Chart (Number of defects/area, variable sample area)area)

Page 62: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6262

Individual/Moving Range Individual/Moving Range ChartsCharts• Individuals (I) chart presents the Individuals (I) chart presents the

measurements in time order.measurements in time order.– Examples include inventory, sales, number of Examples include inventory, sales, number of

accounts receivable.accounts receivable.

• Moving Range (MR) chart shows the short-Moving Range (MR) chart shows the short-term variability in the processterm variability in the process– Assesses stability of process variation.Assesses stability of process variation.– Moving Range is the absolute difference Moving Range is the absolute difference

between consecutive observations.between consecutive observations.

Page 63: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6363

I/MR ExampleI/MR Example

302010Subgroup 0

25

20

15

10

5

0

Indi

vid

ual V

alue

Mean=14.17

UCL=24.14

LCL=4.195

10

5

0

Mov

ing

Ran

ge

R=3.749

UCL=12.25

LCL=0

I and MR Chart for C1

Upper Control Limit

Lower Control Limit

Average or Center Line

Page 64: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6464

I/MR ChartI/MR Chart

• The I/MR chart is a very powerful The I/MR chart is a very powerful chart because…..chart because…..– For almost any distribution:For almost any distribution:

•+/- 1 standard deviation accounts for +/- 1 standard deviation accounts for approximately 60-70% of the variationapproximately 60-70% of the variation

•+/- 2 standard deviations account for +/- 2 standard deviations account for approximately 90-95% of the variationapproximately 90-95% of the variation

•+/- 3 standard deviations account for at +/- 3 standard deviations account for at least 98% of the variationleast 98% of the variation

Page 65: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6565

I/MR Chart Control Limit I/MR Chart Control Limit CalculationCalculation

• The centerline is the overall average of the data (X-The centerline is the overall average of the data (X-Bar)Bar)

• The process standard deviation is calculated by The process standard deviation is calculated by taking the overall moving range and dividing by an taking the overall moving range and dividing by an adjustment factor to correct for the moving range adjustment factor to correct for the moving range being a biased estimate of the process standard being a biased estimate of the process standard deviationdeviation– The moving range is the absolute difference between The moving range is the absolute difference between

consecutive measurementsconsecutive measurements– = (Average Moving Range)/d2= (Average Moving Range)/d2– d2 = 1.128 for moving range of size 2d2 = 1.128 for moving range of size 2– Control limits are X-Bar +/- 3(Control limits are X-Bar +/- 3())

Page 66: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6666

Capability Analysis :Capability Analysis :Voice of the Customer vs. Voice of the Voice of the Customer vs. Voice of the ProcessProcess

• Capability analysis compares how the Capability analysis compares how the process is performing relative to process is performing relative to customer specificationscustomer specifications

• Capability ratios are the ratio of Capability ratios are the ratio of customer spec limits / process customer spec limits / process variationvariation

• Typical capability metrics include CTypical capability metrics include Cpp, , CCpkpk, P, Ppp, P, Ppkpk

Page 67: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6767

CapabilityCapability

• Cp = (Spec width) / (6s)Cp = (Spec width) / (6s)– s = R-Bar/d2 from I/MR control charts = R-Bar/d2 from I/MR control chart

• Cpk = Minimum (X-Bar – Tgt)/3s , Cpk = Minimum (X-Bar – Tgt)/3s , (Tgt-X-Bar)/3s(Tgt-X-Bar)/3s

• Pp = (Spec width) / 6(Pp = (Spec width) / 6())– = Sqrt (= Sqrt ((X-X-Bar)(X-X-Bar)22 / (n-1)) / (n-1))

• Ppk = Ppk = Minimum (X-Bar – Tgt)/3Minimum (X-Bar – Tgt)/3 , , (Tgt-X-Bar)/3(Tgt-X-Bar)/3

Page 68: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6868

Class ExerciseClass Exercise

• Cut out one paper helicopterCut out one paper helicopter• From a height of 6 feet, drop and time From a height of 6 feet, drop and time

the helicopter drop 20 times.the helicopter drop 20 times.• Record the drop times.Record the drop times.• We as a class will enter the data, and We as a class will enter the data, and

generate I/MR charts and capability generate I/MR charts and capability charts.charts.

• Be prepared to discuss outputs and Be prepared to discuss outputs and take aways. take aways.

Page 69: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 6969

The Measurement Phase :The Measurement Phase :Measurement System Measurement System AnalysisAnalysis• Objective :Objective :

– Validate that the current measurement Validate that the current measurement system on the project Y (cycle time, system on the project Y (cycle time, inventory, yield, etc) is good enough to inventory, yield, etc) is good enough to detect process change.detect process change.

• Methodology :Methodology :– AuditsAudits– Gage R&R StudyGage R&R Study

Page 70: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7070

Measurement System Analysis : Measurement System Analysis : AuditsAudits

• An independent assessment of the current data An independent assessment of the current data collection system. Examples include inventory collection system. Examples include inventory reduction, complaint reduction, or sales reduction, complaint reduction, or sales effectiveness.effectiveness.

• Select an appropriate sample size. Typical may be Select an appropriate sample size. Typical may be between 10 and 30.between 10 and 30.

• Have a second source validate the original data.Have a second source validate the original data.

• Evaluate per cent agreement or use a paired-t-test.Evaluate per cent agreement or use a paired-t-test.– A paired-t-test evaluates whether the difference between A paired-t-test evaluates whether the difference between

each pair of observations (current,audit) is 0.each pair of observations (current,audit) is 0.

• Goal is to have at least 70% agreement.Goal is to have at least 70% agreement.

Page 71: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7171

Measurement System Measurement System Analysis : Gage R&R StudiesAnalysis : Gage R&R Studies• A formal evaluation involving 2 or more A formal evaluation involving 2 or more

operators, at least 10 samples, with the entire operators, at least 10 samples, with the entire experiment repeated.experiment repeated.

• The study quantifies both repeatability and The study quantifies both repeatability and reproducibility.reproducibility.

• % R&R is the observed test method standard % R&R is the observed test method standard deviation (both repeatability and deviation (both repeatability and reproducibility combined) divided by the total reproducibility combined) divided by the total observed standard deviation of the study.observed standard deviation of the study.

• Goal is to have %R&R < 30%.Goal is to have %R&R < 30%.

Page 72: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7272

Measurement System Measurement System AnalysisAnalysis• Is the measurement system generating Is the measurement system generating

reliable data?reliable data?– Accuracy : How well does the average of the Accuracy : How well does the average of the

measurements represent the true value?measurements represent the true value?– Repeatability : How consistent are repeated Repeatability : How consistent are repeated

measurements BY THE SAME OPERATOR on the measurements BY THE SAME OPERATOR on the same sample?same sample?

– Reproducibility : How consistent are DIFFERENT Reproducibility : How consistent are DIFFERENT OPRATORS at measuring the same sample?OPRATORS at measuring the same sample?

Page 73: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7373

Measurement System Measurement System Metrics for Continuous DataMetrics for Continuous Data

• Precision to Tolerance Ratio :Precision to Tolerance Ratio :– P/T = 5.15 (P/T = 5.15 ( ms)ms) /(Specification /(Specification

Tolerance)Tolerance)– Note : Only applicable for two sided Note : Only applicable for two sided

specsspecs

• % Gage R&R :% Gage R&R :– % R&R = % R&R = msms / / totaltotal X 100 X 100

Page 74: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7474

Measurement System Measurement System Metrics for Attribute DataMetrics for Attribute Data

• Accuracy : % agreement with known Accuracy : % agreement with known standardstandard

• Repeatability : % agreement within Repeatability : % agreement within appraisersappraisers

• Reproducibility : % agreement Reproducibility : % agreement between appraisers between appraisers

Page 75: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7575

Attribute MSA Sample Attribute MSA Sample OutputOutput

21

90

80

70

60

50

40

30

20

10

Appraiser

Pe

rce

nt

Within Appraiser

21

80

70

60

50

40

30

20

10

0

Appraiser

Pe

rce

nt

Appraiser v s Standard

Assessment AgreementDate of study:Reported by:Name of product:Misc:

[ , ] 95.0% CI

Percent

Page 76: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7676

Attribute MSA ExerciseAttribute MSA Exercise

• 2 Operators2 Operators

• 10 Samples10 Samples

• 4 Different Sodas (Coke, Pepsi, RC, 4 Different Sodas (Coke, Pepsi, RC, HEB)HEB)

• 2 trials2 trials

Page 77: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7777

DMAIC Methodology :DMAIC Methodology :The Tools : AnalyzeThe Tools : Analyze• Failure Modes Effects Analysis (FMEA) Failure Modes Effects Analysis (FMEA)

prioritizes known gaps/risks in current prioritizes known gaps/risks in current control system.control system.

• Multi-Vari analysis passively studies Multi-Vari analysis passively studies existing process to validate key X’s existing process to validate key X’s determined from the FMEA or discover determined from the FMEA or discover hidden X’s using statistics to validate hidden X’s using statistics to validate conclusions.conclusions.

• Detailed statistical analyses including tests Detailed statistical analyses including tests of means/medians, Analysis of Variance of means/medians, Analysis of Variance (ANOVA), and Regression Analysis.(ANOVA), and Regression Analysis.

Page 78: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7878

AAnalyze : Failure Modes and nalyze : Failure Modes and Effects Analysis (FMEA)Effects Analysis (FMEA)• Identifies the ways in which a product or Identifies the ways in which a product or

process can fail and assigns risk to this process can fail and assigns risk to this failure modefailure mode

• Estimates the risk associated with a specific Estimates the risk associated with a specific cause in terms of customer requirements cause in terms of customer requirements and the current detection systemand the current detection system

• Uses the above risks to determine key gaps Uses the above risks to determine key gaps in current control systems and prioritize in current control systems and prioritize actionaction

Page 79: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 7979

FMEA ProcedureFMEA Procedure

• Assemble a cross-functional teamAssemble a cross-functional team• For each “X” or critical process input as determined For each “X” or critical process input as determined

by the prioritization matrix, determine the failure by the prioritization matrix, determine the failure mode(s).mode(s).

• For each failure mode, determine the effect (result) For each failure mode, determine the effect (result) on the project goal or “Y”.on the project goal or “Y”.

• Also, for each failure mode, list the potential causes.Also, for each failure mode, list the potential causes.• Identify current controls for each failure mode/cause.Identify current controls for each failure mode/cause.• Determine the severity (how bad) of the effect, the Determine the severity (how bad) of the effect, the

frequency (how often) the cause, and how good is the frequency (how often) the cause, and how good is the current control system. It is common to use a 1-10 current control system. It is common to use a 1-10 scale for these.scale for these.

Page 80: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8080

FMEA Terms

• Failure Mode– What went wrong in the process?

• Effects of Failure– What are the impacts of the failure occurring?

• Cause of Failure– What are the potential causes of this failure?

• Current Controls– What controls or procedures exist to prevent

the cause or failure mode?

• Severity, Occurrence, Detection– Risk Priority Number (RPN)

Page 81: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8181

FMEA : Risk Priority Number (RPN)

• The output of an FMEA is the Risk Priority Number which ranks the key gaps and establishes priority to fix the control system

• RPN is the product of the quantitative ratings related to the effects, causes, and controls:

• RPN = Severity X Occurrence X Detection

Page 82: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8282

Definition of RPN Terms• Severity (of Effect) -Severity (of Effect) - importance of effect on

project Y or counter measures.– 1= None; 10=Very Severe

• Occurrence (of Cause) –Occurrence (of Cause) – How often a cause happens and causes a failure mode.– 1=Rarely Occurs; 10=Frequently Occurs

• Detection (capability of Current Controls) –Detection (capability of Current Controls) – How good is the current system at either detecting the cause or failure mode– 1=Easy to detect cause; 10=Not able to detect failure

mode

Page 83: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8383

FMEA WorksheetFMEA WorksheetProcess FMEA Number

Failure Mode and Effects Analysis Prepared By

(FMEA) FMEA Date

Key Date Revision Date

Core Team Page of

Action Results

Process InputPotential

Failure Mode(s)

Potential Effect(s) of Failure

Sev

Potential Cause(s)/

Mechanism(s) of Failure

Prob

Current Controls

Det

RPN

Recommended Action(s)

Responsibility & Target

Completion Date

Actions Taken

Page 84: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8484

DMAIC Methodology :DMAIC Methodology :The Analyze Statistical ToolsThe Analyze Statistical Tools• Hypothesis TestingHypothesis Testing

– Assessing RiskAssessing Risk

• ANOVAANOVA– Tests for differences in meansTests for differences in means– Tests for partitioning variability Tests for partitioning variability

componentscomponents

• RegressionRegression– Establishing linear relationships Establishing linear relationships

between the Y’s and X’sbetween the Y’s and X’s

Page 85: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8585

Hypothesis TestingHypothesis Testing

• Hypothesis testing assigns risk to aid Hypothesis testing assigns risk to aid in statistical decision making. in statistical decision making.

• Ho : The null or “dull” hypothesis Ho : The null or “dull” hypothesis assumes there are no differences. The assumes there are no differences. The null hypothesis is rejected if there is null hypothesis is rejected if there is sufficient evidence.sufficient evidence.

• Ha : The alternative or opposite Ha : The alternative or opposite hypothesis states there is a difference. hypothesis states there is a difference.

Page 86: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8686

Hypothesis Testing RisksHypothesis Testing Risks

• There are two types of risks in There are two types of risks in deciding whether or not to accept a deciding whether or not to accept a null hypothesis.null hypothesis.

• Type I error or alpha error : The Type I error or alpha error : The probability of rejecting the null probability of rejecting the null hypothesis when it is in fact true.hypothesis when it is in fact true.

• Type II error or beta error : The Type II error or beta error : The probability of accepting the null probability of accepting the null hypothesis when it is in fact false.hypothesis when it is in fact false.

Page 87: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8787

Hypothesis Testing Hypothesis Testing DecisionsDecisions• Determine null hypothesisDetermine null hypothesis

– For example, the average of the first sample equals the average of For example, the average of the first sample equals the average of the second sample.the second sample.

• Collect appropriate amount of dataCollect appropriate amount of data• Calculate appropriate signal to noise ratio.Calculate appropriate signal to noise ratio.

– From above, the test statistic is measuring whether the difference From above, the test statistic is measuring whether the difference between the two averages (signal) is sufficiently greater than the between the two averages (signal) is sufficiently greater than the variability of each sample (noise).variability of each sample (noise).

• Make decision based on data and predetermined riskMake decision based on data and predetermined risk– In most software packages, a p-value is used aid in decision making.In most software packages, a p-value is used aid in decision making.

• A p-value is the probability of the observed result when Ho A p-value is the probability of the observed result when Ho is true.is true.– As a general rule, if P is low (less than 0.05), then there is sufficient As a general rule, if P is low (less than 0.05), then there is sufficient

evidence to reject the null hypothesis and conclude there is a evidence to reject the null hypothesis and conclude there is a statistical difference between the samples.statistical difference between the samples.

Page 88: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8888

Tests for Differences in Means :Tests for Differences in Means :The Analysis of Variance (ANOVA)The Analysis of Variance (ANOVA)

• Null hypothesis (Ho) : All means are equal to Null hypothesis (Ho) : All means are equal to one another. Note, For ANOVA, the Response (Y) one another. Note, For ANOVA, the Response (Y) must be continuous and the X variable discrete.must be continuous and the X variable discrete.

• Alternative hypothesis (Ha) : At least one mean Alternative hypothesis (Ha) : At least one mean is different than all others.is different than all others.

• ANOVA tests whether or not different levels of a ANOVA tests whether or not different levels of a particular X affects the response or Y variable.particular X affects the response or Y variable.

• ANOVA Assumes the data are from a reasonably ANOVA Assumes the data are from a reasonably normal distribution and the residuals are normal distribution and the residuals are normally distributed.normally distributed.

Page 89: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 8989

ANOVA Example : ANOVA Example : Helicopter Wing LengthHelicopter Wing Length• Null Hypothesis (Ho) : 3 different wing Null Hypothesis (Ho) : 3 different wing

lengths do not affect flight time.lengths do not affect flight time.– ft1 = ft2 = ft3ft1 = ft2 = ft3

• The data have already been collected from The data have already been collected from a previous experiment.a previous experiment.

• Validate assumptions :Validate assumptions :– One way to to that is to plot the data using an One way to to that is to plot the data using an

I/MR chart when the data are time dependent – I/MR chart when the data are time dependent – such as monthly sales, weekly accounts such as monthly sales, weekly accounts receivable, etc – or as in this case where the receivable, etc – or as in this case where the data do represent a time order.data do represent a time order.

Page 90: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9090

ANOVA : Check for ANOVA : Check for NormalityNormality

Observation

Indiv

idual V

alu

e

30272421181512963

4

3

2

1

_X=2.795

UCL=4.395

LCL=1.195

WL1 WL2 WL3

Observation

Movin

g R

ange

30272421181512963

2.0

1.5

1.0

0.5

0.0

__MR=0.602

UCL=1.966

LCL=0

WL1 WL2 WL3

I-MR Chart of FlightTime by WingLength

Does the data appear to be coming from a normal distribution?

Is the process stable?

Page 91: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9191

ANOVA : Analysis OutputANOVA : Analysis Output

• One-way ANOVA: FlightTime versus WingLength One-way ANOVA: FlightTime versus WingLength

• Source DF SS MS F PSource DF SS MS F P• WingLength 2 1.056 0.528 3.32 0.051WingLength 2 1.056 0.528 3.32 0.051• Error 27 4.292 0.159Error 27 4.292 0.159• Total 29 5.349Total 29 5.349

• S = 0.3987 R-Sq = 19.75% R-Sq(adj) = 13.81%S = 0.3987 R-Sq = 19.75% R-Sq(adj) = 13.81%

• Individual 95% CIs For Mean Based onIndividual 95% CIs For Mean Based on• Pooled StDevPooled StDev• Level N Mean StDev -------+---------+---------+---------+--Level N Mean StDev -------+---------+---------+---------+--• WL1 10 2.3403 0.2576 (----------*---------)WL1 10 2.3403 0.2576 (----------*---------)• WL2 10 2.6274 0.4011 (---------*---------)WL2 10 2.6274 0.4011 (---------*---------)• WL3 10 2.7948 0.4997 (----------*---------)WL3 10 2.7948 0.4997 (----------*---------)• -------+---------+---------+---------+---------+---------+---------+---------+--• 2.25 2.50 2.75 3.002.25 2.50 2.75 3.00

• Pooled StDev = 0.3987Pooled StDev = 0.3987

What is the P-Value?

Page 92: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9292

ANOVA Output : GraphsANOVA Output : Graphs

WingLength

Flig

htT

ime

WL3WL2WL1

3.5

3.0

2.5

2.0

1.5

Boxplot of FlightTime by WingLength

Page 93: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9393

ANOVA Class ExerciseANOVA Class Exercise

• Make three (3) helicopters varying ONLY Make three (3) helicopters varying ONLY ONE OF THE X VARIABLES (wing length, ONE OF THE X VARIABLES (wing length, OR, wing width, OR stem length, etc.)OR, wing width, OR stem length, etc.)

• Drop each of the three chosen designs 10 Drop each of the three chosen designs 10 times recoding flight time and record the times recoding flight time and record the data.data.

• After the data has been entered into the After the data has been entered into the computer, we’ll discuss output and key computer, we’ll discuss output and key take-aways.take-aways.

Page 94: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9494

Tests for Determining a Linear Tests for Determining a Linear Relationship : Regression Relationship : Regression AnalysisAnalysis• Null hypothesis (Ho) : There is no linear relationship Null hypothesis (Ho) : There is no linear relationship

between the response (Y) and the independent between the response (Y) and the independent variable (X).variable (X).– Note, For Regression, the Response (Y) must be continuous Note, For Regression, the Response (Y) must be continuous

and the X variable must also be continuous.and the X variable must also be continuous.

• Alternative hypothesis (Ha) : There is a linear Alternative hypothesis (Ha) : There is a linear relationship between the response and the relationship between the response and the independent variable.independent variable.

• Regression assumptions are that the data are Regression assumptions are that the data are reasonably normally distributed and the residuals are reasonably normally distributed and the residuals are normally distributed with no obvious pattern in the normally distributed with no obvious pattern in the residuals.residuals.– A residual is the difference between what was observed in A residual is the difference between what was observed in

the experiment vs. what is predicted by the model.the experiment vs. what is predicted by the model.

Page 95: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9595

Regression Example : Regression Example : Helicopter Wing LengthHelicopter Wing Length• Null Hypothesis (Ho) : There is no linear Null Hypothesis (Ho) : There is no linear

relationship between flight time and relationship between flight time and wing lengthwing length– Y/Y/X = 0X = 0– Note that wing length can be viewed as Note that wing length can be viewed as

continuous since we can measure the wing continuous since we can measure the wing length.length.

• The data have already been collected The data have already been collected from a previous experiment.from a previous experiment.

Page 96: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9696

Regression Example :Regression Example :Plot the DataPlot the Data

WL

Flig

htT

ime

3.02.52.01.51.0

3.5

3.0

2.5

2.0

1.5

S 0.392612R-Sq 19.3%R-Sq(adj) 16.4%

Fitted Line PlotFlightTime = 2.133 + 0.2272 WL

Page 97: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9797

Regression Analysis :Regression Analysis :The OutputThe Output

Regression Analysis: FlightTime versus WL

The regression equation is FlightTime = 2.13 + 0.227 WL

Predictor Coef SE Coef T P

Constant 2.1330 0.1896 11.25 0.000

WL 0.22723 0.08779 2.59 0.015

S = 0.392612 R-Sq = 19.3% R-Sq(adj) = 16.4%

Analysis of Variance

Source DF SS MS F P

Regression 1 1.0326 1.0326 6.70 0.015 WHAT IS THE

Residual Error 28 4.3160 0.1541 P-VALUE?

Total 29 5.3487

Page 98: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9898

Regression Analysis Regression Analysis Example:Example:Output DetailOutput Detail• The Linear relationshipThe Linear relationship

– Algebra days are Y = MX + BAlgebra days are Y = MX + B– Regression output is Y = B + MXRegression output is Y = B + MX

• FlightTime = 2.13 + 0.227 WLFlightTime = 2.13 + 0.227 WL

• The R-Squared StatisticThe R-Squared Statistic– R-Squared is the per cent of the variation in the R-Squared is the per cent of the variation in the

response (Y) that is explained by the model.response (Y) that is explained by the model.– Statistical packages use the method of “least Statistical packages use the method of “least

squares” which finds the best model which squares” which finds the best model which minimizes the difference between the observed minimizes the difference between the observed response and the predicted response.response and the predicted response.• R-Sq = 19.3% R-Sq(adj) = 16.4%R-Sq = 19.3% R-Sq(adj) = 16.4%

Page 99: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 9999

Regression Analysis Example:Regression Analysis Example:Output DetailOutput Detail• The ANOVA Table :The ANOVA Table :

– Analysis of VarianceAnalysis of Variance

– Source DF SS MS F PSource DF SS MS F P– Regression 1 1.0326 1.0326 6.70 0.015Regression 1 1.0326 1.0326 6.70 0.015– Residual Error 28 4.3160 0.1541Residual Error 28 4.3160 0.1541– Total 29 5.3487Total 29 5.3487

– Regression and ANOVA are VERY similar. The ANOVA table provides Regression and ANOVA are VERY similar. The ANOVA table provides the P-Value for us to test the null hypothesis.the P-Value for us to test the null hypothesis.

– P = 0.015. Hence, we reject the null hypothesis and conclude there is P = 0.015. Hence, we reject the null hypothesis and conclude there is a statistical linear relationship between flight time and wing length.a statistical linear relationship between flight time and wing length.

• The standard deviation about the regression line (S).The standard deviation about the regression line (S).– The standard deviation provides an estimate of how precise our The standard deviation provides an estimate of how precise our

observations were in the study and provides a guide on how good our observations were in the study and provides a guide on how good our predictability of future flight times will be with these wing lengths.predictability of future flight times will be with these wing lengths.

– S = 0.392612S = 0.392612

Page 100: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 100100

Regression Analysis Regression Analysis Example :Example :Validating the AssumptionsValidating the Assumptions

Standardized Residual

Perc

ent

3.01.50.0-1.5-3.0

99

90

50

10

1

Fitted ValueSta

ndard

ized R

esi

dual

2.82.72.62.52.4

2

0

-2

Standardized Residual

Fre

quency

210-1-2-3

8

6

4

2

0

Observation Order

Sta

ndard

ized R

esi

dual

30282624222018161412108642

2

0

-2

Normal Probability Plot of the Residuals Residuals Versus the Fitted Values

Histogram of the Residuals Residuals Versus the Order of the Data

Residual Plots for FlightTime

Is the Data Normally Distributed? – Use “Fat Pencil” Test. Is there an obvious

pattern in the residuals?

Page 101: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 101101

DMAIC Methodology :DMAIC Methodology :The Multi-Vari AnalysisThe Multi-Vari Analysis• Objective :Objective :

– Validate the key X’s as determined from the Validate the key X’s as determined from the FMEAFMEA

• Methodology :Methodology :– Passively observe process in its natural statePassively observe process in its natural state– Use a surveyUse a survey

• Analysis :Analysis :– Use statistical methods to validate hypothesized Use statistical methods to validate hypothesized

relationships (ANOVA, Regression, Pareto relationships (ANOVA, Regression, Pareto diagrams, etc.)diagrams, etc.)

Page 102: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 102102

DMAIC Tools Analyze : Multi-VariPassive Data Collection Planning

1. Determine Objective2. Identify Input and Output Variables to be studied3. Identify Measurement Systems for each variable

Which should be studied to assure capability?4. Determine sampling plan5. Determine data collection, formatting and storage

procedure6. Describe procedure and settings used to run process7. Assign and train Team8. Assign clear responsibilities9. Outline data analysis to be performed using the

appropriate statistical tool.

Page 103: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 103103

1. Determine stability and capability.

If the data is time oriented, use an I/MR chart

Otherwise, use a Pareto chart

2. Explore relationships among the variables.

Use ANOVA, Regression or another appropriate statistical tool

3. Draw conclusions: Which input (X) variables are associated with variability in the output (Y)?

Passive Data Collection : Data Analysis Steps

Page 104: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 104104

Multi-Vari Key ChallengesMulti-Vari Key Challenges

• Data only represent one moment in time. Data only represent one moment in time. Beware of false hidden relationships.Beware of false hidden relationships.– Ice cream sales and total car miles driven per Ice cream sales and total car miles driven per

monthmonth

• Lack of PlanningLack of Planning– Who will collect what informationWho will collect what information– Is it the right informationIs it the right information

• KISSKISS– Do not overanalyze data. Do not overanalyze data.

Page 105: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 105105

DMAIC Methodology : DMAIC Methodology : The Tools : ImproveThe Tools : Improve• Process simulationProcess simulation

• Advanced statistical tools including Advanced statistical tools including Design of Experiments (DOE) and Design of Experiments (DOE) and response surface methodology.response surface methodology.

Page 106: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 106106

Design of Experiments Design of Experiments (DOE)(DOE)

• DOE is an active way to study more DOE is an active way to study more than one X variable at a time and than one X variable at a time and any corresponding interactions.any corresponding interactions.

• Two level factorial experiments are a Two level factorial experiments are a very neat special case of the DOE very neat special case of the DOE family.family.

Page 107: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 107107

Two Level Factorial Two Level Factorial ExperimentsExperiments• Each variable has two levels: low and Each variable has two levels: low and

highhigh– Two levels per variable helps minimize the total Two levels per variable helps minimize the total

number of combinationsnumber of combinations

• Notation used is 2Notation used is 2kk – k represents the number of input variables k represents the number of input variables – 2 refers to the number of levels of each input 2 refers to the number of levels of each input

variablevariable– 2233 is an example of a three variable design with 8 is an example of a three variable design with 8

runsruns

Page 108: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 108108

Calculating How Changing the Calculating How Changing the Level of Each X Affects the YLevel of Each X Affects the Y

2.25

1.80

Wing Width

Wing Length

Short Long

Narrow

Wide

1.60 2.00

2.00 2.50

Helicopter Flight Time (Sec)Average

Or, the mean effect on flight time from changing the wing length from short to long is 0.45 seconds.

Difference = 0.45

Page 109: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 109109

DOE Example : A 2DOE Example : A 233 Experiment Experiment• Null hypothesis (Ho) : Each Independent variable studied Null hypothesis (Ho) : Each Independent variable studied

(X) has no effect on the response (Y). Or, the difference (X) has no effect on the response (Y). Or, the difference between the response at the high level of X vs. the low between the response at the high level of X vs. the low level of X is 0 FOR EACH AND EVERY X IN THE level of X is 0 FOR EACH AND EVERY X IN THE EXPERIMENT.EXPERIMENT.– For each X variable : Y (at the high level of X) – Y (at For each X variable : Y (at the high level of X) – Y (at

the low level of X) = 0the low level of X) = 0• Alternative hypothesis (Ha) : There is a difference in the Alternative hypothesis (Ha) : There is a difference in the

response for any of the X’s in the experiment.response for any of the X’s in the experiment.• DOE evaluates how EACH X variable affects the response.DOE evaluates how EACH X variable affects the response.• DOE Assumes the data are from a reasonably normal DOE Assumes the data are from a reasonably normal

distribution and the residuals are normally distributed. distribution and the residuals are normally distributed. • The response must be continuous but the X’s can be The response must be continuous but the X’s can be

either continuous or discrete.either continuous or discrete.

Page 110: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 110110

DOE 2DOE 233 Example : The Example : The DataData

Wing Length Stem Length Wing Width Flight Time

-1 -1 -1 2.0

1 -1 -1 2.5

-1 1 -1 1.8

1 1 -1 2.4

-1 -1 1 2.4

1 -1 1 2.8

-1 1 1 2.1

1 1 1 2.9

-1 -1 -1 1.9

1 -1 -1 2.6

-1 1 -1 2.0

1 1 -1 2.5

-1 -1 1 2.3

1 -1 1 3.0

-1 1 1 2.1

1 1 1 3.1

Page 111: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 111111

DOE 2DOE 233 Example : The Example : The AnalysisAnalysis

Analysis of Variance for Flight Time (coded units)

Source DF Seq SS Adj SS Adj MS F P

Main Effects 3 2.27500 2.27500 0.75833 75.83 0.000

2-Way Interactions 3 0.04500 0.04500 0.01500 1.50 0.287

3-Way Interactions 1 0.04000 0.04000 0.04000 4.00 0.081

Residual Error 8 0.08000 0.08000 0.01000

Pure Error 8 0.08000 0.08000 0.01000

Total 15 2.44000

DOE is a special case of ANOVA. DOE studies several X’s at the same time in a systematic way.

P-Value = 0. Hence, for at least one of the X’s, changing from the low level of that variable to the high level of that variable statistically affected flight time. But which one(s)?

Page 112: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 112112

DOE 2DOE 233 Example : The Example : The AnalysisAnalysis

Estimated Effects and Coefficients for Flight Time (coded units)

Term Effect Coef SE Coef T P

Constant 2.40000 0.02500 96.00 0.000

Wing Length 0.65000 0.32500 0.02500 13.00 0.000

Stem Length -0.07500 -0.03750 0.02500 -1.50 0.172

Wing Width 0.37500 0.18750 0.02500 7.50 0.000

Wing Length*Stem Length 0.07500 0.03750 0.02500 1.50 0.172

Wing Length*Wing Width 0.07500 0.03750 0.02500 1.50 0.172

Stem Length*Wing Width 0.00000 0.00000 0.02500 0.00 1.000

Wing Length*Stem Length*Wing Width 0.10000 0.05000 0.02500 2.00 0.081

The P-Values are low (less than 0.05) for Wing Length and Stem Length. Therefore, conclude that each of these variables statistically affects flight time.

Page 113: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 113113

DOE 2DOE 233 Example : The Example : The AnalysisAnalysis

• Since DOE is ANOVA but for several X’s at one time, it is also VERY Since DOE is ANOVA but for several X’s at one time, it is also VERY SIMILAR to regression and the output from a DOE analysis can be SIMILAR to regression and the output from a DOE analysis can be used to predict the response (flight time) for any combination of the used to predict the response (flight time) for any combination of the X variables studied (wing length, stem length, and wing width).X variables studied (wing length, stem length, and wing width).

• Note that from the previous slide, the effects and the coefficients Note that from the previous slide, the effects and the coefficients column. The effect is the difference in the response from the high column. The effect is the difference in the response from the high level of X to the low level of X, or 1 – (-1), a 2 unit change. level of X to the low level of X, or 1 – (-1), a 2 unit change. Regression measures the change in the response per ONE unit Regression measures the change in the response per ONE unit change in X. Hence, the regression coefficients are half the effect change in X. Hence, the regression coefficients are half the effect value.value.

– Y = 2.4 + 0.32 (Wing Length) – 0.075(Stem Length) + 0.19 (Wing Y = 2.4 + 0.32 (Wing Length) – 0.075(Stem Length) + 0.19 (Wing Width)Width)

S = 0.1 R-Sq = 96.72% R-Sq(adj) = 93.85%S = 0.1 R-Sq = 96.72% R-Sq(adj) = 93.85%

Page 114: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 114114

DOE Class ExerciseDOE Class Exercise

• We are going to run and analyze a 2We are going to run and analyze a 233 design experiment. This requires design experiment. This requires making 8 different helicopters.making 8 different helicopters.

• The variables to be studied are wing The variables to be studied are wing length, wing width, and stem width.length, wing width, and stem width.

• We’ll determine who will make each We’ll determine who will make each helicopter, run and analyze the helicopter, run and analyze the experiment, and discuss the output.experiment, and discuss the output.

Page 115: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 115115

DMAIC Methodology :DMAIC Methodology :The Tools : ControlThe Tools : Control• Institutionalize updated process Institutionalize updated process

complete with Standard Operating complete with Standard Operating Procedures (SOP’s).Procedures (SOP’s).

• Control charts for critical X’sControl charts for critical X’s

• Before/After run chart Before/After run chart documenting improvementsdocumenting improvements

• Mistake Proofing the processMistake Proofing the process

Page 116: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 116116

Control Phase Control Phase

• Control plans (SOP’s) should :Control plans (SOP’s) should :– Be easy to follow.Be easy to follow.– Provide corrective action when the X’s Provide corrective action when the X’s

change.change.– Have buy-in/support of process ownerHave buy-in/support of process owner– Be audited to insure long term gainsBe audited to insure long term gains

Page 117: Proficience-SQAM-Module 9 Introduction to Six sigma

SQAM Course, Proficience, IIScSQAM Course, Proficience, IISc 117117

Some ReferencesSome References

Joseph M. Juran: Juran’s Quality Handbook Joseph M. Juran: Juran’s Quality Handbook

(McGraw-Hill, 1999)(McGraw-Hill, 1999)

Mikel J. Harry: Six Sigma, A Breakthrough Strategy for Profitability Mikel J. Harry: Six Sigma, A Breakthrough Strategy for Profitability (Quality Progress, May 1998)(Quality Progress, May 1998)

William J. Hill: Six Sigma at Allied Signal, Inc. (Presentation at 1999 Q&P William J. Hill: Six Sigma at Allied Signal, Inc. (Presentation at 1999 Q&P Research Conference, May 1999)Research Conference, May 1999)

Jack Welch: Six Sigma, the GE WayJack Welch: Six Sigma, the GE Way

Six Sigma Forum Magazine: Six Sigma Forum Magazine: www.asq.org/pub/sixsigmawww.asq.org/pub/sixsigma

Your favorite Search Engine: search on “Six Sigma”Your favorite Search Engine: search on “Six Sigma”