    COMPANY PROFILE

    E & A CONSTRUCTION(Always ahead differently)

  • 8/7/2019 Profile.doc ea

    2/26

    COMPANY PROFILE

    M/S. E&A CONSTRUCTION

    (Established in 1993)

    Address: 8/1 (3rd Floor), Block-A, Aurangazeb Road,Mohammadpur, Dhaka-1207.

  • 8/7/2019 Profile.doc ea

    3/26

    Tel: 9128614,9110207. Fax: 8116363.E-mail: [email protected], [email protected]

    INDEX

    Introduction.

    Organogram.

    Company Details at a glance.

    Forecast of Financial aspects of the firm. Experience of the firm.

    Major enlistment information.

    Sister concern of this firm and other agent with foreign Co.

    List of Technical and other personnel.

    List of machineries of the firm.

    List of ongoing project.

    Work completed for last 05 years.

    Photograph of different project executed by this firm.

    E & A C o n s t r u c t i o n

    E&

    A

    Con

    str

    uction

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/7/2019 Profile.doc ea

    4/26

    INTRODUCTION

    E&A Construction is a proprietorship and modern business concern having 19 yearsexperience. Our achieved experience is quite healthy, shinning and significant. We put our firststep with construction work (Civil & Electrical) assuring best quality all times. Beside our differentconstruction line and equipments supply business experience we tried to put our next step toelectrical transmission and construction work. After that we looked front and gathered theexperience in supply (Local & international shopping), trading and other business. Now we areorganized with smart, talented and dedicated set up in civil, electrical and construction technicapersonnel, couple of spontaneous marketing hands with required strength. Our motto is to serveour clients and principals up to their desired level.

    At present we are representing two Chinese and one Indian companies as their exclusive partner.Our expanded business with foreign delegation is impressive and we are enjoying cordiacooperation.

    Adhering to the principal of Quality, Service and Credit the firm will continue its job withreliable service of high quality and fulfillment of business commitment.

    We hope our upgrading performance as well as rich business figures in every step.

    E & A C o n s t r u c t i o nE & A C o n s t r u c t i o n

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    5/26

  • 8/7/2019 Profile.doc ea

    6/26

    Company Details at a glance:Company Name : M/S. E&A Construction

    Type : Proprietorship.

    Name of Proprietor : Md. Sarwar Ezaz

    Established : 1993.

    Location : Trader.

    Nature of business : Importer, Supplier, Bidder and Construction

    Firm.

    Name of enlisted organization : BPDB, DESA, REB, WAPDA, R&H, LGED, DGDP,

    Education Engineering Dept., District Council (DC).

    Value of work : 100 Million (DESA, BPDB, EPZ etc.)

    (Completed for last 03 years)

    Value of work in hand : 400 Million

    Bankers Name : Eastern Bank Limited, Gulshan Branch, Dhaka.

    Phone:

    Trust Bank Limited, Gulshan Branch, Dhaka.

    Phone: 8815594, 8828088.

    Phone No. : 8116363, 9128614

    Fax No. : 9110207

    E-mail : [email protected],

    [email protected]

    Profile of E & A construction

    (up dated up to June, 2006)

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/7/2019 Profile.doc ea

    7/26

    FINANCIAL STATEMENT FOR LAST FIVEYEARS

    SL.No.

    Year 2001 2002 2003 2004 2005

    1 Total assets 83,98,967/- 1,11,43,599/- 98,69,203/- 1,04,30,543/- 1,46,30,621/-

    2 Current asset 72,28,470/- 96,91,455/- 71,85,814/- 79,29,253/- 1,17,80,694/-

    3Currentliabilities

    6,63,405/- 27,36,316/- 10,69,984/- 98,560/- 25,54,048/-

    4Profit beforeTaxes

    25,99,272/- 25,50,628/- 22,95,324/- 24,26,752/- 56,48,120/-

    5Profit afterTaxes

    19,92,454/- 19,81,721/- 17,98,993/- 19,17,564/- 43,33,590/-

    FINANCIAL STATEMENT FOR LAST FIVEYEARS

    (In Million US$)

    SL.No.

    Year 2001 2002 2003 2004 2005

    1 Total assets 0.182 0.241

    2 Current asset 0.157 0.210

    3Currentliabilities

    0.011 0.047

    4Profit beforeTaxes

    0.056 0.055

    5Profit afterTaxes

    0.043 0.043

    Profile of E & A Construction

    up dated up to June, 2006

  • 8/7/2019 Profile.doc ea

    8/26

    List of ongoing projectsSl.No

    Name of work Work Order No

    Name ofOrga

    n.

    TotalValue

    Dateof

    Completion

    01

    Construction of1st and 2nd floorof existing onestoried factorybuilding at IEPZ,

    Paksey, Pabna.

    Work order no:BEPZA/CE/IEPZ/CC-69/112Date: 15.05.2006

    BEPZA

    2,05,04,326.37

    Ongoing.

    02

    Extension of 3rd

    floor (BuildingNo-5) of Existingfour storiedfoundation threestoried factorybuilding at DhakaEPZ Extension

    Area.

    Work order no:BEPZA/CE/DEPZ/CR/333/107Date: 14.05.2006

    BEPZA

    1,56,15,576.32

    Ongoing.

    03

    Development ofDrain repair bothside of mainroad, footpath ofWest side of oldzone at DhakaEPZ.

    Work order no:BEPZ/CE/DEPZ/CR/330/113Date: 15.05.2006

    BEPZA

    16,38,643.66

    Ongoing

    04

    Laxmipur office

    Building. 9-TownPowerDistributionProject Division-3

    Work order No: 9-Town/ Feni-3/111Date: 28/03/04

    PDB 15,75,596 Ongoing

    05 Modernization ofExisting 20polytechnic

    Work order:XEN/EED/CHAND,ZONE/1151/15

    EED 1,60,59,872.89

    Ongoing.

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    9/26

    Institute andEstablishment ofNew 18Polytechnic

    Institute.

    06

    Maintenance of33/11 KV substation, 11 KVswitchingstations (MSS)

    Work order No:DESCO/CS/BidNotice No:08/2005/2006/675

    DESA39,84,580.

    90Ongoi

    ng.

    Total=5,95,78,599.24

    Work completed for last 05 years

    Work/Supply Executed By M/S. E &AConstruction For The Year 2001

    Sl.No.

    Name of WorkWork

    Order No.

    Nameof

    Organ.

    WorkValue

    Date ofcomple

    tion

    1

    Work order fortrehabilitation of flooddamaged line underBasundhara Baridhara33 Kv overhead feeder.

    XEN/Div-6/BL-

    30/4.02/2001/27Dt:15.01.01 .

    DESA 50,15,942.03

    15.01.2001

    2Construction work of Ctype building in DhakaEPZ Residential Area.

    BEPZA/CE-11/99/559Dt.12/10/2000

    BEPZA 56,48,032.98

    15.07.2001

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    10/26

    Sl.No.

    Name of WorkWork

    Order No.

    Nameof

    Organ.

    WorkValue

    Date ofcomple

    tion

    3

    Construction work of 2

    Storied zone servicebuilding at IEPZ,Pakshey, Pabna.

    BEPZA/CE-

    11/19/593Dt.23.10.2000

    BEPZA 1,99,84,499.01

    09.11.2001

    4

    Construction ofBoundary wall andSewerage Drain atresidential area of DPHParibagh under civilworks div., DESA.

    XEN/Civil/99/2.05/66.Date:22/08/99

    DESA52,43,247.

    6131/11/2

    001

    5.

    Conversion work of residential building as

    office building of commercial director sdept. I Khilgaon 33/11 KVSub-station under GreaterDhaka Electric SupplyProject.

    Ex.En./DD-4/2001/2.05/39Date:14.03.2001

    DESA24,29,371.04

    23.06.01

    6.

    Construction of 2nd & 3rd

    floor at Paribagh DPH 1000sq.ft. Residential areaunser Greater DhakaElectric supply Project.

    Ex.En./DD-5/2001/2.01/27Date:31.01.2001

    DESA34,45,915.46

    07.08.2001

    7.

    Extension work of Jinjira

    P.M. Pilot Girls HighSchool;.

    Facilities Dept.

    16,62,500.00

    24.12.2001

    8.

    Repair, service andsupply of spare parts forair-condition system atground, 2nd & 3rd floor inDESA office

    Ex.En./DD-5/2001/2.01/120Date:30.05.2001

    DESA13,02,032.55

    07.02.2002

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    11/26

    Sl.No.

    Name of WorkWork

    Order No.

    Nameof

    Organ.

    WorkValue

    Date ofcomple

    tion

    9.Supply of 11KVLightning Arrester.

    Tender

    EnquiryNo:23/ER-3/LightingArresterDt:23.05.2001

    DESA9,09,990.0

    025/09/2

    001

    10.

    Supply of Jointingmaterials andtermination kits.

    TenderEnquiry No.30/O&M/Fuse &Access.

    DESA17,69,576.

    50

    11.

    Supply of LightingArrester.

    TenderEnquiry no.245/2001/Rev./Lot-2Dt:21.05.2001

    BPDB28,20,000.

    0023/09/2

    001

    12.

    Supply of 11 KV PinInsulator

    TenserEnquiry No.Barins/Raj/13/2001-

    2002Dt:12.11.2001

    BarindraMultipleDevelo

    p.Authority

    11,34,000.00

    12/02/2002

    Total=5,13,65,107.18

  • 8/7/2019 Profile.doc ea

    12/26

    Work/Supply Executed By M/S. E &AConstruction For The Year 2002

    Sl.N

    o.

    Name of WorkWork Order

    No.

    Nameof

    Orga

    n.

    WorkValue

    Date ofcomplet

    ion

    1Supply of 11 kVLighting Arrester (1000Nos.)

    23/ER-3/LightingArresterDt.11.09.2001

    DESA9,09,990.0

    009.01.2002

    2Supply of 10.5 kVLighting Arrester (1500Nos.)

    25/O&M/ DOF& LADt.16.10.2001

    DESA14,39,625.

    0013.02.2002

    3

    Construction work of1000 Sft completeresidential buildingwith 5-storiedfoundation at DPHParibagh area underDESA.

    XEN.Civil/01/2.05/66Dated:02/08/01

    DESA1,89,98,238.

    0015.02.20

    02

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    13/26

    Sl.No.

    Name of WorkWork Order

    No.

    Nameof

    Organ.

    WorkValue

    Date ofcomplet

    ion

    4Supply of 11 kV PinInsulator with Pin.

    BMDA/BDEP-50/2001 Dt.31.12.2001

    B M DA

    11,34,000.00

    31.03.2002

    5

    Supply of Jointingmaterials and Fuse &Accessories ( For Lot-1)

    30/O&M/Fuse&Accessories.Dated:10.02.2002

    DESA17,69,576.

    5010.06.20

    02

    6

    Supply of 11 kV PinInsulator with Pin and11 kV Disc Insulator

    with Fittings

    35/ Phase-IV/InsulatorDt.

    17.02.2002

    DESA80,37,000.

    0017.06.2002

    7Supply of 11 kV DOF,11 kV Fuse and 9 kVSurge Arrester.

    32/Phase-IV/DOFDt.17.02.2002

    DESA35,68,200.

    0017.06.2002

    8

    Supply of 11 kV PinInsulator with Pin &Disc Insulator withfittings

    Pur-18T/66/2001Dt. 10.06.02

    BPDB30,29,775.

    0008.10.2002

    Sl.No.

    Name of WorkWork Order

    No.

    Nameof

    Organ.

    WorkValue

    Date ofcomplet

    ion

    9.

    Construction ofBoundary wall andSewerage Drain at

    residential area of DPHParibagh under civilworks div., DESA.

    XEN/Civil/99/2.05/66.Date:22/08/9

    9

    DESA52,43,247.

    6131/11/20

    01

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    14/26

    Sl.No.

    Name of WorkWork Order

    No.

    Nameof

    Organ.

    WorkValue

    Date ofcomplet

    ion

    Total=4,41,29,652.

    11

    Work/Supply Executed By M/S. E &AConstruction For The Year 2003

    Sl.No.

    Name of WorkWork

    Order No.

    Nameof

    Organ.

    WorkValue

    Date ofcomple

    tion

    1.Construction ofboundary wall at main

    custom fencing.

    BEPZA/CE-12/03/350.

    Dt:22/02/03

    BEPZA35,13,129.

    93

    20/06/2

    003

    2.33/11 KVA , 20/28 MVA& 10/14 MVA PowerTransformer Supply

    Work No:PS-3 Pur-

    2/20Date:20/11/2002

    DESA2,70,00,000.00

    20/03/03

    3.

    Construction work of3000 Sft 5-Storiedresidential building atKamlapur 33/11 kv Sub-

    station area underDESA.

    XEN/civil/01/2.03/493Dt:

    22/10/2002

    DESA

    1,36,63,412.00

    20.04.2003

    4.

    Electricity networkdevelopment work atChashara crossing toKillarpole crossing underS&D division,Narawangang , DESA

    XEN/DD-4/03-04/2.05/16.Dated:07/02/04.

    DESA56,45,457.18

    17.05.2003

  • 8/7/2019 Profile.doc ea

    15/26

    Sl.No.

    Name of WorkWork

    Order No.

    Nameof

    Organ.

    WorkValue

    Date ofcomple

    tion

    Total=

    4,98,21,999.11

    Work/Supply Executed By M/S. E &A

    Construction For The Year 2004

    Sl.No.

    Name of WorkWork Order

    No.

    Name ofOrga

    n.

    WorkValue

    Date ofcomplet

    ion

    01

    Construction of 33/11 KVS/S Control room oflaxmipur with othersrelevent works under Fenigroup-3, 9-townelectricity/distribution/supply projectdivision-3, BPDB.

    Work OrderNo.: 9 TownElec.Supp.Proj.BBPDB/2003Admin-23/ 1922.Dated:01/07/2003

    BPDB 70,31,713.00

    15/02/04

    02

    Construction of ElectricitySupply office building at

    Laxmipur under 9-TownPow. Distr. Project, Division-3, BPDB, Feni.

    Work OrderNo.: 9Town/Feni-

    3/Work Order-7/2004/109.Dated:28/03/2004.

    BPDB

    38,03,085.00 04/09/04

    03Construction work ofLaxmipur Women hostelbuilding at Laxmipur .

    Work OrderNo.:XEN/EED/Chad/Zone/713,

    EED60,55,711

    .00

    15/10/04

    Profile of E & A Constructio

    (up dated up to June, 2006

  • 8/7/2019 Profile.doc ea

    16/26

    Dated :05/11/2003.

    04

    Renewal & Rehabilitation of11 KV/0.4 Kv line

    distribution sub-station forsupplying of 11/0.4/0.235KV line at progoti road,baishmara road and Lastportion of Ramgoti road(Partial) of Dokkhintemohoni feeder laxmipurtown under 9-town Pow.Distri. Project BPDB, Feni.

    Work OrderNo.: 9 Town/Feni-3/WorkOrder-7/2004/114Dated:28/03/2004

    BPDB

    15,55,773.00

    05/08/04

    05.

    Renewal & Rehabilitation of11 KV/0.4 Kv line

    distribution sub-station for11K/0.4/0.235 KV lineSupply at Dokkhin Bazar,Puraton Adalat area andMobarak colloni area oflaxmipur town under 9-town Pow. Distri. ProjectBPDB, Feni.

    Work Order

    No.: 9 Town/Feni-3/WorkOrder-7/2004/111Dated:28/03/2004

    BPDB

    15,75,596.00 01/09/04

    Sl.N

    o.

    Name of WorkWork Order

    No.

    Name ofOrga

    n.

    Work ValueDate of

    completion

    06Supply of 33/11 KV 20/28MNA Power transformer.

    PS-3/-2/15Date:

    07/12/2004DESA

    3,96,00,000.00

    07/06/2005

    07

    Construction of securitywall, 9- Town Laxmipur33/11KV sub station switchyard & construction area.

    9-Town/Feni-3/W.O

    7/2004/420PDB

    1,04,465.00

    26/02/2005

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    17/26

    08

    Notification of electricitydistribution networkdevelopment from chasercrossing to killolpurcrossing under

    Narayangang sales anddistribution area.

    XEN/DD-4/03-04/2.01/25

    Date:17/05/04

    PDB3,98,462.0

    023/06/20

    05

    Total=5,41,24,805.0

    0

    Work/Supply Executed By M/S. E &AConstruction For The Year 2005

    Profile of E & A Constructio

    (up dated up to June, 2006

  • 8/7/2019 Profile.doc ea

    18/26

    Sl

    .No.

    Name of Work Work OrderNo.

    Nam

    e ofOrga

    n.

    WorkValue

    Date

    ofcompletion

    01

    Construction of 600 Sft2-units3-storied building atTongi under Tongi 80MW GTPS Project..

    Work OrderNo.: Tongi 80MWGTPS/2004/363.Dated:

    02/06/2004.

    BPDB 54,80,521.80

    04/02/04.

    02

    Construction of

    Acadimic Building(Part-2) at Laksmipur

    Polytechnic Institute.

    Work Order No:X-EN/EED/CHAND/ZONE/1151/15Dated:28/12/04

    EED 1,60,59,87

    2.89

    28/12/0

    5

    03

    Construction ofBoundary wall verticalextension at 9- Town,Laxmipur Division-3,Feni.

    9-Town/Feni-3/W.O-7/05/87Date:16/04/2005

    PDB1,96,370.00

    14/05/2005

    04

    Repair of Boundarywall in 9-Town ,

    Laxmipur Division-3,Feni.

    9 Town/ Feni-3/W.O-7/05/88

    16/04/2005PDB

    1,99,320.0

    0

    14/05/200

    5

    05

    Construction of Mainsecurity gate & watersupply at officebuilding and substation in 9-TownLaxmipur, Feni.

    9-Town/Feni-3/W.O-7/05/95Date:23/04/2005

    PDB1,92,112.50

    20/05/2005

    06

    Construction of Guardwall at residential area& office area in 9-Town

    Laxmipur, Division-3,Feni.

    9-Town/Feni-3/W.O-7/05/106Date:27/04/2005

    PDB1,99,705.0

    0

    25/05/2005

  • 8/7/2019 Profile.doc ea

    19/26

    07

    Construction ofresidential Building in 9Town, Laxmipur,Division-3, sels &Division-3 Feni

    Sales & Distributiondivision.

    9-Town/Feni-3/W.O-7/05/316Dt: 18/10/2005

    PDB24,00,000.00

    27/06/2006

    Total=2,47,27,902.19

    List of enlistment in various organizations

    Sl.No.

    Name of Dept. Status of Enlistment Validity

    01 Dhaka Electric Supply Authority (DESA) A Class July 2007

    02 Power Development Board (BPDB) A Class July 200703 Roads & Highway Department (R&H) G/2 Category July 2007

    04 Water Development Board (WDB) G/2 Category July 2007

    05 Local Government Eng. Dept. (LGED) Special Class July 2007

    06 Facilities Dept. A Class July 2007

    07 District Council (DC) A Class July 2007

    08 Directorate General Defense Purchase (DGDP) July 200709 Electrical A, B, C July 2007

    OrganogramProprietor

    General Manager (Admin) Manager (Finance) General Manager (Technical)

    Manager (HRD) Chief Accountant Asstt.Engineer

    (Electrical)

    Asstt. Engineer(Civil)

    CommunicationExecutive

    OfficeExecutive

    Accounts Officer Sub-Asstt.Engineer

    (Electrical)

    Sub-Asstt.Engineer

    (Civil)

    Profile of E & A Constructio

    (up dated up to June, 2006

  • 8/7/2019 Profile.doc ea

    20/26

    ComputerOperator

    OfficeAssistant

    Cashier SiteExecutive(Electrical)

    Site Executive(Civil)

    Technical Personnel of the firm

    Position Name Qualifications Years ofExperien

    ce(General)

    Years ofExperien

    ce(In

    proposed

    position)Project Manager Md. Abdul Barek B.Sc. Engg.

    (Civil.)14 10

    Project Manager Tapan KumarSarker

    B.Sc. Engg.(Civil.)

    06 04

    Project Engineer MohammedEmdadul karim

    Diploma Engg.(Civil)

    08 05

    Asst. Engineer(Civil)

    Md. Liton Azad Diploma Engg.(Civil)

    06 05

    Asst. Engineer(Elec.)

    Md. Maruf Hossain B.Sc. Engg.(Elec.)

    01 01

    Astt. Engineer Md. Nuruzzaman Diploma Engr(Elec)

    14 10

    Sub-Asst. Engineer(Civil)

    Md. MasudurRahman

    Diploma Engg.(Civil)

    04 03

    Sub-Asst. Engineer(Civil)

    Abdul Based Miah Diploma Engg.(Civil)

    10 05

    PlumberSaydur RahmanKhan

    Class-Vlll 06 05

    Md. MahfujulHaque

    Class- lX 09 05

    Md. IftekharulAhmed

    Class-Vlll 10 08

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    21/26

    List of Office equipment and logisticsof E&A Construction

    Sl.No.

    Description Model/NameQuantit

    yRemarks

    01

    Office

    S

    p

    a

    ce

    Location of 8/1 (3rd Floor), AurangazebRoad, Mohammadpur, Dhaka-1207.

    3000 sft. In Order

    02Computerwith printer

    Intel Pentium I & III, Laptop (ACER)Pentium III with HP Deskjet 610 c

    4 Nos.

    03 Printer Printer-Canon Laser LBP 1120, HPDeskjet 610C, Canon BJC 265 SP,Canon S200SPX

    4 Nos.

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    22/26

    04 Scanner UMAX Astra 2100s,Canon N640P

    2 Nos.

    05Photo Copier

    MachineToshiba-1370

    1 Nos.

    06Internet

    Connection

    BOL (2 Nos.), VHSNET (1 No),

    ProshikaNet (1 No)

    4 Nos.

    07 Fax Machine Olympia OX 500 1 Nos.

    08 Air Cooler American Air, General, Singer 4 Nos.

    09Office

    FurnitureChair Table, Conference chair/tablesets, computer table and others

    40 Nos.

    10 Genertors YongDong, 2 KVA 2 Nos.

    11 Telephone

    a) 8116363b) 9128614c) 9110207d) 9711381

    4 Nos.

    12 Motor Car

    a) Toyota (Jeep) 1500 cc (1999)

    Dhaka-Metro-Ga-15-6790b) Toyota (Platz) 1300 cc (Car)Dhaka-Metro-Ga-15-1259

    c) Toyota (Micro bus) 2430 cc (1997)Dhaka-Metro-Ga-11-3858

    3 Nos.

    13 Pick UpToyota (1.5 Ton) 1995Dhaka-Metro-Ma-1049

    1 Nos.

    14 Motor CycleHonda-125 ccLML-150 ccDELIM-100 cc

    3 Nos.

    Sister Concern of E&A Construction

    1. SEMP Trading Co.8/1 (3rd Floor), Aurangazeb Road,Mohammadpur,Dhaka-1207.

    2. Consortium of Razon Associates and E&A Construction

    82 (2nd Floor), Outer Circular Road,Moghbazar,Dhaka-1217.

    3. Priti International47-A, Balaram Bose Lane(1st Floor),Kolkata,

    Profile of E & A Construction

    (up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    23/26

    India.

    4. SUMEC.

    5. LONGGUANG.

    6. Other (Battery and Companies).

    Legal Documents

    Tread License.

    Vat Certificate.

    TIN.

    IRC/ERC.

    ABC License.

    Other Certificate.

    Profile of E & A Construction(up dated up to June, 2006)

  • 8/7/2019 Profile.doc ea

    24/26

    Financial Document

    Bankers Name:

    Eastern Bank:

    Phone No:

    Trust Bank:Phone No:

    Bank Solvency : Attached

    Bank Statement: Attached

    Liquid Assets : Attached

    Auditors Report: Attached

    Bank Guarantee: Attached

    Profile of E & A Construction