Page 1: PROGRAMMABLE LOGIC by Hites Khatri

Programmable Logic Controllers Feel The Automation Anyone can learn The Basics. Hitesh Khatri 7/25/2013

Page 2: PROGRAMMABLE LOGIC by Hites Khatri

2

TABLE OF CONTENTS

Introduction....................................................................................................................... 5

Subject..................................................................................................................................5

Purpose.................................................................................................................................6

Plan of Development............................................................................................................6

PLC History........................................................................................................................7

PLC History.........................................................................................................................7

Hard-Wired Relay Comparison............................................................................................8

PLC Components.............................................................................................................11

Definition............................................................................................................................11

Components........................................................................................................................11

PLC Operation....................................................................................................................13

Ladder Logic.....................................................................................................................16

Definition...........................................................................................................................16

Comparison to Relay Logic.................................................................... ...........................16

Ladder Logic Programming............................................................................................21

Introduction........................................................................................................................21

Basic AND & OR Gates.....................................................................................................22

Basic Timers and Counters.................................................................................................23

Building a PLC/Ladder Logic Program.............................................................................25

SCADA…………………………………………………………………………………..34

Features of scada…………………………………………………………………………34

Usefulness of scada………………………………………………………………………36

General terminology of scada…………………………………………………………….37

Miscellaneous links………………………………………………………………………37

Animation links…………………………………………………………………………..38

Trends in SCADA……………………………………………………………………….38

Security issues………………………………………………………………………………………………………………39

Conclusion.........................................................................................................................42

Summary............................................................................................................................42

Closing Summary...............................................................................................................43

BIBLOGRAPHY………………………………………………………………………44

Page 3: PROGRAMMABLE LOGIC by Hites Khatri

3

LIST OF FIGURES

Figure 1: Typical Small Scale Control Panel.......................................................................8

Figure 2: Typical PLC Control Panel...................................................................................9

Figure 3: PLC Components Diagram.................................................................................12

Figure 4: PLC Scan Diagram.............................................................................................14

Figure 5: Basic Ladder Logic Program..............................................................................16

Figure 6: Electromechanical Relay....................................................................................17

Figure 7: Basic Relay Logic Circuit...................................................................................18

Figure 8: Relay Logic Circuit with Jog function added.....................................................18

Figure 9: Relay Logic Circuit with Jog function and Status Indicators.............................19

Figure 10: Complex Ladder Diagram................................................................................20

Figure 11: Simplified Logic Circuit...................................................................................21

Figure 12: Simplified AND gate........................................................................................22

Figure 13: Simplified OR gate...........................................................................................23

Figure 14: On-Delay Timer (RTO)....................................................................................24

Figure 15: Up Counter........................................................................................................24

Figure 16: Ladder Diagram in Relay Logic.......................................................................25

Figure 17: Relay Diagram with overload removed............................................................25

Figure 18: Relay Circuit with Addition of Jog Function....................................................26

Figure 19: Relay Circuit with Addition of Status Indicators..............................................26

Figure 20: Relay Logic Diagram Converted to PLC Ladder Logic...................................27

Page 4: PROGRAMMABLE LOGIC by Hites Khatri

4

ABSTRACT

This report answers basic questions that may be posed by anyone in the Electrical

Engineering field, including electrical engineering technicians and electricians. The

reader does not need to have any background in controls or ladder logic; only an interest

in how PLCs work and a basic understanding of digital logic. The questions that will be

answered in this report are:

1. What is a PLC?

2. What is ladder logic?

3. What are the different PLC components?

4. How does ladder logic work?

5. How does a PLC system work in conjunction with everything else?

6. How do you program a ladder logic program?

In order to answer all of these questions, I have relied on my personal knowledge of

programmable logic controllers and ladder logic along with my work experience with

them.

This report provides the reader with information on: 1) programmable logic history and

the advancement of controls technology along with PLC operation, 2) PLC components,

3) ladder logic, and 4) ladder logic programming.

Page 5: PROGRAMMABLE LOGIC by Hites Khatri

5

1. Introduction

1.1. Subject

Programmable logic controllers (PLCs) have become the most predominant control

elements for the discrete event control of a mechatronics system. Simplification of

engineering and precise control of manufacturing process can result in significant cost

savings. The most cost-effective way which can pay big dividends in the long run is

flexible automation; a planned approach towards integrated control systems. It requires a

conscious effort on the part of plant managers and engineers to identify areas where

automation can result in better deployment and/or utilization of human resources and

savings in man-hours or down time. Controls automation need not be high ended and

extremely sophisticated; it is the phased, step-by-step effort to automate, employing

control systems tailored to one’s specific requirements that achieves the most attractive

results. This is where programmable logic controls have been a breakthrough in the field

of automation and control techniques. This report looks at the role PLCs play in these

techniques.

A constant demand for better and more efficient manufacturing and process machinery

has led to the requirement for higher quality and reliability in control techniques. With the

availability of intelligent, compact solid state electronic devices, it has been possible to

provide control systems that can reduce maintenance, down time and improve

productivity to a great extend. By installing an efficient and user friendly electronics

systems for manufacturing machinery or processors, one can obtain a precise and reliable

means for producing quality products. One of the latest techniques in solid state controls

that offers flexible and efficient operation to the user is programmable controllers. The

basic idea behind these programmable controllers was to provide means to eliminate high

cost associated with inflexible, conventional relay controlled systems.

Programmable controllers offer a system with computer flexibility that is suited to

withstand the harsh industrial environment, has simplicity of operation/readability, can

reduce machine down time and provide expandability for future and is able to be

maintained by plant technicians.

Page 6: PROGRAMMABLE LOGIC by Hites Khatri

6

1.2. Purpose

This report is an informative overview of the purpose of programmable logic controllers

and ladder logic. Due to the complexity of programmable logic controllers and ladder

logic, only the basic operation and programming will be discussed. Prior knowledge of

basic electrical circuitry, controls, and computer programming is suggested before

reading this report.

In order for the reader to better understand this report, the following questions will be

explained:

1. What is a PLC?

2. What is ladder logic?

3. What are the different PLC components?

4. How does ladder logic work?

5. How does a PLC system work in conjunction with everything else?

6. How do you program a ladder logic program?

1.3. Plan of Development

To answer these questions, the report will include the following sections:

1. Programmable Logic History: This section will discuss the history and advancement of

controls technology, with a comparison of programmable logic controllers and hard-wired

relays. It will also discuss PLC operation.

2. PLC components: This section will define what programmable logic is and describe all

hardware associated with it.

3. Ladder Logic: This section will cover ladder logic and its general progression from

relay logic.

4. Ladder Logic Programming: This section will cover basic programming techniques and

their implementation.

Page 7: PROGRAMMABLE LOGIC by Hites Khatri

7

2. Programmable Logic History

2.1. PLC History

PLCs were first introduced in the 1960’s. The primary reason for designing such a device

was eliminating the large cost involved in replacing the complicated relay based machine

control systems. Bedford Associates (Bedford, MA) proposed something called a

Modular Digital Controller (MODICON) to a major US car manufacturer. The

MODICON 084 brought the world's first PLC into commercial production.

When production requirements changed so did the control system. This becomes very

expensive when the change is frequent. Since relays are mechanical devices they also

have a limited lifetime because of the multitude of moving parts. This also required strict

adhesion to maintenance schedules. Troubleshooting was also quite tedious when so

many relays are involved. Now picture a machine control panel that included many,

possibly hundreds or thousands, of individual relays. The size could be mind boggling not

to mention the complicated initial wiring of so many individual devices. These relays

would be individually wired together in a manner that would yield the desired outcome.

The problems for maintenance and installation were horrendous.

These new controllers also had to be easily programmed by maintenance and plant

engineers. The lifetime had to be long and programming changes easily performed.

They also had to survive the harsh industrial environment. The answers were to use a

programming technique most people were already familiar with and replace mechanical

parts with solid-state ones which have no moving parts.

Communications abilities began to appear in approximately 1973. The first such system

was Modicon's Modbus. The PLC could now talk to other PLCs and they could be far

away from the actual machine they were controlling. They could also now be used to send

and receive varying voltages to allow them to use analog signals, meaning that they were

now applicable to many more control systems in the world. Unfortunately, the lack of

standardization coupled with continually changing technology has made PLC

communications a nightmare of incompatible protocols and physical networks.

The 1980’s saw an attempt to standardize communications with General Motor's

manufacturing automation protocol (MAP). It was also a time for reducing the size of the

Page 8: PROGRAMMABLE LOGIC by Hites Khatri

8

PLC and making them software programmable through symbolic programming on

personal computers instead of dedicated programming terminals or handheld

programmers.

The 1990’s saw a gradual reduction in the introduction of new protocols, and the

modernization of the physical layers of some of the more popular protocols that survived

the 1980's. PLCs can now be programmable in function block diagrams, instruction lists,

C and structured text all at the same time. PC's are also being used to replace PLCs in

some applications. The original company who commissioned the MODICON 084 has

now switched to a PC based control system.

2.2. Hard Wired Relay Comparison

At the outset of industrial revolution, especially during sixties and seventies, relays were

used to operate automated machines, and these were interconnected using wires inside the

control panel. In some cases a control panel covered an entire wall. To discover an error

in the system much time was needed, especially with more complex process control

systems. On top of everything, a lifetime of relay contacts was limited, so some relays

had to be replaced. If replacement was required, machine had to be stopped and

production as well. Also, it could happen that there was not enough room for necessary

changes. A control panel was used only for one pa rticular process, and it wasn’t easy to

adapt to the requirements of a new system. As far as maintenance, electricians had to be

very skillful in finding errors. In short, conventional control panels proved to be very

inflexible. Typical example of conventional control panel is given in the following

picture.

Figure 1: Typical Small Scale Control Panel

Page 9: PROGRAMMABLE LOGIC by Hites Khatri

9

In Figure 1 you can see a large number of electrical wires, relays, timers and other

elements of automation typical for that period. The pictured control panel is not one of

the more complicated ones, so you can imagine what complex ones looked like.

The most frequently mentioned disadvantages of a classic control panel are:

1. Large amount of work required connecting wires

2. Difficulty with changes or replacements

3. Difficulty in finding errors; requiring skillful/experienced work force

4. When a problem occurs, hold-up time is indefinite, usually long

With invention of programmable controllers, much has changed in how a process control

system is designed. Many advantages appeared. Typical example of control panel witPLC

controller is given in the following picture.

Figure 2: Typical PLC Control Panel

Advantages of control panel that is based on a PLC controller can be presented in few

basic points:

1. Compared to a conventional process control system, number of wires needed for

connections is reduced by approximately 80%

2. Diagnostic functions of a PLC controller allow for fast and easy error detection.

3. Change in operating sequence or application of a PLC controller to a different

operating process can easily be accomplished by replacing a program through a console

or using PC software (not requiring changes in wiring, unless addition of some input or

output device is required).

Page 10: PROGRAMMABLE LOGIC by Hites Khatri

10

4. Needs fewer spare parts

5. It is much cheaper compared to a conventional system, especially in cases where a

large number of Input/Output instruments are needed and when operational functions are

complex

6. Reliability of a PLC is greater than that of an electro-mechanical relay or a timer,

because of less moving parts

7. They are compact and occupy less space

8. Use of PLC results in appreciable savings in Hardware and wiring cost

Page 11: PROGRAMMABLE LOGIC by Hites Khatri

11

3. Programmable Logic Controller Components

3.1. Definition

A Programmable controller is a solid state user programmable control system with

functions to control logic, sequencing, timing, arithmetic data manipulation and counting

capabilities. It can be viewed as an industrial computer that has a central processor unit,

memory, input output interface and a programming device. The central processing unit

provides the intelligence of the controller. It accepts data, status information from various

sensing devices like limit switches, proximity switches, executes the user control program

stored in the memory and gives appropriate output commands to devices such as solenoid

valves, switches etc.

Input output interface is the communication link between field devices and the

controllers. Through these interfaces the processor can sense and measure physical

quantities regarding a machine or process, such as, proximity, position, motion, level,

temperature, pressure, etc. Based on status sensed, the CPU issues command to output

devices such as valves, motors, alarms, etc. The programmer unit provides the man

machine interface. It is used to enter the application program, which often uses a simple

user-friendly logic.

3.2. Components

The PLC mainly consists of a CPU, memory areas, and appropriate circuits to receive

input/output data. We can actually consider the PLC to be a box full of hundreds or

thousands of separate relays, counters, timers and data storage locations. They don't

physically exist but rather they are simulated and can be considered software counters,

timers, etc. Each component of a PLC has a specific function:

Input Relays (contacts) - These are connected to the outside world. They physically

exist and receive signals from switches, sensors, etc. Typically they are not relays but

rather they are transistors.

Internal Utility Relays - These do not receive signals from the outside world nor do they

physically exist. They are simulated relays and are what enables a PLC to eliminate

external relays. There are also some special relays that are dedicated to performing only

one task. Some are always on while some are always off. Some are on only once during

power-on and are typically used for initializing data that was stored.

Page 12: PROGRAMMABLE LOGIC by Hites Khatri

12

Counters - These are simulated counters and they can be programmed to count pulses.

Typically these counters can count up, down or both up and down. Since they are

simulated they are limited in their counting speed. Some manufacturers also include high-

speed counters that are hardware based. We can think of these as physically existing.

Timers - These come in many varieties and increments. The most common type is an on-

delay type. Others include off-delay and both retentive and non-retentive types.

Increments vary from 1 millisecond through 1 second.

Output Relays (coils) - These are connected to the outside world. They physically exist

and send on/off signals to solenoids, lights, etc. They can be transistors, relays, or triacs

depending upon the model chosen.

Data Storage - Typically there are registers assigned to simply store data. They are

usually used as temporary storage for math or data manipulation. They can also typically

be used to store data when power is removed from the PLC. Upon power-up they will still

have the same contents as before power was removed.

Figure 3: PLC Components Diagram

A counter is a simple device intended to do one simple thing - count. Using them can

sometimes be a challenge however because every manufacturer seems to use them a

different way. There are several different types of counters. There are up-counters called

Page 13: PROGRAMMABLE LOGIC by Hites Khatri

13

CTU CNT, or CTR that only count up, such as 1, 2, and 3. There are also down counters

called CTD that only count down, such as 9, 8, 7, etc. In addition to these two, there are

up-down counters, typically called UDC (up-down counter). These count up and/or down

(1,2,3,4,3,2,3,4,5,...).

A timer is an instruction that waits a set amount of time before doing something. As usual

in industry, different types of timers are available with different manufacturers. The most

common type of timer is an On-Delay Timer. This type of timer simply delays turning on

its respective output. In other words, after our sensor (input) turns on we wait “x” number

of seconds before activating a solenoid valve (output). This is the most common timer. It

is often called TON (timer on-delay), TIM (timer) or TMR (timer). Another type of timer

is an Off-Delay Timer. This type of timer is the opposite of the ondelay timer listed

above. This timer delays turning off its respective output. After a sensor (input) sees a

target we turn on a solenoid (output). When the sensor no longer sees the target we hold

the solenoid on for x number of seconds before turning it off. It is called a TOF (timer

off-delay) and is less common than the on-delay type listed above. Very few

manufacturers include this type of timer, although it can be quite useful. The last type of

timer is a Retentive or Accumulating timer. This type of timer needs 2 inputs. One input

starts the timing event (i.e. the clock starts ticking) and the other resets it. The on/off

delay timers above would be reset if the input sensor wasn't on/off for the complete timer

duration. This timer however holds or retains the current elapsed time when the sensor

turns off in mid-stream. For example, we want to know how long a sensor is on for during

a 1 hour period. If we use one of the above timers they will keep resetting when the

sensor turns off/on. This timer however, will give us a total or accumulated time. It is

often called an RTO (retentive timer) or TMRA (accumulating timer).

3.3. PLC Operation

A PLC works by continually scanning a program. We can think of this scan cycle as

consisting of 3 important steps. There are typically more than 3 but we can focus on the

important parts and not worry about the others. Typica lly the others are checking the

system and updating the current internal counter and timer values. The first type of

scanning, as shown in the diagram below, is not as common as the type that will be

discussed second.

Page 14: PROGRAMMABLE LOGIC by Hites Khatri

14

Figure 4: PLC Scan Diagram

The first step is to check the input status. This step is therefore generally referred to as the

“Check Input Status” stage. First the PLC takes a look at each input to determine if it is

on or off. In other words, is the sensor connected to the first input on? How about the

second input? How about the third? This goes on and on through the entire program. It

records this data into its memory to be used during the next step.

Next the PLC executes your program one instruction at a time, called the “Execute

Program” stage. For example, if your program said that if the first input was on then it

should turn on the first output. Since it already knows which inputs are on/off from the

previous step it will be able to decide whether the first output should be turned on based

on the state of the first input. It will store the execution results for use later during the

next step.

Finally the PLC updates the status of the outputs. It updates the outputs based on which

inputs were on during the first step and the results of executing your program during the

second step. Based on the example in step 2 it would now turn on the first output because

the first input was on and your program said to turn on the first output when this

condition is true.

A new style of scanning has been implemented in the more recent years, called “rung

scanning”. This type basically scans each ladder rung individually in the entire ladder

logic program, updating the outputs on that rung after scanning through the inputs. This

changes the type of programming that will be used as well. If an output is in a rung above

the inputs it depends on, you will not get the output updated until the next scan, as the

program will keep scanning down until the last rung, then start over. This style is very

Page 15: PROGRAMMABLE LOGIC by Hites Khatri

15

advantageous in certain situations. If you want your outputs updated at the soonest

possible moment, this is the style of scanning that you want to use.

Page 16: PROGRAMMABLE LOGIC by Hites Khatri

16

4. Ladder Logic

4.1. Definition

Ladder logic is one form of drawing electrical logic schematics, and is a graphical

language very popular for programming Programmable Logic Controllers. Ladder logic

was originally invented to describe logic made from relays. The name is based on the

observation that programs in this language resemble ladders, with two vertical "rails" and

a series of horizontal "rungs" between them. Figure 5 below is a very basic example

ladder logic used in a programmable logic controls program.

Figure 5: Basic Ladder Logic Program

4.2. Comparison to Relay Logic

The program used in a controls schematic, called a ladder diagram, is similar to a

schematic for a set of relay circuits. An argument that aided the initial adoption of ladder

logic was that a wide variety of engineers and technicians would be able to understand

Page 17: PROGRAMMABLE LOGIC by Hites Khatri

17

and use it without much additional training, because of the resemblance to familiar

hardware systems. This argument has become less relevant lately given that most ladder

logic programmers have a software background in more conventional programming

languages, and in practice implementations of ladder logic have charac teristics such as

sequential execution that make the analogy to hardware somewhat imperfect. Electricians

and data cabling or control technicians still argue that this is the best graphical interface

as they generally do not have any computer science or digital systems background, and

are therefore taught with this interface in sequence with relay logic.

Figure 6: Electromechanical Relay

Relay logic is the precursor to ladder logic, and is a method of controlling industrial

electronic circuits by using relays and contacts. Figure 6 above shows an average

mechanical relay used in older relay logic systems. The schematic diagrams for relay

logic circuits are often called line diagrams, because the inputs and outputs are essentially

drawn in a series of lines, with the lines representing actual wires run in the circuit. A

relay logic circuit is an electrical network consisting of lines, in which each input/output

group must have electrical continuity with all components in that group of devices to

enable the output device. The Relay logic diagrams represent the physical interconnection

of devices, while the relay logic circuit forms an electrical schematic diagram for the

control of input and output devices. This is why electricians and control technicians can

easily understand and interpret relay logic and ladder logic diagrams. Figure 7 below

shows a basic relay logic circuit. Notice how it differs from the ladder logic circuit in

Figure 5 in that the “virtual” inputs and outputs in the ladder logic circuit have replaced

the actual relays and coils in the relay logic circuit.

Page 18: PROGRAMMABLE LOGIC by Hites Khatri

18

Figure 7: Basic Relay Logic Circuit

Figure 7 is a small, basic relay logic circuit. You can see how in relay logic circuits the

pushbuttons are represented with graphical drawings of a normally closed pushbutton for

the stop button, and a normally open pushbutton for the start button. The coil that is

marked “M” is a motor coil, and is a physical piece of equipment in the same location as

the motor, which is represented by a circle with the letter M in the middle.

The over current or overload device is represented by a normally closed coil symbol with

“O.L.” over it. There would only be seven wires to connect in this circuit, so this would

not be very difficult to wire, but when more inputs and outputs are added, the difficulty

grows exponentially. Figure 8 shows an expanded relay circuit of Figure 7 in that a

double pole single throw pushbutton is added into the diagram to be used as a “jog

function”. As the diagram shows, a jog switch is used to run the output (motor). Only one

component is added, but three wires need to be installed in the circuit for the component

to be utilized in the intended manner.

Figure 8: Relay Logic Circuit with Jog function added

Figure 9 below adds four more components to the system. Two of them are just

coils from the motor apparatus that are used as inputs and the other two are a red and

Page 19: PROGRAMMABLE LOGIC by Hites Khatri

19

green light to be utilized as output/motor status indicators for the user.

Figure 9: Relay Logic Circuit with Jog function and Status Indicators

This circuit adds 6 additional wires to the original circuit in Figure 7. If both of the

additions from Figure 8 and 9 were added to the original circuit, this would add 5

components and 9 additional wires. This illustrates how using a programmable logic

controller is advantageous in that adding any number of relays takes much less effort. It

doesn’t seem like a large amount of work to connect just 9 additional wires, but in a real

world situation, the motor in question may be on top of a grain silo, and the start/stop

station may be a few hundred feet away in a control booth. Pulling all these control wires

would take hours instead of a few minutes sitting in front of a programming terminal.

Programmable logic controllers coupled with ladder logic can make some of the most

labor intensive tasks become easy, enjoyable projects.

Ladder logic is the most widely used program for programmable logic controllers

where sequential control of a process or manufacturing operation is required. Ladder

logic is useful for simple but critical control systems, or for reworking old hardwired

relay circuits. As programmable logic controllers became more sophisticated it has also

been used in very complex automation systems. Figure 10 above shows a much more

Page 20: PROGRAMMABLE LOGIC by Hites Khatri

20

Figure 10: Complex Ladder Diagram

complicated ladder logic diagram than the one shown in F igure 5. It is relatable to the

relay circuits in Figures 7, 8, and 9 as well in that some of the outputs are motors and

status lights. In addition there are holding/latching contac ts included, but they are not a

piece of hardware. In fact, they are just the address of the respective output being

referenced, which will be discussed in greater detail later. This is still not a very large

program. Ladder logic programs can easily grow to more than 500 “rungs” to finish some

functions.

Page 21: PROGRAMMABLE LOGIC by Hites Khatri

21

5. Ladder Logic Programming

5.1. Introduction

Ladder logic or ladder diagrams are the most common programming language used to

program a PLC. Ladder logic was one of the first programming approaches used in PLCs

because it borrowed heavily from the relay diagrams that plant electricians already knew.

The symbols used in relay ladder logic consist of a power rail to the left, a second power

rail to the right, and individual circuits that connect the left power rail to the right. The

logic of each circuit (or rung) is solved from left to right. A common mistake made by

most people is trying to think of the diagram as having to have current across the rung for

the output to function. This has given many people trouble because of the fact that some

inputs are “not” inputs, which will be true when there isn’t current through this sensor.

These concepts will be discussed more later. The symbols of these diagrams look like a

ladder - with two side rails and circuits that resemble rungs on a ladder.

Figure 11: Simplified Logic Circuit

Figure 11 shows a simplified ladder logic circuit with one input and one output.

The logic of the rung above is such:

· If Input1 is ON (or true) - power (logic) completes the circuit from the left rail to the

right rail - and Output1 turns ON (or true).

· If Input1 is OFF (or false) - then the circuit is not completed and logic does not flow to

the right - and Output 1 is OFF (or false).

There are many logic symbols available in Ladder Logic - including timers, counters,

math, and data moves such that any logical condition or control loop can be represented

Page 22: PROGRAMMABLE LOGIC by Hites Khatri

22

in ladder logic. With just a handful of basic symbols such as a normally open contact,

normally closed contact, normally open coil, normally closed coil, timer and counter most

logical conditions can be represented.

Normally Open Contact

This can be used to represent any input to the control logic such as a switch or sensor, a

contact from an output, or an internal output. When solved the referenced input is

examined for a true (logical 1) condition. If it is true, the contact will close and allow

logic to flow from left to right. If the status is FALSE (logical 0), the contact is open and

logic will NOT flow from left to right.

Normally Open Coil

This can be used to represent any discrete output from the control logic. When "solved" if

the logic to the left of the coil is TRUE, the referenced output is TRUE (logical 1).

Normally Closed Contact

When solved the referenced input is examined for an OFF condition. If the status is OFF

(logical 0) power (logic) will flow from left to right. If the status is ON, power will not

flow.

Normally Closed Coil

When "solved" if the coil is a logical 0, power will be turned on to the device. If the

device is logical 1, power will be OFF.

5.2. Basic AND & OR Gates

The AND is a basic fundamental logic condition that is easy to directly represent in

Ladder Logic. Figure 12 shows a simplified AND “gate” on a ladder rung.

Figure 12: Simplified AND gate

Page 23: PROGRAMMABLE LOGIC by Hites Khatri

23

In order for Light1 to turn TRUE, Switch1 must be TRUE, AND Switch2 must be TRUE.

If Switch1 is FALSE, logic (not power) flows from the left rail, but stops at Switch1.

Light1 will be TRUE regardless of the state of Switch2. If Switch1 is TRUE, logic makes

it to Switch2. If Switch2 is TRUE, power cannot flow any further to the right, and Light1

is FALSE. If Switch1 is TRUE, AND Switch2 is TRUE - logic flows to Light1 solving its

state to TRUE.

The OR is a logical condition that is easy to represent in Ladder Logic. Figure 13 shows a

simple OR gate. Notice the differences in logic between the OR and AND gates.

Figure 13: Simplified OR gate

If Switch1 is TRUE, logic flows to Light1 turning it to TRUE. If Switch2 is TRUE, logic

flows through the Switch2 contact, and up the rail to Light1 turning it to TRUE. If

Switch1 AND Switch 2 are TRUE Light1 is TRUE. The only way Light1 is FALSE is if

Switch1 AND Switch2 are FALSE. In other words, Light1 is TRUE if Switch1 OR

Switch2 is TRUE.

5.3. Basic Timers & Counters

Many times programs will call for action to be taken in a control program based on more

than the states of discrete inputs and outputs. Sometimes, processes will need to turn on

after a delay, or count the number of times a switch is hit. To do these simple tasks,

Timers & Counters are utilized.

Page 24: PROGRAMMABLE LOGIC by Hites Khatri

24

Figure 14: On-Delay Timer (RTO)

A timer is simply a control block that takes an input and changes an output based on time.

There are two basic types of timers. There are other advanced timers, but they won’t be

discussed in this report. An On-Delay Timer takes an input, waits a specific amount of

time, allows logic to flow after the delay. An Off-Delay Timer allows logic to flow to an

output and keeps that output true until the set amount of time has passed, then turns it

false, hence off-delay. Figure 14 above shows an On-Delay Timer with a 10 second delay

before it passes the logic through it.

Figure 15: Up Counter

A counter simply counts the number of events that occur on an input. There are two basic

types of counters called up counters and down counters. As its name implies, whenever a

triggering event occurs, an up counter increments the counter, while a down counter

decrements the counter whenever a triggering event occurs. Figure 15 shows the typical

graphical representation of an Up Counter.

Page 25: PROGRAMMABLE LOGIC by Hites Khatri

25

5.4. Building a PLC/Ladder Logic Program

Building a small ladder logic program to run on a PLC network is quite easy. For the

beginner, it is easier to see the ladder diagram in the form of relay logic. Figure 16 below

shows a basic start/stop station for a motor in relay logic.

Figure 16: Ladder Diagram in Relay Logic

Just as in Figure 16 above, relay logic shows all components in the system. This is

because relay logic is the same as the wiring diagrams that the electricians use, so all the

wiring needs to be shown for the logic to work. Because of this, some components may

not need to be included in the plc ladder logic diagram.

Figure 17: Relay Diagram with overload removed

Figure 17 above shows the same circuit as in Figure 16 with the overload removed. The

overload is needed in relay logic because you have to have an overload device on any

circuit; therefore it needs to be in the wiring diagram. This way, if you push too much

current to the motor, the overload device will interrupt the circuit.

Overloads are included internally in most any device anymore, but you will still see this

in diagrams. There is still an overload device in a plc ladder logic circuit, but ladder logic

shows only those components that have an input or output address, so you do not see it. In

Figure 17, you can see that the start and stop buttons along with the motor relay will all

be turned to inputs in the plc diagram and the motor, signified by a circle with an ‘M’ in

the middle will be an output. The motor relay will not be a physical entity in the plc

ladder diagram as it is in this relay logic. It will simply be an input that uses the same I/O

address as the motor output. The stop button input can be located on either side of the

start button/relay gate, as long as it is still in series with it.

Page 26: PROGRAMMABLE LOGIC by Hites Khatri

26

Figure 18: Relay Circuit with Addition of Jog Function

Figure 18 above shows the addition of a ‘Jog Function” to the relay circuit. The jog

function is generally added to any circuit for troubleshooting purposes only. Most jog

functions are set up so that the only time the motor will run with the help of the jog

function is when the ‘Jog Button’ is pushed. In Figure 18 above, you can see this with the

relay logic. As the circuit looks right now, when the Start Button is pressed, the motor

will start, energizing the relay, and going across the Jog Button’s normally closed

contacts. The motor will stay running this way until the Stop Button is pressed. If instead

the Jog Button is pressed, the current will travel across the normally open Jog contacts

that are now closed. The motor will stay running until the Jog Button is no longer pressed.

Figure 19: Relay Circuit with Addition of Status Indicators

Figure 19 above shows that same circuit with Status Indicators added. These are used in

control rooms to inform users of the status of their motors or other moving parts. Green is

Page 27: PROGRAMMABLE LOGIC by Hites Khatri

27

the generally accepted color for a motor going, while red is stopped. The green light is

energized when the normally open contact is energized by the moving motor, closing it.

The red light is energized whenever a normally closed relay is closed, so it will turn off

whenever the motor starts to run. From Figure 16 to Figure 19, one can see that with

every component added, many wires need to be connected as well. Depending on how far

away these components are away from each other, this can be very difficult and time

consuming.

.

Figure 20: Relay Logic Diagram Converted to PLC Ladder Logic

Figure 20 above was converted from the relay logic in Figure 19 to the PLC ladder logic

seen here. If the PLC logic here was used in Figures 16-Figures 19, adding the various

component would’ve taken much less time than physically wiring each component. PLC

ladder logic can differ from relay logic in that different components are used as well. In

the relay diagrams, a single button double pole switch was used so that it could perform

two different functions. In PLC ladder logic, just a single pole button is needed, because

the computer can be asked to look for a on or off state. For the status lights, instead of

running wires to the motor relays the PLC diagram just looks for a true or false state of

the motor output.

Page 28: PROGRAMMABLE LOGIC by Hites Khatri

28

Programming with the use of NO, NC swathes

Generally basically we use the No and Nc switches for the connections of any system

The NO switch is a push switch which is remain in normally open condition, and

when it is pushed it made a close circuit The NC switch is a switch which leave in

close condition normally, mean provides a close path in normal condition and when it

is pressed it makes a open circuit.

Examples:

Problem 1: Make the logic using NO switch in such a way, that when switch is

pressed light get on, and when switch released light get off ?

Line

NO / No %Q0.0 (output)

Problem 2: Make the logic using NC pb in such a way when pb pressed light

get on and when pb released light get off

Line

%Q0.0

NC / Nc

Page 29: PROGRAMMABLE LOGIC by Hites Khatri

29

Programming with the holding concept

We have two types of holding used in the Plc

Holding by use of NO, NC switch concepts:-We can use a auxiliary or a holding

switch of any NO and NC Switch for holding concepts, the holding is always used

in the parallel of the switch for which we use the holding.

Holding by using of the output:-We can also use a auxiliary switch to hold the system

by the output of the system.

Examples:

Problem 3 ; Make the logic using two No and NC in such a way , when either one of

the NO is pressed light get on, and when NC pb pressed light get off?

L

NO / No NC / No %Q0.0

NO / No

Problem 4: Using two NO and one NC pb, make a circuit for a plc when both NO

pressed light get on and when NC pressed light get off..

L NO / No NO / No NC / No %Q0.0

%Q0.0 / No

Page 30: PROGRAMMABLE LOGIC by Hites Khatri

30

Programming with timers

Timers:- Timers are used to insert the concept of timing means we used timers in the

automatic system to insert the time intervals between two operations. Generally we use

three types of the timers for a plc:

On timer: In this type of timer the output of a timer is obtained after a preset time from

input of timer when we applied input at timer them output comes after the same time

that is called present time of a timer.

Off timer:- In this type of timer the output of timer get low after the fix time which is

set by the user when input goes low.

Pulse timer: It goes on or change its state as a pulse is obtained in its input.

Problem 5: Make the logic using NC, such that when pb pressed light get off after

3sec.

L

NC/No NC/Nc %M0

%M0

%M0 Toff TM0.Q

3sec

Page 31: PROGRAMMABLE LOGIC by Hites Khatri

31

Programming with counters and compare block

Counters: - Counters are generally used to count the any operation and it count each

operation sequentially. It detect the change of state of any And count the continuous

change of the state from one state to another state. The counters are two types.

Positive edge contact:It detect the change of state from positive edge of a digital

signal. mean when the first pulse is end them it count to next pulse at his positive

edge comes.

Negative edge contacts: -

It detects the change of state from high to low, when a pulse comes low from high

state them it count and increase the count number by one.

Counters

Empty: The mean of empty is that counter is on its initial state, mean its on zero.

Done bit:- We set the value of count in the counter, it is called the preset value of

counter, when the value of count is equal to the preset value of counter them it

donebit goes high.

Full: - The full value is the maximum value of counter which can be count by the

counter, generally it is 9999 for a counter.

Page 32: PROGRAMMABLE LOGIC by Hites Khatri

32

Reset: - Reset is the connection of counter it is used to resent the counter, when it goes

high the counter goes reset.

Count up:- When a positive pulse is applied on this point them the counter value is

exceed by one.

Count down: - When a positive pulse is applied on it them the counter value is

decreased by one.

Compare Block: - It is generally a block which compare the counter value to a given

value, its mean when counter goes to done its count them compare block increase its

count and when the compare block count is equal to its given value them it give a

output as a positive pulse form.

Compare Block.

According to figure C0 indicate the counter 0, and V is indicate the current value of

counter 0, mean when the counter 0 value is equal to 2 them compare block send a

high signal at output.

Problem 8 Make a logic using NC pb such that when NC pressed light 1 get on

immediate, after 5sec light 2 get on for 2 sec, this cycle will repete until counter get

done. Every time when cycle get complete counter will increment its value till the

counter get done, when counter get done light 1 and light 2 get off and light 3 will get

on to show counter is done, system will work again when counter is reset using NO pb?

%C0.V=2

Page 33: PROGRAMMABLE LOGIC by Hites Khatri

33

NC / No NC / Nc %M0

%M0

%M0 %TM1.Q %Q0.2 %Q0.0

%M0 %Q0.0 TM0 %Q0.1

10 sec

%M0 %TM0.Q TM1

10 sec

%NO / Nc

%Q0.1

R E

S

D

CU

CD F

Page 34: PROGRAMMABLE LOGIC by Hites Khatri

34

6. SCADA (Supervisory Control and Data Acquisition)

Earlier Plc’s use to be black boxes. You program the PLC, download the program in

it, and it will run for years. But the problem with his\is was that you really don’t know

what is happening inside the PLC. Now a days automation system contains PLC’s

and DCADA software. If you use PLC and SCADA combination the advantages you

have is you have better monitoring and control of the plant and also you have

access to the information the way you want. DCADA enables engineers, supervisors,

managers and operators to view and interact with the workings of entire operations

though graphical representation of their production process.

SCADA runs on a PC and is generally connected to various PLC and other peripheral

devices. It enables you to generate applications for the most demanding requirements

of plant engineers, operators, supervisors and mangers, tailored precisely to the needs

of each plant DCADA constantly gathers data fro the plant in real time, stores and

processes it in the database, evaluates and generates alarms, displays information to

plant operators to plant operators, supervisors and managers and can issue

instructions to PLC on the plant floor.

6.1. Features of SCADA

a) Dynamic process graphic mimics developed in SCADA software should

resemble the process mimic SCADA should have good library of symbols so that you

can develop the mimic as per requirement, once the operator sees the screen he should

know what is going on in the plant.

b) Real time and historical trend the trends play very important role in the

process operation. If your batch fails or the plant trips, you can simply go to the

historical trend data and do the analysis. You can have better look of the parameters

through the trends, for example we commission a SCADA system for Acid

Regeneration plant where the plant has to be operated on 850-deg temperature. If the

operator operates the plant at 900-deg you can imagine how much additional lpg he

is potion into the reactor. Again what will happen to the bricks of the reactor. So

Page 35: PROGRAMMABLE LOGIC by Hites Khatri

35

the production managers first job will be to go through the trends how the operators

are operating the plant. Even when the plant trips there are more than 25 probable

reasons for the same but if you go throat the history trends, its very easy to identify, the

problems.

c) Alarms have a very critical role in automation . Generally you have alarm

states for each input and outputs like your temperature should not cross 80-deg or

lever should be less that 60. So if the paramours goes in alarm. State the operator

should be initiated with the alarm. Most of the SCADA software support four types of

alarms like LOLO, LO ,HI, HIHI. Dead band the value of dead band defines the range

after which a high low alarm contain returns to normal. Alarms are most important part

of plant control applications because the operator must know instantly when

something goes wrong. It is often equally important to have a record of alarm and

whether an alarm was acknowledged. An alarm occurs when something goes wrong . It

can signal that device or process has ceased operating within acceptable, predefined

limits or it can indicate breakdown, wear or process malfunction.

d) Recipe management is an additional feature. Some DCADA software support it

some do not. Most of the plants are manufacturing multi products. When you have

different product to manufacture you just have to load the recipe of the that particular

product.

e) Security is one facility people generally look for. You can allocate certain

facilities or features to the operator, process people, engineering dept. & maintenance

dept. for example operators should only operate the system. he should not be able

change the application. The engineers should have access to changing the application

developed.Device connectivity you eoll find there are hundreds of automation

hardware manufacturer like modicon, simens, allen tradley . Everybody has there own

way of communication or we can say they have there own communication

protocol. SCADA software should have connectivity to the different hardware used in

automation. It should not happen that for modicon I am buying one software and

for siemens another one. The software like Aspic or Wonderware has connectivity to

almost all hardware used in automation.

f) Database connectivity now a days information plays very important role in

any business. Most manufacturing units go for enterprise resource planning or

management information system.

Page 36: PROGRAMMABLE LOGIC by Hites Khatri

36

6.2. Usefulness of SCADA

Production Dept

a) Real time production status: manufacturing status is updated in real time in

direct communication to operator and control device.

b) Production schedules: production schedules can be viewed and updated directly .

c) Production information mgt: production specific information is distributed to all.

Quality Dept

a) Date integrity and quality control is improved by using a common interface.

b) It is an open platform for statistical analysis.

c) Consolidation of manufacturing and lab data.

Maintenance Dept

a) Improved troubleshooting and debugging: Direct connection to wide variety of

devices, displays improves troubleshooting,

b) reduces diagnostic time

c) .Plant can be viewed remotely: Notification can include pagers, emails and

phones.

d) Co-ordination between maintenance and mgt reduces unscheduled

downtime.

Engineering Dept

a) Integrated Automation solutions reduce design and configuration

time.Common configuration platform offers flexibility for constant configuration in all

areas .

b) Capable of connecting to wide variety of systems. Reduces start up time and

system training with industry proven open interfaces.

Manufacturing Dept

a) Unscheduled down time is reduced due swift alarm detection and event driven

information.

b) Makes operations easier and more repeatable with its real time functionality.

c) Secured real time operation are maintained with windows.

Page 37: PROGRAMMABLE LOGIC by Hites Khatri

37

6.3. General Terminology of SCADA

What is a Tag: A tag is a logical name for a variable in a device or local memory.

Tags that receive data from some external devices such as programmable logic

controllers or servers are refereed to as input and output tags. Tags that receive data

internally from software are called memory tags.

Analog Tags: Store a range of values are called analog tags form example

temperature, flow etc.

Discrete Tags: To store values such as 0 or 1 are called discrete tags form example

pump, valves etc.

System Tags: System tags store information generated while the software is

running including alarm info and system time and date.

String Tags: String tags are used to store ASCII strings a series of characters or

whole word. The max string length is 131 characters.

6.4. Miscellaneous links

Visibility: Visibility used to control visibility of an object based on the value of a

discrete tag name or expression.

Blink: Blink used to make an object blink based on the value of a discrete aflame or

expression.

Orientation : Orientation used to make an object rotate based on the value of a aflame.

Disable: Disable used to disable the touch functionality of objects based on the

value of a tag name of expression. Often used as part of a security strategy.

Value display links: Value display links provide the ability to use a text object to

display the value of a discrete, analog or string tag name.

Percent fill links: Percent fill links used to provide ability to vary the full level of a

filled shape according to the value of an analog tag name or an expression that computes

to an analogy value.

Page 38: PROGRAMMABLE LOGIC by Hites Khatri

38

6.5. Animation links

Touch links: Touch links allow the operator to input data into the system. Form

example operator may turn the valve on or off, enter a new alarm set point, run a complex

logic script etc.

Touch pushbuttons: Touch pushbuttons are used to create object links that

immediately perform an operation when clicked with the mouse or touched. These

operations can be discrete value changes, action script executions, and show or hide

window commands.

Color links : Color links are used to animate the line color, fill color and text contour

of an object. Each of these color attributes can be made dynamic by defining a color link

for the attribute. The color attribute may be linked to the value of a discrete

expression, analogue expression, discrete alarm status or analog alarm status.

6.4. Trends in SCADA

There is a trend for PLC and HMI/SCADA software to be more "mix-and-match". In

the mid 1990s, the typical DAQ I/O manufacturer supplied equipment that

communicated using proprietary protocols over a suitable-distance carrier like RS-

485. End users who invested in a particular vendor's hardware solution often found

themselves restricted to a limited choice of equipment when requirements changed

(e.g. system expansions or performance improvement). To mitigate such problems,

open communication protocols such as IEC870-5-101/104, DNP3 serial, and DNP3

LAN/WAN became increasingly popular among SCADA equipment manufacturers

and solution providers alike. Open architecture SCADA systems enabled users to mix-

and-match products from different vendors to develop solutions that were better than

those that could be achieved when restricted to a single vendor's product offering.

Towards the late 1990s, the shift towards open communications continued with

individual I/O manufacturers as well, who adopted open message structures such as

Modbus RTU and Modbus ASCII (originally both developed by Modicon) over RS-

485. By 2000, most I/O makers offered completely open interfacing such as Modbus

TCP over Ethernet and IP.

Page 39: PROGRAMMABLE LOGIC by Hites Khatri

39

The North American Electric Reliability Corporation (NERC) has specified that

electrical system data should be time-tagged to the nearest millisecond. Electrical

system SCADA systems provide this function, using Radio clocks to synchronize

the RTU or distributed RTU clocks. SCADA systems are coming in line with

standard networking technologies. Ethernet and TCP/IP based protocols are replacing the

older proprietary standards. Although certain characteristics of frame-based network

communication technology (determinism, synchronization, protocol selection,

environment suitability) have restricted the adoption of Ethernet in a few specialized

applications, the vast majority of markets have accepted Ethernet networks for

HMI/SCADA.

With the emergence of software as a service in the broader software industry, a few

vendors have begun offering application specific SCADA systems hosted on remote

platforms over the Internet. This removes the need to install and commission systems at

the end-user's facility and takes advantage of security features already available in

Internet technology, VPNs and SSL. Some concerns include security, Internet

connection reliability, and latency.

SCADA systems are becoming increasingly ubiquitous. Thin clients, web portals, and

web based products are gaining popularity with most major vendors. The increased

convenience of end users viewing their processes remotely introduces security

considerations. While these considerations are already considered solved in other sectors

of internet services, not all entities responsible for deploying SCADA systems have

understood the changes in accessibility and threat scope implicit in connecting a system

to the internet.

6.5. Security issues

a) The move from proprietary technologies to more standardized and open

solutions together with the increased number of connections between SCADA

systems and office networks and the Internet has made them more vulnerable to

attacks - see references. Consequently, the security of SCADA-based systems has

come into question as they are increasingly seen as extremely vulnerable to

cyberwarfare/ cybe rterrorism attacks.In particular, security researchers are concerned

about:

Page 40: PROGRAMMABLE LOGIC by Hites Khatri

40

b) The lack of concern about security and authentication in the design,

deployment and operation of existing SCADA networks

c) The mistaken belief that SCADA networks are secure because they are

purportedly physically secured

d) The mistaken belief that SCADA networks are secure because they are

supposedly disconnected from the Internet

SCADA systems are used to control and monitor physical processes, examples of

which are transmission of electricity, transportation of gas and oil in pipelines, water

distribution, traffic lights, and other systems used as the basis of modern society. The

security of these SCADA systems is important because compromise or destruction of

these systems would impact multiple areas of society far removed from the original

compromise. For example, a blackout caused by a compromised electrical SCADA

system would cause financial losses to all the customers that received electricity from

that source. How security will affect legacy SCADA and new deployments

remains to be seen.

There are two distinct threats to a modern SCADA system. First is the threat of

unauthorized access to the control software, whether it be human access or changes

induced intentionally or accidentally by virus infections and other software threats

residing on the control host machine. Second is the threat of packet access to the network

segments hosting SCADA devices. In many cases, there is rudimentary or no

security on the actual packet control protocol, so anyone who can send packets to the

SCADA device can control it. In many cases SCADA users assume that a VPN is

sufficient protection and are unaware that physical access to SCADA-related network

jacks and switches provides the ability to totally bypass all security on the control

software and fully control those SCADA networks. These kinds of physical access

attacks bypass firewall and VPN security and are best addressed by endpoint-to-

endpoint authentication and authorization such as are commonly provided in the non-

SCADA world by in-device SSL or other cryptographic techniques.

Many vendors of SCADA and control products have begun to address these

risks in a basic sense by developing lines of specialized industrial firewall and

VPN solutions for TCP/IP-based SCADA networks. Additionally, application

whitelisting solutions are being implemented because of their ability to prevent

Page 41: PROGRAMMABLE LOGIC by Hites Khatri

41

malware and unauthorized application changes without the performance impacts of

traditional antivirus scans Also, the ISA Security Compliance Institute (ISCI) is

emerging to formalize

SCADA security testing starting as soon as 2009. ISCI is conceptually

similar to private testing and certification that has been performed by vendors

since 2007. Eventually, standards being defined by ISA99 WG4 will supersede the

initial industry consortia efforts, but probably not before 2011 .

The increased interest in SCADA vulnerabilities has resulted in vulnerability

researchers discovering vulnerabilities in commercial SCADA software and more

general offensive SCADA techniques presented to the general security community. In

electric and gas utility SCADA systems, the vulnerability of the large installed base

of wired and wireless serial communications links is addressed in some cases by

applying bump-in-the-wire devices that employ authentication and encryption

rather than replacing all existing nodes.

Page 42: PROGRAMMABLE LOGIC by Hites Khatri

42

7. Conclusion

The automation of any system or any industry is necessary in the present comparative

ward for the better performance of the system or industry. The main and most

important part of a automatic system is a PLC and SCADA. By the use of plc we can

change any system as according to our requirements without changing in the

hardware’s. The many other benefits are also by them it is used like it’s required less

space and less power to operate, it has long life, the changing in logic is easy etc. For the

use of a plc the programming is must, with out the program we can not use the plc, for

the different plc’s of all the companies the method of programming and the

logic remain same but the addressing is changed, the addressing is also available

from the software’s. So the most important part is programming for a plc according to

the requirements.

SCADA is the second important part of the automation. It is used by the plc’s, by the

scada software’s we can design mimic of each field sys tem or components and

can measure in our pc which is placed in our control room. And we can control or

change the value of each components through our computer which are placed in

the field, There are many animation links in the scada by which we can design

the mimic of components. So in one line the scada is the system by which we can see

the performance of the field component in our pc or our control room and also

change the value of control quantities by our pc from the control room.

7.1. Summary

This report has discussed the role that programmable logic controllers have in the

efficient design and control of mechanical processes. Also discussed was the

understanding of ladder logic and the programming involved with it. Finally, the report

has discussed relay logic and the evolution that ladder logic made from it. Four areas in

regards to programmable logic controllers were addressed:

1. Programmable Logic History: This section discussed the history and advancement of

controls technology, with a comparison of programmable logic controllers and hard-wired

relays.

2. PLC components: This section defined what programmable logic is and described all

hardware associated with it.

Page 43: PROGRAMMABLE LOGIC by Hites Khatri

43

3. Ladder Logic: This section covered ladder logic and its general progression from relay

logic.

4. Ladder Logic Programming: This section covered basic programming techniques and

their implementation.

7.2. Closing Comments

With the speed of changing technology today it is easy to lose sight or knowledge of the

basic theory or operation of programmable logic. Most people simply use the hardware to

produce the results they desire. Hopefully, this report has given the reader a deeper

insight into the inner workings of programmable logic and its role in mechanical

operations. The idea of programmable logic is very simple to understand, but it is the

complex programs that run in the ladder diagrams that make them difficult for the

common user to fully understand. Hopefully this has alleviated some of that confusion.

Page 44: PROGRAMMABLE LOGIC by Hites Khatri

44

Bibliography

Study material by Vision automation pvt. ltd.

Programmable logic by John. R . Hockwarth controllers

Programmable logic by L.N.Bryan

controllers E.A.Bryan

Programmable logic by W.Batton Controllers

Automatic manufacturing by Hugh Jack System with PLC