Item No: 5C_supp Date of Meeting: March 5, 2020
Project Authorization ForWUT Utility Vault Upgrades
Presenter: Elly BulegaTitle: Engineering Project Manager
1
![Page 2: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/2.jpg)
Action RequestedWUT Utility Vault Upgrades
Request project authorization in the amount $1,160,000, for a total authorized amount of $1,310,000, for the WUT Utility Vault Upgrades, Master Identification No. 201090.01.
2
![Page 3: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/3.jpg)
BackgroundWUT Utility Vault Upgrades
[Add photos/drawings as pertinent to explain location/background] –use next page, a blank page.
3
![Page 4: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/4.jpg)
BackgroundWUT Utility Vault Upgrades
4
Settlement Around Utility
Lid
Settlement Around Utility
Lid
Hatch Cover Damage
Hatch Cover Damage
Cracked frame Cracked frame
![Page 5: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/5.jpg)
5
BackgroundWUT Utility Vault Upgrades
![Page 6: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/6.jpg)
Project Description and DetailsWUT Utility Vault Upgrades
The overall scope
6
![Page 7: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/7.jpg)
Project ScheduleWUT Utility Vault Upgrades
Advertise Bids March 2020Bid Opening April 2020Contract Award April 2020Phase I September 2020Phase II June 2021
7
![Page 8: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/8.jpg)
Financial SummaryWUT Utility Vault Upgrades
This Request
Total Project Cost
Cost to Date
Remaining Cost
DESIGN $0 $150,000 $36,443 $113,557CONSTRUCTION $1,160,000 $1,160,000 $0 $1,160,000
$1,160,000 $1,310,000 $1,273,557
Item
PROJECT TOTAL
8
![Page 9: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/9.jpg)
Environmental Impacts/ReviewWUT Utility Vault Upgrades
Permitting:
• No permitting is anticipated on the project.
Stormwater:
• No water quality impacts are anticipated. Best Management Practices (BMPs) will be implemented to protect water during construction activities.
9
![Page 10: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise](https://reader033.vdocument.in/reader033/viewer/2022053010/5f0e1f1c7e708231d43db72f/html5/thumbnails/10.jpg)
ConclusionWUT Utility Vault Upgrades
Request project authorization in the amount $1,160,000, for a total authorized amount of $1,310,000, for the WUT Utility Vault Upgrades, Master Identification No. 201090.01.
10