PROJECT BACKGROUND FEBRUARY 2019 Background • The Wisconsin Department of Transportation (WisDOT) is preparing preliminary engineering plans and conducting environmental analyses for the proposed County KR improvements between County H and Old Green Bay Road in Racine and Kenosha counties. The project begins 400 feet east of the County KR/County H intersection and extends east for 2.8 miles to end 1,600 feet east of the County KR/Old Green Bay Road intersection. • WisDOT, Racine County and Kenosha County entered into a state trunk highway jurisdictional transfer agreement in April 2018 for the County KR improvements between I-94 and Old Green Bay Road. The agreement allows WisDOT to complete design and construction activities for this section of County KR. The counties are responsible for right of way acquisition and relocations. After construction, WisDOT will return jurisdiction of the roadway to the counties for ongoing control, access rights and maintenance. The design and construction of the section of County KR between I-94 and County H is being completed as part of a separate project. The section between County H and Old Green Bay Road is being evaluated in the Environmental Assessment and is referred to as the County KR-Phase 2 project. Project/Study Location Map Pike River Crossing CANADIAN P A C I FI C R R CANADIAN P A C I FI C R R UNION P ACIFIC RR UNION P ACIFIC RR STURTEVANT MOUNT PLEASANT SOMERS RACINE COUNTY KENOSHA COUNTY RACINE COUNTY KENOSHA COUNTY P i k e R i v e r P i k e R i v e r KR EA H 94 41 31 Wood Rd Wood Rd Meachem Rd Meachem Rd 1st St 1st St 7th St 7th St Somers Rd Somers Rd Braun Rd Braun Rd O l d G r e e n B a y R d T a ylo r A ve 90th Ave 90th Ave Green Bay Rd Green Bay Rd 105th Ave 105th Ave NOT TO SCALE Project Limits Railroad Crossing

Upload: others

Post on 25-Mar-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

PROJECT BACKGROUND

FEBRUARY 2019

Background

• The Wisconsin Department of Transportation (WisDOT) is preparing preliminary engineering plans and conducting environmental analyses for the proposed County KR improvements between County H and Old Green Bay Road in Racine and Kenosha counties. The project begins 400 feet east of the County KR/County H intersection and extends east for 2.8 miles to end 1,600 feet east of the County KR/Old Green Bay Road intersection.

• WisDOT, Racine County and Kenosha County entered into a state trunk highway jurisdictional transfer agreement in April 2018 for the County KR improvements between I-94 and Old Green Bay Road. The agreement allows WisDOT to complete design and construction activities for this section of County KR. The counties are responsible for right of way acquisition and relocations. After construction, WisDOT will return jurisdiction of the roadway to the counties for ongoing control, access rights and maintenance. The design and construction of the section of County KR between I-94 and County H is being completed as part of a separate project. The section between County H and Old Green Bay Road is being evaluated in the Environmental Assessment and is referred to as the County KR-Phase 2 project.

Project/Study Location Map

Pike RiverCrossing

CANADIAN PACIFIC RRCANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

STURTEVANT

UNION GROVE

MOUNT PLEASANT

SOMERS

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

Pike RiverPike River

A

E

11

KR

45 D

EA

MB

H

94

41

31

Braun RdBraun Rd

Woo

d R

dW

ood

Rd

Mea

chem

Rd

Mea

chem

Rd

56th Rd56th Rd

1st St1st St

7th St7th St

Somers RdSomers Rd

Braun RdBraun Rd

Old Green Bay

Rd

Taylor Ave

90th

Ave

90th

Ave

Gre

en B

ay R

d

Gre

en B

ay R

d

105t

h A

ve10

5th

Ave

NOT TO SCALE

Project Limits Railroad Crossing

Page 2: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

PURPOSE & NEED

FEBRUARY 2019

Purpose

• The purpose of the project is to upgrade the County KR infrastructure to safely and efficiently handle projected traffic volumes anticipated from local economic development activities occurring in the project area, and to provide a safe and well-connected transportation corridor that serves the communities in Racine County and Kenosha County.

Need

• Travel DemandThe existing two-lane undivided rural roadway configuration along County KR is not adequate to handle increased travel demand anticipated from local economic development projects and land use plans including Foxconn. The existing two-lane roadway currently handles about 9,000 to 9,500 vehicles per day. Future traffic volume on County KR is expected to more than double to 18,000 to 20,000 vehicles per day by the year 2042.

• System Linkage and Route ImportanceCounty KR is an important east-west local arterial road for Racine and Kenosha counties. County KR connects I-94 with WIS 31 and WIS 32 and serves the existing population and employment base in the cities of Kenosha and Racine, as well as the expanding employment base in Mount Pleasant and Somers.

• Roadway DeficienciesCounty KR does not meet standards for distances required for vehicles to come to a complete stop. No bike or pedestrian facilities are present along most of the roadway. Narrow shoulders are inadequate for vehicle refuge. Inadequate cross slopes cause poor drainage. Based on engineering judgement, these deficiencies, combined with future travel demand on County KR, impact safety for vehicular, bike and pedestrian travel.

• SafetyWithin the project limits, County KR experienced 50 crashes between 2013 and 2017 and had a crash rate of 140.2 crashes per 100 million vehicle miles. This crash rate exceeds the statewide crash rate threshold of 115.9 crashes/100 million vehicle miles. Most of the crashes in the project area, 37 crashes, occurred at the intersection of County KR and WIS 31. According to the traffic report prepared for the project, modifications such as intersection and capacity improvements would be needed to accommodate the projected 2042 traffic volumes along County KR to maintain safety.

Page 3: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

PROJECT DESCRIPTION

FEBRUARY 2019

Roadway

• The Build Alternative - Reconstruction would replace the existing two-lane rural undivided roadway with a four-lane divided urban roadway.

• The Build Alternative - Reconstruction would reconstruct and expand County KR with two 12-foot travel lanes in each direction that are divided by a median.

• The raised median between County H and 90th Street would be 36-feet and the median for the remainder of the corridor would typically be 30-feet.

• Between the UPRR and 56th Avenue, County KR would have a 22-foot raised median and 8-foot shoulders to allow vehicles to decelerate to and accelerate from driveways.

• East of Old Green Bay Road, the 30-foot raised median would end just west of 43rd Avenue. Then, the median, which tapers to match the existing road width, would be painted to facilitate full access across County KR.

• Proposed right of way for the Build Alternative - Reconstruction would vary from 224 feet to 380 feet, depending on location.

• One note of importance is that while the preferred median access option in the EA between the UPRR and 56th Avenue is a full raised median with no access, Racine and Kenosha counties have both indicated their support for option 3, Two Way Left Turn Lane (TWLTL), that allows continuous cross access from driveways in this area. WisDOT would like feedback on this option from people tonight.

Intersections

• The Build Alternative - Reconstruction would include improvements to maintain traffic operations at the County KR intersections with WIS 31 and Old Green Bay Road and it would realign 90th Street on the north with County EA (72nd Avenue) on the south.

• Each of these intersections would be signalized and have exclusive left turn and right turn lanes.

Railroad Grade Separations

• New bridges (grade separations) for County KR would replace the existing at-grade railroad crossings at CPRR and UPRR.

• The new bridges would have a 23-foot, 3-inch clearance over the railroad tracks to meet design standards for railroad grade separations.

• The grade separation at UPRR would include a retaining wall on the south side of County KR that ranges in height from 2 feet to 28 feet and an access road off County KR to provide access to residential properties to the south of County KR.

Page 4: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

PROJECT DESCRIPTION

FEBRUARY 2019

Pedestrian and Bicycle Accommodations

• The Build Alternative – Reconstruction would build a 10-foot shared-use path on both sides of the road between County H and 90th Street. The path would be constructed on the north side of County KR between 90th Street and Vicksburg Drive, just east of Old Green Bay Road.

• The Kenosha County shared-use path on the south side of County KR between 56th Avenue and WIS 31 would be replaced in generally the same configuration.

• The existing bridge for the path over the Pike River would be removed and bicyclists and pedestrians would be rerouted onto a bike/pedestrian lane on the new County KR bridge over the Pike River.

Stormwater and Drainage Facilities

• The Build Alternative – Reconstruction would replace existing drainage ditches with curb and gutter, and stormwater would be conveyed to one of four detention ponds at the following general locations:

North of County KR, between County H and CPRRSouth of County KR, east of 72nd AvenueNorth of County KR, west of the Pike RiverSouth of County KR, between the Pike River and WIS 31

Pike River Bridges

• The Build Alternative – Reconstruction would replace the existing 3-cell (12-foot x 13.5-foot/cell) box culvert that conveys the Pike River under County KR with two new 233-foot concrete slab span bridges over the Pike River. Slab span bridges are thick reinforced concrete slabs (no beams/girders) that span the stream crossing to the supporting foundations (piers and abutments).

Page 5: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

REGIONAL TRANSPORTATION COMPATIBILITY

FEBRUARY 2019

The Southeastern Wisconsin Regional Planning Commission (SEWRPC) amended VISION 2050, the region’s long-range land use and transportation plan, in December 2018 to incorporate changes to accommodate additional residents and jobs related to the Foxconn campus. The amended plan incorporates transportation improvements to serve the Foxconn campus area.

The County KR – Phase 2 project is consistent with the VISION 2050 plan recommendations:

• Widens County KR (County H to Old Green Bay Road) to four lanes.• Provides enhanced bicycle facility along County KR that links with other regional trails.• Accommodates and supports recommended transit service along County KR.

VISION 2050 Arterial Street & Highway System Recommendations

VISION 2050 Bicycle Network Recommendations

VISION 2050 Transit Service Recommendations

88

6 4

6

6

6

66 6

4

6

6

6

444

4

4

64 44

6

6 6

6

4

4

44

4

4

!

!

!

!

4

")H

")T

")X

")KR

")G")EA

")KR

")H

**

³±

##

20

**

³±

##

11

**

³±

##

32

,-41

0141

,-94

")A

")C

YorkvilleSomers

STURTEVANT

RACINE

ELMWOODPARK

SOMERS

MOUNTPLEASANT

FREEWAY INTERCHANGE

EXISTING!

ARTERIAL STREET OR HIGHWAY

SEWRPCSource:

0 1 2 Miles

WIDENING AND/OR OTHER IMPROVEMENT TO PROVIDE SIGNIFICANT ADDITIONAL CAPACITY

RESURFACING OR RECONSTRUCTION TOPROVIDE ESSENTIALLY THE SAME CAPACITY

NUMBER OF TRAFFIC LANES FOR NEW ORIMPROVED FACILITY, INCLUDING RIGHT-OF-WAY RESERVATIONS (2 LANES WHERE UNNUMBERED)

4RESERVE RIGHT-OF-WAY TO ACCOMMODATEPOTENTIAL FUTURE IMPROVEMENT BEYOND 2050 (ADDITIONAL LANES OR NEW FACILITY)

NEW

")H

")T

")X

")KR")KR

")H

**

³±

##

20

**

³±

##

11,-41

0141

,-94

")A

")C

Yorkville

STURTEVANT

RACINE

ELMWOODPARK

SOMERS

MOUNTPLEASANT

Somers **

³±

##

32

BICYCLE FACILITIES

SEWRPCSource:

0 1 2 Miles

Corridor would include an enhanced bicycle facility—suchas a protected bike lane, a separate path within the roadright-of-way, or a buffered bike lane—located on oralong an arterial or, alternatively, a neighborhoodgreenway on a nearby parallel nonarterial.

aARTERIAL STREET OR HIGHWAY WITHBICYCLE ACCOMMODATION (IF FEASIBLE)

OFF-STREET BICYCLE PATH

NONARTERIAL STREET CONNECTIONTO OFF-STREET BICYCLE NETWORK

aRECOMMENDED CORRIDOR FORENHANCED BICYCLE FACILITY

!!

!!

!!

!!

!!

!!

!!

!!

!!!!!!!!

!! !!!!

!!

Norway Raymond

Yorkville

Paris

Somers

BAY

WIND

NORTH

POINT

UNIONGROVE

ELMWOODPARK

STURTEVANT

LAKEPADDOCK

PLEASANT

PRAIRIE

ELMGROVE

BUTLER

WEST

GREENDALE

MILWAUKEE

SHOREWOOD

CORNERS

BAY

HALES

CALEDONIA

MOUNT PLEASANT

BRISTOL

SOMERS

ST.

SOUTH

CUDAHY

FRANCIS

FRANKLINOAK

MILWAUKEE

WAUWATOSA

MILWAUKEE

GREENFIELD

WESTALLIS

CREEKMUSKEGO

NEW BERLIN

BROOKFIELD

RACINE

KENOSHA

W A U K E S H A C O . M I L W A U K E E C O .

K E N O S H A C O .

R A C I N E C O .**

³±

##

32

**³±

##

38

**

³±

##

32

**

³±

##

24

**

³±

##

57

**

³±

##

59

**

³±

##

36

**

³±

##

100

**

³±

##

145

**

³±

##

190

**

³±

##

181

**³±

##

119

**

³±

##100

**

³±

##

32

**

³±##

794

**

³±

##

36

**

³±

##

31

**

³±

##

32

**

³±

##

38

**

³±

##

20

**

³±

##

11

**

³±

##

83

**

³±

##

50

**

³±

##

32

**

³±

##

31

**

³±

##

50

**

³±

##

31

**

³±

##

158

**

³±

##

165

**

³±

##

32

**

³±##

241

**

³±

##

175

0141

0118

0145

0141

0141

0145

0145

0145

0141

,-94

,-43

,-94

,-94

,-794

,-894

,-43 ,-894

,-94

,-41

,-41

,-41

,-41

,-41

TRANSIT SERVICES LOCAL TRANSIT SERVICE AREA AND PEAK FREQUENCY

STREETCAR LINE

INTERCITY RAIL

COMMUTER BUS ROUTE & PARK-RIDE

COMMUTER RAIL LINE & STATION

EXPRESS BUS ROUTE

RAPID TRANSIT LINE

!!

TO BURLINGTON

EVERY 15 MINUTES OR BETTER

LESS FREQUENT THAN EVERY 15 MINUTES

ONE DAY ADVANCE-RESERVATION SHARED-RIDE TAXI

SEWRPCSource:

0 1 2 3 Miles

Page 6: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

ENVIRONMENTAL IMPACTS SUMMARY

FEBRUARY 2019

Evaluation Factors No BuildBuild Alternative - Reconstruction

PROJECT PARAMETERSLength (miles) 2.8 2.8

Total project cost YOE (million $) $0.92 $59

Right of way width (feet) 66 224 to 380

Number of lanes 2 4

Pedestrian and bicycle facilitiesLimited to south side of County KR between 56th Avenue and WIS 31

10-foot shared-use path on both sides of County KR between County H and 90th Street and on the north side of County KR between 90th Street and Vicksburg Drive

Stormwater facilities Roadside ditches Storm sewers and detention ponds

Railroad crossings Two at-grade crossings Two grade separated crossings

Pike River crossingBox culverts (capacity for 5-year flood event)

Bridges (capacity for 100-year flood event)

Driveway and intersection accessFew restrictions on right and left turns

• Typically left turns restricted to median openings at public intersections.

• Between the UPRR and 56th Avenue the median width is reduced, and the shoulder width is increased to allow vehicles to decelerate to and accelerate from driveways.

• East of 43rd Avenue the median would be painted to facilitate full access across County KR.

TRAFFIC OPERATIONS IN DESIGN YEAR 2042County KR - County H to 90th Street (LOS) E C

County KR - 90th Street to WIS 31 (LOS) E B

County KR - WIS 31 to County M (LOS) E B

LAND CONVERSION AND REAL ESTATE REQUIREMENTSAcres converted to new right of way 0 68.9

Acres required from farm operations 0 53.4 (23 acres purchased by Mount Pleasant for Foxconn)

Number of farms impacted 0 14

Housing units required 0 5

ENVIRONMENTAL IMPACTSResidences impacted by traffic noise (number) 0 23

Historic properties (number) 0 0

Archaeological sites (number) 0 0

Aesthetic/visual changes No Yes

Environmental justice concerns No No

Floodplain impact (acres) 0 2.7

Wetland impact (acres) 0 7.44

Environmental corridor impact (acres) 0 3.49

Pike River restoration area impact (acres) 0 0.38

Future Biex Ramcke Homstead Park impact (acres) 0 2.08

Stream crossings (Pike River) 1 1

Threatened and endangered species (potential for impacts) No No (mitigation measures proposed for Rusty Patched Bumble Bee)

Air quality concerns No No

Contaminated sites (recommended for further investigation) 0 3

Potential for indirect effects No

Indirect effects to resources may occur from the Build Alternative-Reconstruction if induced development occurs. Local, state and federal regulations and policies are in place to manage resources and minimize indirect effects.

Potential for cumulative effects No

The project’s direct impacts and indirect effects, in combination with other projects implemented by other parties may contribute to cumulative effects on resources. Local, state and federal regulations and policies are in place to manage resources and minimize cumulative effects.

Page 7: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

REGIONAL TRANSPORTATION COMPATIBILITY

FEBRUARY 2019

The Southeastern Wisconsin Regional Planning Commission (SEWRPC) amended VISION 2050, the region’s long-range land use and transportation plan, in December 2018 to incorporate changes to accommodate additional residents and jobs related to the Foxconn campus. The amended plan incorporates transportation improvements to serve the Foxconn campus area.

The County KR – Phase 2 project is consistent with the VISION 2050 plan recommendations:

• Widens County KR (County H to Old Green Bay Road) to four lanes.• Provides enhanced bicycle facility along County KR that links with other regional trails.• Accommodates and supports recommended transit service along County KR.

VISION 2050 Arterial Street & Highway System Recommendations

VISION 2050 Bicycle Network Recommendations

VISION 2050 Transit Service Recommendations

88

6 4

6

6

6

66 6

4

6

6

6

444

4

4

64 44

6

6 6

6

4

4

44

4

4

!

!

!

!

4

")H

")T

")X

")KR

")G")EA

")KR

")H

**

³±

##

20

**

³±

##

11

**

³±

##

32

,-41

0141

,-94

")A

")C

YorkvilleSomers

STURTEVANT

RACINE

ELMWOODPARK

SOMERS

MOUNTPLEASANT

FREEWAY INTERCHANGE

EXISTING!

ARTERIAL STREET OR HIGHWAY

SEWRPCSource:

0 1 2 Miles

WIDENING AND/OR OTHER IMPROVEMENT TO PROVIDE SIGNIFICANT ADDITIONAL CAPACITY

RESURFACING OR RECONSTRUCTION TOPROVIDE ESSENTIALLY THE SAME CAPACITY

NUMBER OF TRAFFIC LANES FOR NEW ORIMPROVED FACILITY, INCLUDING RIGHT-OF-WAY RESERVATIONS (2 LANES WHERE UNNUMBERED)

4RESERVE RIGHT-OF-WAY TO ACCOMMODATEPOTENTIAL FUTURE IMPROVEMENT BEYOND 2050 (ADDITIONAL LANES OR NEW FACILITY)

NEW

")H

")T

")X

")KR")KR

")H

**

³±

##

20

**

³±

##

11,-41

0141

,-94

")A

")C

Yorkville

STURTEVANT

RACINE

ELMWOODPARK

SOMERS

MOUNTPLEASANT

Somers **

³±

##

32

BICYCLE FACILITIES

SEWRPCSource:

0 1 2 Miles

Corridor would include an enhanced bicycle facility—suchas a protected bike lane, a separate path within the roadright-of-way, or a buffered bike lane—located on oralong an arterial or, alternatively, a neighborhoodgreenway on a nearby parallel nonarterial.

aARTERIAL STREET OR HIGHWAY WITHBICYCLE ACCOMMODATION (IF FEASIBLE)

OFF-STREET BICYCLE PATH

NONARTERIAL STREET CONNECTIONTO OFF-STREET BICYCLE NETWORK

aRECOMMENDED CORRIDOR FORENHANCED BICYCLE FACILITY

!!

!!

!!

!!

!!

!!

!!

!!

!!!!!!!!

!! !!!!

!!

Norway Raymond

Yorkville

Paris

Somers

BAY

WIND

NORTH

POINT

UNIONGROVE

ELMWOODPARK

STURTEVANT

LAKEPADDOCK

PLEASANT

PRAIRIE

ELMGROVE

BUTLER

WEST

GREENDALE

MILWAUKEE

SHOREWOOD

CORNERS

BAY

HALES

CALEDONIA

MOUNT PLEASANT

BRISTOL

SOMERS

ST.

SOUTH

CUDAHY

FRANCIS

FRANKLINOAK

MILWAUKEE

WAUWATOSA

MILWAUKEE

GREENFIELD

WESTALLIS

CREEKMUSKEGO

NEW BERLIN

BROOKFIELD

RACINE

KENOSHA

W A U K E S H A C O . M I L W A U K E E C O .

K E N O S H A C O .

R A C I N E C O .**

³±

##

32

**³±

##

38

**

³±

##

32

**

³±

##

24

**

³±

##

57

**

³±

##

59

**

³±

##

36

**

³±

##

100

**

³±

##

145

**

³±

##

190

**

³±

##

181

**³±

##

119

**

³±

##100

**

³±

##

32

**

³±##

794

**

³±

##

36

**

³±

##

31

**

³±

##

32

**

³±

##

38

**

³±

##

20

**

³±

##

11

**

³±

##

83

**

³±

##

50

**

³±

##

32

**

³±

##

31

**

³±

##

50

**

³±

##

31

**

³±

##

158

**

³±

##

165

**

³±

##

32

**

³±##

241

**

³±

##

175

0141

0118

0145

0141

0141

0145

0145

0145

0141

,-94

,-43

,-94

,-94

,-794

,-894

,-43 ,-894

,-94

,-41

,-41

,-41

,-41

,-41

TRANSIT SERVICES LOCAL TRANSIT SERVICE AREA AND PEAK FREQUENCY

STREETCAR LINE

INTERCITY RAIL

COMMUTER BUS ROUTE & PARK-RIDE

COMMUTER RAIL LINE & STATION

EXPRESS BUS ROUTE

RAPID TRANSIT LINE

!!

TO BURLINGTON

EVERY 15 MINUTES OR BETTER

LESS FREQUENT THAN EVERY 15 MINUTES

ONE DAY ADVANCE-RESERVATION SHARED-RIDE TAXI

SEWRPCSource:

0 1 2 3 Miles

Page 8: PROJECT BACKGROUND · ,-894,-43,-894,-94,-41,-41,-41,-41,-41 transit services local transit service area and peak frequency streetcar line intercity rail commuter bus route & park-ride

ESTI

MAT

ED P

ROJE

CT S

CHED

ULE

FEBR

UARY

201

9

Act

ivit

y20

1820

1920

2020

2120

22

Env

ironm

enta

l Doc

umen

t (E

nviro

nmen

tal A

sses

smen

t)

Pub

lic H

earin

g fo

r E

nviro

nmen

tal A

sses

smen

t

Find

ing

of N

o S

igni

fican

t Im

pact

(FO

NS

I)

Pre

limin

ary

Des

ign

Fina

l Des

ign

Rea

l Est

ate

Acq

uisi

tion

Rel

ocat

ions

/Bui

ldin

g D

emo

Util

ity R

eloc

atio

ns

Pro

ject

Let

for

Bid

Con

stru

ctio

n

Upc

omin

g M

ilest

ones

• P

ublic

com

men

t per

iod

on E

nviro

nmen

tal A

sses

smen

t end

s M

arch

7, 2

019.

• P

endi

ng re

sults

of p

ublic

hea

ring,

Wis

DO

T m

ay is

sue

a Fi

ndin

g of

No

Sig

nific

ant I

mpa

ct (F

ON

SI)

by th

e en

d of

Mar

ch 2

019,

indi

catin

g st

ate

appr

oval

of t

he

pref

erre

d al

tern

ativ

e.•

Pen

ding

the

FON

SI,

final

eng

inee

ring

and

right

of w

ay a

cqui

sitio

ns w

ould

beg

in s

prin

g 20

19 a

nd c

ontin

ue to

ear

ly s

prin

g 20

20.

At t

he e

nd o

f the

doc

umen

t ava

ilabi

lity

perio

d, th

e pr

ojec

t tea

m w

ill re

view

and

con

side

r al

l pub

lic h

earin

g te

stim

ony

rece

ived

on

the

Env

ironm

enta

l A

sses

smen

t. Th

is in

put w

ill as

sist

the

proj

ect t

eam

in s

elec

ting

the

pref

erre

d al

tern

ativ

e.