16D5323-0033 No. B2 Construction Corporation PO Box 4323 Parker CO 80134 TO: 04/25/2016 DATE: 030000-Concrete RE: David Beaudoin ATTN: Shop Drawings Letter Prints Change Order Plans Samples Specifications / Product Data Other: Approval Your Use As Requested Review and Comment Attached Separate Cover Via: Approved as Submitted Approved as Noted Returned After Loan Resubmit Submit Returned Returned for Corrections Due Date: 04/22/2016 WE ARE SENDING: SUBMITTED FOR: SENT VIA: ACTION TAKEN: TRANSMITTAL James Gettman Signed: PROJECT: DPS-Far NE ECE Center 04/25/2016 Date 032000.01 Code Concrete Reinforcing Shop Drawings Description Approved As Noted Status JOB: 16D5323 CC: Item Submittal 030000 Package 1 Rev. Copies Ph/Fax: 720-384-3323 NOTES: 5995 Greenwood Plaza Blvd. Suite 100 Greenwood Village, CO 80111-4710 303-571-5377 303-629-7467 (fax)

Upload: others

Post on 25-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT: DATE: TO: RE: ATTN: JOB: WE ARE …pix.ghphipps.com/projects/2015/15.0864/ProjDocs/06...B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop Drawings

16D5323-0033No.

B2 Construction CorporationPO Box 4323 Parker CO 80134

TO:

04/25/2016DATE:

030000-ConcreteRE:

David BeaudoinATTN:

Shop Drawings

Letter

Prints

Change Order

Plans

Samples

Specifications / Product Data

Other:

Approval

Your Use

As Requested

Review and Comment

Attached

Separate Cover Via:

Approved as Submitted

Approved as Noted

Returned After Loan

Resubmit

Submit

Returned

Returned for Corrections

Due Date: 04/22/2016

WE ARE SENDING: SUBMITTED FOR:

SENT VIA:

ACTION TAKEN:

TRANSMITTAL

James GettmanSigned:

PROJECT: DPS-Far NE ECE Center

04/25/2016

Date

032000.01

Code

Concrete Reinforcing Shop Drawings

Description

Approved AsNoted

Status

JOB: 16D5323

CC:

Item

Submittal 030000

Package

1

Rev. Copies

Ph/Fax: 720-384-3323

NOTES:

5995 Greenwood Plaza Blvd.Suite 100Greenwood Village, CO 80111-4710303-571-5377303-629-7467 (fax)

Page 2: PROJECT: DATE: TO: RE: ATTN: JOB: WE ARE …pix.ghphipps.com/projects/2015/15.0864/ProjDocs/06...B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop Drawings

Submittal Cover Sheet

Project Name Far NE ECE

Project Number 16D5323

Date 4-20-16

Architect Larson Incitti Architects

Contractor GH Phipps Construction Companies

Prepared by/Subcontractor B2 Construction

Supplier

Manufacturer

Submittal Number 032000.01 Concrete Reinforcing Shop drawings

Specification Section 032000

Drawing Number/Location

Contractor Review

A/E Review:

Contractor Notes:

HCL Engineering & Surveying, LLC

Project:

Date Rec’d:

APPROVED FURNISHED AS CORRECTED

REJECTED REVISE AND RESUBMIT

SUBMITTED SPECIFIC ITEM

THIS REVIEW WAS PERFORMED ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. MODIFICATIONS OR COMMENTS MADE ON THE SHOP DRAWINGS DURING THE REVIEW DO NOT RELIEVE CONTRACTOR FROM COMPLIANCE WITH THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. APPROVAL OF A SPECIFIC ITEM DOES NOT INCLUDE APPROVAL OF THE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOBSITE; INFORMATION THAT PERTAINS SOLELY TO THE FABRICATIONS PROCESS OR TO THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION, COORDINATION OF THE WORK OF ALL TRADES; AND FOR PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER.

DATE: BY:

FNE ECE - 16D5323 032000.01 CONCRETEREINFORCING SHOP DRAWINGS B2 CONSTRCUTION

4/20/2016

4/22/2016 Brian A. Harting

Page 3: PROJECT: DATE: TO: RE: ATTN: JOB: WE ARE …pix.ghphipps.com/projects/2015/15.0864/ProjDocs/06...B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop Drawings

B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop DrawingsReviewed and Submitted by David Beaudoin - April 12, 2016

This should be 2x30#5s - DWB

TOP & BOTTOM MATREINFORCINGHCL 4/22/2016 (BAH)

SHORT DIRECTIONSHOULD BE 2x35 #5sHCL 4/22/2016 (BAH)

SECTION-5HCL 4/22/2016 (BAH)

5 R1. 02

Correct (to fnd corner)Plans show 11" to brickHCL 4/22/16 (BAH)

S1 WELDED WIREFABRICHCL 4/22/2016 (BAH)

Page 4: PROJECT: DATE: TO: RE: ATTN: JOB: WE ARE …pix.ghphipps.com/projects/2015/15.0864/ProjDocs/06...B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop Drawings

B2 Construction Corporation Submittal 03 20 00 - 1.3 - Reinforcing Steel Shop DrawingsReviewed and Submitted by David Beaudoin - April 12, 2016

TOP & BOTTOM MATREINFORCINGHCL 4/22/2016 (BAH)

1'-8"HCL 4/22/2016 (BAH)

1'-6"

11"HCL 4/22/2016 (BAH)

11"

1'-6 1/2"

7"HCL 4/22/16 (BAH)

11" 11"