Project Management – An Overview
Sumantra Sarkar
MBA 8125 – Fall 201115th Nov, 2011
![Page 2: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/2.jpg)
Tacoma Narrows BridgeGalloping Gertie – 1940Collapsed on 7th Nov ’40Reason ‐ aerodynamic phenomena in suspension bridges were notbridges were not adequately understood.
A photographer for Tacoma News Tribune, Howard Clifford was the last man off the Bridge before it collapsed.
2
Now 94 (Apr ’06), Clifford recounts that fateful day
![Page 3: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/3.jpg)
Agenda
• What is a Project• History History• Operations Vs Project• Case StudyCase Study• Project Types• Project Management & Process Groups• Project Management & Process Groups• Knowledge Areas• Skills of a Project Manager• Skills of a Project Manager
3
![Page 4: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/4.jpg)
What is a Project ?
• A temporary endeavor undertaken to create a unique product, service or result
• Definite beginning and end• End
• Project’s objectives achieved• Project terminated – objectives cannot be met or need for project no longer exists
• Temporary does not necessarily mean short in duration©2008 P j t M t I tit t A G id t th P j t M t B d f©2008 Project Management Institute. A Guide to the Project Management Body of
Knowledge (PMBOK Guide® – 4th Edition)
4
![Page 5: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/5.jpg)
History
• Project Management Institute® ‐ founded in ’69• Premise – many management practices were common Premise many management practices were commonto projects in application areas as diverse as construction to pharmaceuticals
• ’81 – PMI Board of Directors approved a project to develop the procedures and concepts to support the profession of Project Management
• ’84 – First PMP certification awarded• ’87 – PMBOK Standards ; ’96 – A Guide to PMBOK• ’00 – 2nd Edition ; ’04 – 3rd Edition ; ’08 – 4th Edition• > 500,000 members
5
![Page 6: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/6.jpg)
Operations Vs Projects
Characteristics Operations Projects
Labor skills Low HighTraining timeWorker autonomyCompensation system
LowLowHourly or weekly wage
HighHighLump sum for project
Material input requirementsSuppler ties
High certaintyLonger durationMore formal
UncertainShorter durationLess formal
Raw Materials inventoryScheduling complexityQuality control
LargeLowerFormal
SmallHigherInformal
Information flowsWorker‐mgmt communicationDuration
Less importantLess importantOn‐going
Very importantVery importantTemporary
6
Product or service Repetitive Unique
![Page 7: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/7.jpg)
Hubble Telescope Failure
• Hubble Space Telescope launched aboard Space Shuttle Discovery on 24th April ’90
• NASA called it a “New window on the Universe”
• announced failure on 21st June ’90• Both high resolution imaging camerasBoth high resolution imaging cameras showed distortion
• Planning started in ’70 CongressPlanning started in 70 Congress approved (’78) at a cost of $ 400 M
• Total cost when launched ‐ $ 2 5 B• Total cost when launched ‐ $ 2.5 B• Lessons Learnt (pg 58)
7
![Page 8: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/8.jpg)
DIA Baggage Handling System
• Denver International Airport (DIA)• 53 sq. miles – designed to be the largest airport in US53 sq. miles designed to be the largest airport in US• Initial ground‐breaking in ’89 – completion Fall ’93• Original plan – individual airlines to build their ownOriginal plan individual airlines to build their own baggage handling system
• ’91 ‐ United Airlines started their own with BAE91 United Airlines started their own with BAE• ’92 – DIA approached BAE to build an airport‐wide system ‐ $ 175.6 Milliony $
• “most complex baggage handling system ever built” • 3100 telecars, 20 airlines, 5,000 optical detectors, 4003100 telecars, 20 airlines, 5,000 optical detectors, 400 radio receiver, 56 bar code scanners……
8
![Page 9: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/9.jpg)
DIA Baggage Handling System
• Aug 4 ’94, Mayor Webb announced a plan to develop “a temporary, low‐tech alternative system for the DIA’s high‐tech baggage system.
• Feb ’95 – 16 months behind schedule ‐ $ 5.2 billion (2 billion over budget) • 2 concourses served by manual baggage system• 1 concourse served by scaled down semi‐automated system
• Lessons Learnt$• ’05 – Fully manual system – Running cost $ 1 M per
monthA d t• An update ‐http://www.youtube.com/watch?v=xx8f4x6C_KY 9
![Page 10: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/10.jpg)
Top 10 Corporate IT failures
10
![Page 11: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/11.jpg)
Top 10 Corporate IT failures
11
![Page 12: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/12.jpg)
Top 10 Corporate IT failures
12
![Page 13: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/13.jpg)
IT Project types
• ERP Implementation• Software DevelopmentSoftware evelopment
• Traditional – SDLC• Newer Methods ‐ Agile
• Infrastructure – Mailing System migration, Setting up data center
• IT Infrastructure Management – Optimizing IT Operations
13
![Page 14: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/14.jpg)
Discussion questions for the class
• How many of you all have been not exposed to projects?
• How many of you have managed projects ?• What are the biggest challenges ?gg g• How do you measure whether you are on track?• How do you mitigate risk?How do you mitigate risk?• How many of you all have a “lessons learnt” session?• How many know about PMP ?How many know about PMP ?
14
![Page 15: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/15.jpg)
Project Management
• Application of knowledge, skills, tools and techniques to project activities to meet project requirements
• How ? • Appropriate application and integration of 42 logically pp p pp g g ygrouped project management processes comprising of 5 process groups• Initiating• PlanningE i• Executing
• Monitoring and Controlling• Closing• Closing
15
![Page 16: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/16.jpg)
Process Groups
• Initiating – processes performed to define a new project or a new phasep
• Planning – processes required to establish the scope of the project, refine the objectives, and define the course of action
• Executing – processes performed to complete the work• Monitoring & Controlling ‐ processes required to track, review and regulate the progress
• Closing – processes performed to finalize all activities 16
![Page 17: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/17.jpg)
Project Management Plan
• Project Management plan is iterative and goes through progressive elaboration throughout the project’s life cycle
• Progressive elaboration involves continuously improving and detailing a plan as more‐detailed and specific information and more accurate estimates become
il blavailable
17
![Page 18: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/18.jpg)
Project Management Office
• An organizational body or entity assigned various responsibilities related to the centralized and coordinated management of those projects under it’s domain
• Responsibility – range ‐ providing project management support to being responsible for direct management
• Functions• Managing shared resources across projectsId tif i d d l i PM th d l• Identifying and developing PM methodology
• Coaching, mentoring, training and ovesight• Monitoring compliance with PM Standards templates• Monitoring compliance with PM Standards, templates• Coordination communication across projects
18
![Page 19: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/19.jpg)
Project Life Cycle
A Guide to the Project Management Body of Knowledge ‐ PMBOK version 4
19
![Page 20: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/20.jpg)
Organizational Influences
• Organization Cultures and Styles • Cultural norms include common knowledge regarding Cultural norms include common knowledge regardinghow to approach getting the work done
• Share vision, values, norms, beliefs and expectations, , , p• Policies, methods and procedures• View of authority relationshipsView of authority relationships• Work ethic and work hours
20
![Page 21: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/21.jpg)
Organizational Process Assets
• Processes and Procedures• Standards, policies, process audits, improvement targets• Change control procedure, Proposal evaluation criteria• Templates, Issue and defect management procedure• Organization communication requirements• Project closure guidelines
l d• Corporate Knowledge Base• Project filesC fi ti t k l d b• Configuration management knowledgebase
• Financial databases containing information on labor hours• Process measurement databasesProcess measurement databases• Lessons learnt knowledge base
21
![Page 22: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/22.jpg)
Organization Structure
22
![Page 23: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/23.jpg)
Knowledge Areas ‐ 9
Integration Management
Scope Management
Human Resource Managementg
Time Management
g
Communications ManagementManagement
Cost
Management
RiskManagement
Quality
Management
Procurement
23
Quality Management
Procurement Management
![Page 24: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/24.jpg)
Process Groups & Knowledge Areas
24
![Page 25: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/25.jpg)
Break
25
![Page 26: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/26.jpg)
Knowledge Areas ‐ 9
Integration Management
Scope Management
Human Resource Managementg
Time Management
g
Communications ManagementManagement
Cost
Management
RiskManagement
Quality
Management
Procurement
26
Quality Management
Procurement Management
![Page 27: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/27.jpg)
Integration Management
• Develop Project Charter • Example of Project Charter
• Develop Project Management Plan• Direct and Manage Project Executiong j• Monitor and Control Project Work• Perform Integrated Change ControlPerform Integrated Change Control• Close Project or Phase
27
![Page 28: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/28.jpg)
Scope Management
• Collect Requirements• Define Scopeefine Scope• Create Work Breakdown Structure (WBS)
28
![Page 29: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/29.jpg)
WBS
29
![Page 30: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/30.jpg)
Scope Management
• Collect Requirements• Define Scopeefine Scope• Create Work Breakdown Structure (WBS)
• Verify Scope• Control Scope• Control Scope
30
![Page 31: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/31.jpg)
Time Management
• Define Activities• Sequence
Schedule Management Reference Card
Network Logic – links all
Schedule Management Reference Card
Network Logic – links all SequenceActivities
• Estimate Activity
WBS – product oriented, include all work, provides framework for planning
Establish baseline
logically related tasks & milestones, minimal use of constraints
Durations – realistic,
WBS – product oriented, include all work, provides framework for planning
Establish baseline
logically related tasks & milestones, minimal use of constraints
Durations – realistic, Estimate Activity Resources
• Estimate ActivityTask Descriptions – clear, complete, concise Slack (float) – amount of time a task can
slip before impacting project completion
discrete and measurable, use consistent time units
Task Descriptions – clear, complete, concise Slack (float) – amount of time a task can
slip before impacting project completion
discrete and measurable, use consistent time units
• Estimate Activity Durations
• Develop
Critical path typically starts at beginning (or time now) & flows thru logic sequence to project end, lowest slack path
Resource Overallocated
Critical path typically starts at beginning (or time now) & flows thru logic sequence to project end, lowest slack path
Resource Overallocated
• Develop ScheduleC t l S h d l
Note: Resource loading ensures cost/schedule integration and consistency between budget plan & schedule plan Note: Resource loading ensures cost/schedule integration and consistency between budget plan & schedule plan
• Control Schedule31
![Page 32: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/32.jpg)
Time Management (Gantt Chart)
32
![Page 33: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/33.jpg)
Time Management (PERT)
33
![Page 34: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/34.jpg)
Cost Management
• Estimate costs• Determine Estimate At
Completing the Picture
etermineBudget
• Control Costs
NCC=CBB=TAB
Actual costs
}
16182022
Complete (EAC) or Latest RevisedEstimate (LRE)
MRControl Costs
• How?
(ACWP)
ManagementReserve
$
810121416
Budgeted costs
(BCWS)
• How?• EVM – Earned Value Management
Budget atComplete
02468
Earned Value
(BCWP)
BAC
Value Management•Cost Variance•Schedule Variance
31Days Report Date Completion date
02 4 6 8 10 12 14 16 18 20
Schedule Variance
34
NASA IBR Toolkit ‐ 24 Dec 2009
![Page 35: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/35.jpg)
Cost Management
• Estimate costs• Determine etermineBudget
• Control CostsControl Costs
• How?• How?• EVM – Earned Value ManagementValue Management
•Cost Variance•Schedule VarianceSchedule Variance
35
NASA IBR Toolkit ‐ 24 Dec 2009
![Page 36: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/36.jpg)
Quality Management
• Plan Quality• Perform Quality AssurancePerform Quality Assurance• Perform Quality Control
36
![Page 37: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/37.jpg)
Human Resources Management
• Develop Human Resource Plan • Acquire Project TeamAcquire Project Team• Develop Project Team• Manage Project TeamManage Project Team
37
![Page 38: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/38.jpg)
Knowledge Areas ‐ 9
Integration Management
Scope Management
Human Resource Managementg
Time Management
g
Communications ManagementManagement
Cost
Management
RiskManagement
Quality
Management
Procurement
38
Quality Management
Procurement Management
![Page 39: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/39.jpg)
Break
39
![Page 40: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/40.jpg)
Knowledge Areas ‐ 9
Integration Management
Scope Management
Human Resource Managementg
Time Management
g
Communications ManagementManagement
Cost
Management
RiskManagement
Quality
Management
Procurement
40
Quality Management
Procurement Management
![Page 41: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/41.jpg)
Project Communications Management
• Identify Stakeholders• Plan communicationsPlan communications• Distribute Information• Manage Stakeholders expectationsManage Stakeholders expectations• Report performance
41
![Page 42: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/42.jpg)
Framework for Identifying Risks
• Background • $ 250 billion across 175,000 projects• Cost overrun ‐ $ 59 billion • Cancelled projects ‐ $ 81 billion
• One explanation – Managers are not taking prudent measures to assess and manage risk
• Suggested Steps• Identify risks
f• Relative importance of the risks• Identified risks to be classified to suggest meaningful mitigation strategiesmitigation strategies
42
![Page 43: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/43.jpg)
Framework for Identifying Risks
• Delphi Study – 40 software PM ‐ Finland, HK, US –selected common 11 factors ‐ universal
43
![Page 44: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/44.jpg)
Framework for Identifying Risks
• Q 1• Q 1 • specific risk factors ‐ lack of top management commitment, failure to gain user commitment, and inadequate user involvement.
• risk mitigation strategies ‐ create and maintain good relationships with customers and promote customerrelationships with customers and promote customer commitment to the project
44
![Page 45: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/45.jpg)
Framework for Identifying Risks
• Q 2• Q 2 • specific risk factors – ambiguities, uncertainties, misunderstandings in establishing the project’s scope and requirements.
• risk mitigation strategies ‐ emphasize the management of ambiguity and change avoid “scope creep” project drivenambiguity and change – avoid scope creep – project driven by user community
45
![Page 46: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/46.jpg)
Framework for Identifying Risks
• Q 3• Q 3 • specific risk factors – inappropriate / insufficient staffing, poor estimation, and improper definition of roles and responsibilities
• risk mitigation strategies ‐ internal evaluations coupled with external reviews to keep project on trackexternal reviews to keep project on track
46
![Page 47: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/47.jpg)
Framework for Identifying Risks
• Q 4• Q 4 • specific risk factors – changing scope/objectives (due to changes in senior management or the business itself), and conflicts that may arise between user departments.
• risk mitigation strategies ‐ concepts and tactics associated with disaster planningdisaster planning
47
![Page 48: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/48.jpg)
Framework for Identifying Risks
• Q1 ‐ determine if they have the support & commitment • Q2 ‐manage the ambiguity and change associated with establishing system scope and requirements
• Q3 ‐ select a risk‐driven execution strategy Q4 b bl i i d d d h• Q4 ‐ be able to anticipate and respond to unexpected changes in the environment
48
![Page 49: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/49.jpg)
One Minute Risk Assessment Tool
• Background • $ 2.5 trillion spent ‐ $ 1 trillion on underperforming projects• $ 75 billion each year
• Examined 720 software project assessments by senior IT managers in 60 large companies
• The relative weightsassociated with 6 keys/w project risk drivers
49
![Page 50: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/50.jpg)
One Minute Risk Assessment Tool
• Quick‐and‐dirty assessment of overall project risk• “what if” analysis• what‐if analysis
50
![Page 51: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/51.jpg)
Project Risk Management
• Plan Risk Management• Identify RisksIdentify Risks• Perform Qualitative Analysis• Perform Quantitative AnalysisPerform Quantitative Analysis• Plan Risk responses• Monitor and Control Risks• Monitor and Control Risks
51
![Page 52: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/52.jpg)
Project Procurement Management
• Plan Procurement• Conduct ProcurementConduct Procurement• Administer Procurement• Close ProcurementClose Procurement
52
![Page 53: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/53.jpg)
Skills in demand over next decade
53
![Page 54: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/54.jpg)
Effective Skills
• Leadership• Team BuildingTeam uilding• Motivation• CommunicationCommunication• Influencing• Decision Making• Decision Making• Political & Cultural awareness• Negotiation• Negotiation
54
![Page 55: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/55.jpg)
Thank youQuestions?Q
55
![Page 56: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/56.jpg)
Knowledge Areas
• Integration Management• Scope ManagementScope Management• Time Management• Cost ManagementCost Management• Quality Management• Human Resource Management• Human Resource Management• Communications Management• Risk Management• Risk Management• Procurement Management
56Cloud SOA SOA SOA SOA
![Page 57: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/57.jpg)
References
• Cloud Computing Explained ‐ By Rosalyn Metz ‐http://www.educause.edu/EDUCAUSE+Quarterly/EDUCAUSEQuarterlyMagazineVolum/CloudComputingExplained/206526putingExplained/206526
• http://cloudenterprise.info/2009/08/04/cloud‐definitions‐nist‐gartner‐forrester/• http://www.educause.edu/EDUCAUSE+Quarterly/EDUCAUSEQuarterlyMagazineVolum/
ServiceOrientedArchitectureWha/161835• SOA ppts from
http://www.educause.edu/Resources/ServiceOrientedArchitecture/161920
57
![Page 58: Project Management Overview - cis.gsu.edu · • Project Management plan is iterative and goes through ... • risk mitigation strategies ‐concepts and tactics associated with](https://reader035.vdocument.in/reader035/viewer/2022070612/5b5c83507f8b9a68368ce903/html5/thumbnails/58.jpg)
Tacoma Narrows BridgeA former photographer for the Tacoma News Tribune, Howard Clifford was the last manoff the first Narrows Bridge before it collapsed in 1940. Now 94, Clifford recounts that fateful day April 7 2006
http://www.youtube.com/watch?v=j-zczJXSxnw –Tacoma Narrows bridge
fateful day. April 7, 2006
Galloping GertieThe significance of the first Tacoma Narrows Bridge, to a large extent, is derived from its startling collapse on November 7, 1940. The collapse brought engineers world-wide to the realization that aerodynamic phenomena in suspension bridges were not adequately understood in the profession nor had they been addressed in this design. New research was necessary to understand and predict these forces. The official investigation into the collapse recommended the use of wind-tunnel tests to aid in the design of the second Tacoma Narrows Bridge and resulted in the testing of all existing and future bridges across
58Cloud SOA SOA SOA SOA
Narrows Bridge and resulted in the testing of all existing and future bridges across the country. New mathematical theories of vibration, aerodynamics, wave phenomena, and harmonics as they apply to bridge design arose from these studies.