Project Name Project Management Plan Template This document will be changed or amended as soon as additional or newer information is available INTERNAL USE ONLY COMPANY

Upload: dothuan

Post on 02-Feb-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

Project Name

Project Management Plan Template

This document will be changed or amended as soon as additional or newer information is available

INTERNAL USE ONLY COMPANY

Page 2: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

Document History<Add a new row for additional changes. Sort by Version in descending order. Enter the date in the MMM DD, YYYY format. Set the document status to Draft, Reviewed, or Approved.>

Version Date Author, Org Unit Status Comment / Description of Change

Document References<Specify the documents that are referred in the below table. See Guidelines for potential reference documents. Documents are assumed to be the latest version unless explicitly stated otherwise.>

Document Name File Name / Link Version Number

Approvers:Name Role Approval Received

INTERNAL USE ONLY PAGE 2 OF 22

Page 3: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

Table of Contents

Document History................................................................................................................................... 2

1. Introduction...................................................................................................................................... 6

1.1 Purpose of the Program Management Plan (PMP).................................................................6

1.2 How to use this template.........................................................................................................6

2. Project Approval Summary..............................................................................................................6

2.1 Current Situation..................................................................................................................... 6

2.2 Project Objective..................................................................................................................... 6

2.3 Constraints.............................................................................................................................. 6

2.4 Assumptions........................................................................................................................... 6

2.5 Dependencies......................................................................................................................... 7

3. Integration Management................................................................................................................. 7

3.1 Development Method..............................................................................................................7

3.2 Implementation Plan...............................................................................................................7

3.3 Monitoring and Control Project Work......................................................................................7

3.4 Issue Management Plan.........................................................................................................7

3.5 Escalation Management.........................................................................................................7

4. Scope Management........................................................................................................................ 8

4.1 Scope Management Plan........................................................................................................8

4.2 Scope Management Plan........................................................................................................8

4.3 Project Scope Statement........................................................................................................8

4.3.1 Business Process Scope....................................................................................................8

4.3.2 Customer Segment Scope..................................................................................................8

4.3.3 Product Scope.................................................................................................................... 8

4.3.4 Distribution Channel Scope................................................................................................8

4.3.5 Organizational Scope..........................................................................................................8

4.3.6 Location Scope................................................................................................................... 8

4.3.7 Data Scope......................................................................................................................... 9

4.3.8 Application Scope...............................................................................................................9

4.3.9 Technology Scope..............................................................................................................9

4.4 Work Breakdown Structure (WBS).........................................................................................9

4.5 WBS Dictionary....................................................................................................................... 9

4.6 Requirements Management Plan...........................................................................................9

4.7 Requirements Documentation................................................................................................9

4.8 Requirements Traceability Matrix...........................................................................................9

4.9 Acceptance Criteria................................................................................................................9

5. Change Management....................................................................................................................12

5.1 Scope Changes....................................................................................................................12

5.2 Schedule Changes...............................................................................................................13

5.3 Cost Changes.......................................................................................................................14

INTERNAL USE ONLY PAGE 3 OF 22

Page 4: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

5.4 Tracking Effort of Resources................................................................................................15

5.4.1 Tracking Effort/Cost of Internal Resources.......................................................................15

5.4.2 Tracking Effort/Cost of external Resources......................................................................15

6. Time Management........................................................................................................................16

6.1 Schedule Management Plan.................................................................................................16

6.2 Schedule Baseline................................................................................................................16

6.3 Schedule Control.................................................................................................................. 16

7. Cost Management......................................................................................................................... 17

7.1 Cost Management Plan........................................................................................................17

7.2 Cost Management Plan........................................................................................................17

7.3 Cost Baseline........................................................................................................................ 17

8. Quality Management.....................................................................................................................18

8.1 Quality Management Plan.....................................................................................................18

8.2 Process Improvement Plan...................................................................................................18

8.3 Quality Metrics...................................................................................................................... 18

8.4 Quality Checklists.................................................................................................................18

9. Human Resource Management.....................................................................................................19

9.1 Staffing management plan....................................................................................................19

9.1.1 On-Boarding External Resources (Contractors)...............................................................19

9.1.2 Off-Boarding External Resources (Contractors)...............................................................19

9.1.3 Recruiting and On-boarding Permanent Resources.........................................................19

9.1.4 Project organization charts...............................................................................................19

10. Communications Management.................................................................................................20

10.1 Communication Language....................................................................................................20

10.2 Naming Convention for File Names......................................................................................20

10.3 Data Classification Categories and Handling of Project Documents.....................................20

10.4 Communications Management Plan.....................................................................................20

10.5 Document Repository...........................................................................................................20

11. Risk Management..................................................................................................................... 21

11.1 Risk Management Plan.........................................................................................................21

12. Procurement Management.......................................................................................................22

12.1 Procurement Management Plan...........................................................................................22

12.2 Procurement Statement of Work...........................................................................................22

12.3 Procurement Documents......................................................................................................22

12.4 Source Selection Criteria......................................................................................................22

12.5 Make-or-Buy Decisions.........................................................................................................22

13. Stakeholder and Change Management....................................................................................23

13.1 Stakeholder Overview...........................................................................................................23

13.2 Stakeholder Register............................................................................................................23

13.3 Change Network Map...........................................................................................................23

13.3.1 Target Groups...............................................................................................................23

13.3.2 Sustaining Sponsors.....................................................................................................23

13.3.3 Change Agents.............................................................................................................23

INTERNAL USE ONLY PAGE 4 OF 22

Page 5: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

13.4 Stakeholder Impact Assessment..........................................................................................23

13.5 Change Assessment.............................................................................................................23

13.6 Stakeholder Management Plan.............................................................................................23

Appendix A: Supporting Documents.....................................................................................................24

Customized Tools (example only)........................................................................................................24

Appendix C: Checklists.....................................................................................................................24

Appendix D: Glossary........................................................................................................................25

INTERNAL USE ONLY PAGE 5 OF 22

Page 6: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

1. Introduction

1.1 Purpose of the Program Management Plan (PMP)

The project management plan describes how the project will be executed, monitored, and controlled based on the agreed objectives of the project. It integrates and consolidates all of the subsidiary plans and baselines from the planning processes.

Once the program management plan is baselined, it may only be changed when a change request is generated and approved.

1.2 How to use this templateThe Project Management Plan (PMP) template includes short instructions to help you create a project management plan. For additional guidance on how to complete the PMP, refer to the comprehensive Project Management Plan Guideline document.

Complete each section of the document, replacing the instructions with your actual text.

Update this document’s properties (On the File menu, click Properties), particularly the fields on the Summary and Custom tabs.

To update all fields in this document, including your table of contents, click Select All on the Edit menu, and then press F9.

2. Project Approval Summary

Project Work ID Approval Date

Project Name Approved Start Date

Related Program Approved End Date

2.1 Current Situation

Provide a clear and succinct summary of the primary business issues or opportunities leading to this project, and define the level of business priority attached to this project.

2.2 Project ObjectiveSpecify the objectives or outcome of the project and how it will address the issues or opportunities described in Section 1.1 above.

2.3 ConstraintsSpecify the constraints which apply to the project. When identifying constraints, consider the full scope of the project.

2.4 AssumptionsList any assumed factors (as opposed to known facts) that could affect the requirements or the project plan.

2.5 DependenciesIdentify any dependencies the project has on external factors, such as delivery from another project.

INTERNAL USE ONLY PAGE 6 OF 22

Page 7: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

3. Integration ManagementThis section describes the methods which have to be used on a day-to-day basis in each related project in order to achieve the assigned objectives. The objective here is to ensure professional project management and reporting consistency among its projects. However, depending on their particular scope, each project may identify and state in their own PMP the additional, complementary, or replacement delivery method and standard to be used, if they do not interfere with the consistency objective above.

3.1 Development Method

This section describes the delivery methodology and standards used in this program. It states how any standard frameworks will be tailored or adapted for use on the program (method adoption):

3.2 Implementation Plan

Explain how the transition of the final product, service, or result that the project was authorized to produce will take place. Ensure to cover both the technology and people aspects of a project.

3.3 Monitoring and Control Project Work

Monitoring and Control Project Work is the process of tracking, reviewing and reporting the progress to meet the performance objectives defined in the project management plan. The key benefit of this process is that it allows stakeholder to understand the current state of project work, the steps taken and budget, schedule and forecasts.

The processes and their outputs will be described in separate chapters in this document.

3.4 Issue Management Plan

This chapter describes how Issues and Action have to be recorded and managed

3.5 Escalation Management

This chapter describes how the project manager or team members appropriately escalate decisions or issues/problems.

INTERNAL USE ONLY PAGE 7 OF 22

Page 8: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

4. Scope Management

4.1 Scope Management Plan

Complete this section to describe how scope management will be structured and performed on the project.

4.2 Scope Management PlanThe scope management plan can be formal or informal, broadly framed or highly detailed, based on the needs of the project.

4.3 Project Scope StatementDefine the boundaries of the project across several dimensions.

4.3.1 Business Process Scope

In Scope Out of Scope

4.3.2 Customer Segment Scope

In Scope Out of Scope

4.3.3 Product Scope

In Scope Out of Scope

4.3.4 Distribution Channel Scope

In Scope Out of Scope

4.3.5 Organizational Scope

In Scope Out of Scope

4.3.6 Location Scope

In Scope Out of Scope

INTERNAL USE ONLY PAGE 8 OF 22

Page 9: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

4.3.7 Data Scope

In Scope Out of Scope

4.3.8 Application Scope

In Scope Out of Scope

4.3.9 Technology Scope

In Scope Out of Scope

4.4 Work Breakdown Structure (WBS)Include a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

4.5 WBS DictionaryProvide detailed deliverable, activity, and scheduling information about each component in the WBS.

4.6 Requirements Management PlanDescribe how requirements will be analyzed, documented, and managed.

4.7 Requirements DocumentationDescribe how individual requirements meet the business need for the project.

4.8 Requirements Traceability MatrixUse this section to link product requirements from their origin to the deliverables that satisfy them.

4.9 Acceptance CriteriaIn the following table, name the project’s completion and acceptance criteria.

5. Change ManagementThis chapter describes how to perform Integrated Change Control which is the process of reviewing all change requests, approving changes and managing changes to deliverables, organizational assets, project documents and the project management plan; and communicating their disposition (acc to PMBOK).

5.1 Scope Changes

Define how scope changes are managed

Scope Change Process:

INTERNAL USE ONLY PAGE 9 OF 22

Page 10: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

Activity Description Responsible CR Status at activity end

Raise Draft

Analyze Handed in to CAB

Approve ApprovedRejectedOn Hold

Schedule Scheduled

Implement Implemented

Who approves Scope Change Requests?

Document Changes due to Change RequestsAfter a change request approval, related documentation and specification, which describes the respective deliverable has to be checked and if necessary updates. Responsible is ….

INTERNAL USE ONLY PAGE 10 OF 22

RequesterProgram Member

StreamLeader

PMO

CAB

STC

Raise CRDraft

Analyze CR, Submit it to CABHanded in to CAB

Quality Check,Organize CAB

Approve CR?

CR in Program

Budget and Scope?

ApproveCR?

Update Change Log, Schedule CRScheduled

Update Doc.Implement CR, Test

Implemented

Yes

Yes, Approved

Yes, ApprovedNo, Rejected

No, RejectedNoNo, on Hold

Start

End

Page 11: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

5.2 Schedule Changes

Describe how schedule changes have to be submitted in “Schedule Change Log” in order to change the schedule controlled an in an orderly manner and that changes can be traced back.

Activity Description Responsible CR Status at activity end

Raise open

Analyze open

Approve ApprovedRejected

Schedule Scheduled

Minor schedule changes (cosmetics) are implement

Major schedule changes need to be approved by

The Schedule Change Log allows to trace back all changes in the schedule. The better a change is documented the better the understanding if questions arises. Most of the changes should include an attachment (MS Word) with a description in two parts (1) Status before the change (incl. screenshot of schedule section), and (2) status after the change (incl. screenshot of schedule section).

5.3 Cost Changes

Describe Cost Changes which arises from changes in scope, additional or reduced scope, estimation errors etc. and how/who approves the changes and more budget

INTERNAL USE ONLY PAGE 11 OF 22

Page 12: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

5.4 Tracking Effort of Resources

5.4.1 Tracking Effort/Cost of Internal ResourcesInternal resources …

5.4.2 Tracking Effort/Cost of external ResourcesExternal resources (contractors) …

INTERNAL USE ONLY PAGE 12 OF 22

Page 13: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

6. Time ManagementComplete this section to describe how time management will be structured and performed on the project.

6.1 Schedule Management PlanDescribe how the project schedule will be managed throughout the project.

6.2 Schedule BaselineInclude the approved version of the project schedule that can be changed only through formal change control procedures and is used as a basis for comparison to actual results.

Phase / Milestone Target Completion Dates

Key Deliverables Accountability

6.3 Schedule Control

Define how the schedule is monitored and controlled

INTERNAL USE ONLY PAGE 13 OF 22

Page 14: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

7. Cost Management

7.1 Cost Management Plan

Complete this section to describe how cost management will be structured and performed on the project.

Important note: Since the project management plan is shared with third parties involved in the project, do NOT include any confidential financial information that must not be disclosed. In this case, reference it here. When in doubt, contact your local PMO representative or Compliance officer.

7.2 Cost Management PlanDescribe how the project costs will be planned, structured, and controlled, that is, the cost management processes and their associated tools and techniques.

7.3 Cost BaselineInclude the approved version of the project budget which can only be changed through formal change control procedures and is used as a basis for comparison to actual results.

INTERNAL USE ONLY PAGE 14 OF 22

Page 15: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

8. Quality ManagementComplete this section to describe how quality management will be structured and performed on the project.

8.1 Quality Management PlanDescribe how Zurich's quality policies will be implemented and how the project management team plans to meet the quality requirements set for the project.

8.2 Process Improvement PlanDetail the steps for analyzing project management and product development processes to identify activities that enhance their value.

8.3 Quality MetricsDescribe which quality metrics will be used and how the control quality process will measure them.

8.4 Quality ChecklistsRefer to any checklist the project will use to ensure consistency in frequently performed tasks.

.

INTERNAL USE ONLY PAGE 15 OF 22

Page 16: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

9. Human Resource ManagementProvide guidance on how project human resources should be defined, staffed, managed, and eventually released.

9.1 Staffing management plan

9.1.1 On-Boarding External Resources (Contractors)

9.1.2 Off-Boarding External Resources (Contractors)

9.1.3 Recruiting and On-boarding Permanent Resources

9.1.4 Project organization charts

INTERNAL USE ONLY PAGE 16 OF 22

Page 17: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

10. Communications ManagementComplete this section to describe how communications management will be structured and performed on the project.

10.1 Communication Language

10.2 Naming Convention for File Names

10.3 Data Classification Categories and Handling of Project Documents

10.4 Communications Management Plan

Use this section to describe how project communications will be planned, structured, monitored, and controlled.

10.5 Document Repository

INTERNAL USE ONLY PAGE 17 OF 22

Page 18: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

11. Risk Management

11.1 Risk Management Plan

Describe how risk management activities will be structured and performed.

INTERNAL USE ONLY PAGE 18 OF 22

Page 19: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

12. Procurement ManagementComplete this section to describe how procurement management will be structured and performed on the project.

12.1 Procurement Management Plan

Define how the project team will acquire goods and services from outside the company and how they will govern the vendors and third parties involved in the project in cooperation with Sourcing & Procurement. Also describe how the procurement processes will be managed from developing procurement documents through contract closure, if applicable.

12.2 Procurement Statement of Work

For any services or products that are provided by a vendor or other third party and will be used by the project, describe the procurement item in sufficient detail.

Descriptions for procurement items are taken from the detailed specifications of the deliverables

12.3 Procurement Documents

Define or reference the procurement documents used to solicit proposals from prospective sellers.

N/A

12.4 Source Selection Criteria

Describe the source selection criteria used to rate or score seller proposals.

N/A

12.5 Make-or-Buy Decisions

Define how make-or-buy analysis will be performed.

N/A

INTERNAL USE ONLY PAGE 19 OF 22

Page 20: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

13. Stakeholder and Change ManagementComplete this section to describe how stakeholder and change management will be structured and performed on the project.

13.1 Stakeholder Overview

13.2 Stakeholder Register

13.3 Change Network Map

Describe the change network related to the project by examining the change from the perspective of those that are being asked to change, rather than the project view.

13.3.1 Target GroupsDefine the target groups that must change ("change target groups").

13.3.2 Sustaining SponsorsIdentify a sustaining sponsor for each target group.

13.3.3 Change AgentsDefine change agents who manage and deliver the day-to-day changes required in the change target

groups.

13.4 Stakeholder Impact AssessmentFor all identified stakeholders, describe how they will be impacted by the change, their key issues and concerns, how they will benefit from the change, and map their current and desired level of influence and support required for overall project effectiveness and delivery.

13.5 Change AssessmentDefine how commitment, readiness and ability to implement changes will be evaluated to determine which “conditions for success” factors are at risk, so that an appropriate stakeholder management plan can be designed and executed.

13.6 Stakeholder Management PlanDescribe how the project will interact with project stakeholders to support the project's interests

.

INTERNAL USE ONLY PAGE 20 OF 22

Figure 2: Stakeholder Overview (Status 1.2015)

Page 21: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

Appendix A: Supporting DocumentsSpecify all documents that are part of the Project Management Plan document and form the appendix to this document.

Customized Tools (example only)

Appendix C: ChecklistsProject Management Plan Checklist

Do the project’s objectives meet the business goals, and do they satisfy the SMART criteria?

Is the scope clear and unambiguous, are there any missing areas?

Are the out of scope areas clear, with reasons stated?

Are all constraints, assumptions and dependencies documented and agreed with the relevant owners?

Have the client responsibilities and dependencies been documented and agreed?

Are risks included and have realistic mitigation plans been defined?

Is the project’s approach to identifying, assessing and tracking risks defined?

Are completion and acceptance criteria specific to this project defined, and are they stated in a way that makes them verifiable?

Has the approach to the project and methodology to be used been specified and is it appropriate for the size and type of project?

Has the approach to ensuring quality of the project processes and deliverables been defined?

Is the list of key activities and milestones complete for the whole project? Are the milestones achievable?

Will the key activities and deliverables achieve the project objectives?

Do the project’s key activities align with the defined project approach?

Is the project’s approach to reporting status to stakeholders defined?

Is the project’s approach to managing and reporting issues defined?

Is the mechanism for requesting and approving changes to the project’s scope, cost, schedule or quality defined?

Does the project’s implementation strategy consider the overall management of organizational change?

Is the project organization appropriate to the size and type of project?

INTERNAL USE ONLY PAGE 21 OF 22

Page 22: Project Management Plan Template - Home Page - Roland ... Web viewProject Management Plan Template. ... and define the level of business priority attached to this project. ... (MS

PROJECT MANAGEMENT PLAN TEMPLATE

Do the project roles align with the defined project approach, and are all the necessary roles identified?

Are third parties that will be involved with the project identified, and has their involvement been defined?

Are third party responsibilities defined in terms of the key activities and deliverables that they will produce?

Are training requirements for project staff defined?

Are any necessary subordinate plans to the Project Management Plan referenced from the main document?

Is there a plan on how and when the project team will be staffed and have the key resources been confirmed and / or secured?