OFFSHORE SUPPORT & PRODUCTION FACILITYBUSINESS UNITRADIANT UTAMA GROUP

PRESENTATION2015

Page 2: Project Marketing Summary

List of Projects

Newly Awarded and Current Projects• CNOOC SES LTD. – FSO Widuri

Terminal• SANTOS (SAMPANG) PTY. LTD. –

FPSO Sea Good 101• TOTAL E&P INDONESIE – Dredging

Package No.2• TOTAL E&P INDONESIE – Dredging

Package No.9• TOTAL E&P INDONESIE – River

Crossing and River Banks

Potential Projects

• TOTAL E&P INDONESIE – Dredging Package No.1

• SANTOS INDONESIA – Ande-Ande Lumut Development Project

• HUSKY-CNOOC MADURA LTD. – Floating Production Unit for the MDA-MBH Field Development

• TOTAL E&P INDONESIE – Charter of AHT, Tugboat, Crewboat, Seabus

• TOTAL E&P INDONESIE –Production Facility Maintenance

Page 3: Project Marketing Summary

MOPU

Current Project

Project Name MOPU Conversion and Operating Services

Duration of the Project 10 years + 5 years

Project Duration April 2006 – April 2017

Contract Value USD xxx Daily Rate : xxx X-Brace per day: USD xxx Peluang per day: USD xxx Booster Compressor per day : USD xxx

Brief Description of the Project This project is intended for the installation of MOPU in Maleo Area for

Santos Indonesia. The facility supplies over 40% of gas to the industry located in East Java. Due to that reason, MOPU has become one of the most important asset of Local Government in East Java.

PT. Supraco Lines together with its Parent Company, PT. Radiant Utama Interinsco, Tbk. has provided full services for this project, starting from Engineers and Crews, installation of MOPU on site, Gas Production and MOPU maintenance.

Page 4: Project Marketing Summary

Charter FSO for Widuri Terminal

Project Name Charter for One (1) Unit

Floating Storage Offloading (FSO)for Widuri Terminal

Duration of the Project 5 years fixed + 5 add. Years

Project Type Consortium (fee-based)

Commencement Date December 2014 – May 2019

Contract Value USD XXX Daily Rate XXX FSO Federal II

Brief Description of the Project This project is to replace existing FPSO, Lentera Bangsa, owned and operated by Trada Maritim

Tbk. Due to explosion, the project is suspended & terminated. The converted FSO will be dedicated to accommodate oil production from Charterer oilfield

concessions offshore North West Java. The FSO is now on mooring process in Widuri Terminal.

Current Project

Page 5: Project Marketing Summary

Provision of Oyong Production Barge Services

Project Name Provision of Oyong Production Barge Services

Duration of the Project 1 year fixed + 1 additional year

Project Type Consortium with RUI and Apexindo (fee-based)

Commencement Date September 2013 – September 2014

Contract Value USD xxx Daily Rate USD xxx

Brief Description of the Project This project is dedicated to support Santos by providing FPSO in Oyong Area.

FPSO Seagood 101

Current Project

Page 6: Project Marketing Summary

Dredging & Lifting Services – Package No. 2

• Project Name Provision of 1 Unit 150 T Crane Barge

and its Package for Dredging andLifting/Add. Works (Package-2)

• Duration of the Project 3 years

• Project Type Asset Based

• Estimated Commencement Date June 2014 – June 2017

• Estimated Contract Value USD 8 millions

• Brief Description of the Project This project main intention is to perform

dredging activities in shallow waters and coastal sea of the Mahakam Contract area in East Kalimantan.

This project is just recently commenced on October 2014.

Current Project

Page 7: Project Marketing Summary

Dredging & Lifting Services – Package No. 9

• Project Name Provision of 1 Unit Crane Barge

and its Package for Dredging andLifting/Add. Works (Package-9)

• Duration of the Project 3 years

• Project Type Asset Based

• Estimated Commencement Date January 2014 – January 2017

• Contract Value USD 9 millions

• Brief Description of the Project This project main intention is to perform

dredging activities in shallow waters and coastal sea of the Mahakam Contract area in East Kalimantan.

This project starts on May 2014•

Current Project

Page 8: Project Marketing Summary

PRODUCED WATER TREATMENT RENTAL

Future Project

Hi-Flow Test Skid Project Name Produced Water Treatment Rental

Services

Duration of the Project 6 months

Project Type Rental

Duration of Projecy November 2014 – May 2015

Contract Value USD xxx Sales xxx

Project Information

The Produced Water Treatment (PWT) to maintain quality of produced and effluent water prior to disposal overboard. The quality of produced formation water disposed overboard will be in accordance with Indonesian environmental regulation as a minimum.

For offshore installations, the maximum oil content in waste water is 50 mg/L. The facilities will be designed by the Contractor to meet an environmental target of 25 mg/L. Continuous on-line oil-in-water monitoring equipment shall be installed for continuous monitoring and recording of effluent oil levels.