www.pennine.co.uk The Project The Project The Project The Project Palm Island is an artificial island being constructed off Dubai. It will form a prestigious development of villas, apartments, retail and service facilities – all visible from outer space. The main formation for the island is marine sand, placed hydraulically by ‘Rainbow’ dredgers. Before buildings and infrastructure can be constructed the sand needs to be compacted to control settlements. Pennine’s Contribution Pennine’s Contribution Pennine’s Contribution Pennine’s Contribution Working with one of Dubai’s largest contractors – Al-Naboodah LLC – Pennine provided equipment and technical expertise to carry out ground improvement to some 350,000m 2 in a 14 week period. In addition to assisting with design and trial compaction evaluation, Pennine provided assistance with training local staff in equipment use and maintenance. The ten sets of vibro Equipment provided by Pennine included BD300 & BD400 vibroflots, HD225 power packs, Pennine/Landini jetting pumps and various other ancillary equipment. The flots were used to carry out deep compaction within the sand to a depth of 14m, to achieve a relative density of greater than 85%. Vibroflots were the only equipment on this vast project that were capable of compacting the sand to the developer’s stringent requirements. Palm Island, Dubai Palm Island, Dubai Palm Island, Dubai Palm Island, Dubai Deep Compaction Deep Compaction Deep Compaction Deep Compaction Aerial view of Palm Island

Upload: alfredo-a-lopez

Post on 12-Jan-2016

223 views

Category:

Documents


0 download

DESCRIPTION

mejora de suelos

TRANSCRIPT

Page 1: Project Palmisland

www.pennine.co.uk

The ProjectThe ProjectThe ProjectThe Project

Palm Island is an artificial island being constructed off Dubai. It will form a prestigious development of villas, apartments, retail and service facilities – all visible from outer space. The main formation for the island is marine sand, placed hydraulically by ‘Rainbow’ dredgers. Before buildings and infrastructure can be constructed the sand needs to be compacted to control settlements. Pennine’s ContributionPennine’s ContributionPennine’s ContributionPennine’s Contribution

Working with one of Dubai’s largest contractors – Al-Naboodah LLC – Pennine provided equipment and technical expertise to carry out ground improvement to some 350,000m2 in a 14 week period. In addition to assisting with design and trial compaction evaluation, Pennine provided assistance with training local staff in equipment use and maintenance.

The ten sets of vibro Equipment provided by Pennine included BD300 & BD400 vibroflots, HD225 power packs, Pennine/Landini jetting pumps and various other ancillary equipment. The flots were used to carry out deep compaction within the sand to a depth of 14m, to achieve a relative density of greater than 85%. Vibroflots were the only equipment on this vast project that were capable of compacting the sand to the developer’s stringent requirements.

Palm Island, Dubai Palm Island, Dubai Palm Island, Dubai Palm Island, Dubai –––– Deep Compaction Deep Compaction Deep Compaction Deep Compaction