  • 8/3/2019 Project Proposal for Kutadza Alimon

    1/18

    1

    DEVELOPMENT OF A HIGH SPEED ELECTRIC

    GENERATOR AS A RENEWABLE ENERGYTECHNOLOGY (RET) MODEL FOR

    COMMERCIAL AND RURAL COMMUNITY

    APPLICATIONS.BY

    KUTADZA ALIMON

    ELECTRICAL ENGINEERING LEVEL 4

  • 8/3/2019 Project Proposal for Kutadza Alimon

    2/18

    2

    1:INTRODUCTION

    1.1:BACKGROUNDAccording to the IEA-Energy outlook 2004 some

    1.6 billion people about one quarter of the world'spopulation,have no access to electricity.80% of

    these people live in rural areas of the developing

    world.

    Without adequate supplies of affordable energy,it

    is virtually impossible to carry out productive

    economic activity or improve health and

    education.Zimbabwe is currently experiencing serious power

    shortages and having excessive load shedding.

    A wide range of factors are of course responsible

    for the power shortages.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    3/18

    3

    BACKGROUND Cont'dIn as much as the entire nation is blaming the

    national utility,Zimbabwe Electricity Supply

    Authority,(ZESA),for the powershortages,emphasis needs to be shifted on howwe can find ways that more electricity can beproduced as well as utilizing that which is alreadybeing produced.

    Zimbabwe has an installed capacity to produceabout 2100MW of electricity.

    Electricity is generated locally at

    Hwange(920MW),Kariba(750MW),Harare(135MW),Bulawayo(120MW) and Munyati (120MW )

    As the supply falls far short of thedemand,electricity supply is sometimes

    augmented by imports.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    4/18

    4

    BACKGROUND Cont'dAs the power supply falls far short of the

    demand

    However ,electrical machine design in the21st century has been made even more

    possible because of the advent of fast,

    efficient computer software and the ability tocarry out much iteration quickly and cheaply.

    The impetus is now on the design Engineer

    to arbitrarily design and perform calculationsrather than actually performing them. These

    latest developments in design have enabled

    the solving of many design problems.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    5/18

    5

    BACKGROUND Cont'dThe acute shortage of electricity in

    Zimbabwe has heightened the need to

    consider alternative generation modes.Some companies like Triangle Ltd

    produce their own power while othershave resorted to using diesel and petrolgenerators to supplement the nationalgrid.

    However this has proved to be very

    costly for companies leading todiscussions on less costly and morerealistic approaches to electricitygeneration.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    6/18

    6

    1.2:PROBLEM STATEMENTThe desire to come out with alternative

    generation modes involves utilizing some of

    the nation's idle lying biomass points in theSouth eastern lowveld and in the Eastern

    highlands.

    For the points to be utilized correspondinglysmall scale electric power plants need to be

    designed which leads to the

    DEVELOPMENT OF HIGH SPEEDELECTRIC GENERATORS AS A

    RENEWABLE ENERGY TECHNOLOGY

    MODEL FOR COMMERCIAL AND RURAL

    APPLICATIONS

  • 8/3/2019 Project Proposal for Kutadza Alimon

    7/187

    1.3:JUSTIFICATION

    Previously electrical machine design and attempts to

    disseminate RETS have encountered unforeseen

    barriers,The 21st century has seen the advent of fastand efficient computer software and design

    techniques which help in the realizations of these

    ventures.

    Barrier removal work like this project which aims at

    design and construction are very important so that

    future projects will avoid pitfalls experienced by

    earlier initiatives. If successful this project promises to be a model for

    the integration of large scale and

    community/household scale sustainable biomass

    energy management.

    1 4 OBJECTIVES

  • 8/3/2019 Project Proposal for Kutadza Alimon

    8/188

    1.4:OBJECTIVES

    Learn relevant design skills including

    production of design drawings using relevantcomputer software.

    Establish production methods for the RET

    model with the help of a localcompany,organization and or institution using

    locally available resources.

    Perform calculations,develop detaileddrawings and design sheet for RET model.

    And evaluate performance

  • 8/3/2019 Project Proposal for Kutadza Alimon

    9/189

    2:LITERATURE REVIEW

    2.1IntroductionRETs have over the years become an

    integral part of the energy supply chainin most developed countries. Recent

    projections show that 13.5% of the

    world's primary energy supply comesfrom renewable resources and that this

    figure has an aggregated growth rate of

    16%.Although the continent Zimbabwe has

    abundant renewable resources,these

    have not been fully utilized.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    10/1810

    Literature review cont'dSmall hydro projects producing power in

    the output ranges of 1-10KW are gaining

    popularity in Africa particularly as isolatedpower supply schemes for village

    electrification.

    However few biomass power plants existespecially in Zimbabwe where we have

    Triangle Ltd as one of the biomass power

    plant points.These companies have not extended their

    electricity supply to neighboring

    communities.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    11/1811

    2.2:DESIGN PROCESS

    The design process is a series of steps that are

    used as guidance in problem solvingThe design process is cyclical and is

    fundamentally a process that is highly

    computational and iterative.

    The initiation of design of the high speed electricgenerator requires specification of performance

    The main areas of design are the magnetic

    circuit,the electric circuit and the heating andcooling circuit. A simple generalized design

    process of electric generators has been

    developed and outlined below

  • 8/3/2019 Project Proposal for Kutadza Alimon

    12/18

    3 METHODOLOGY

  • 8/3/2019 Project Proposal for Kutadza Alimon

    13/18

    13

    3:METHODOLOGY

    In carrying out this project variousmethods of gathering reliable datasuch as interviews, deskresearches and internet researcheswill be used.

    Oral interviews will be carried outwith companies whose input inresources and information areessential to the success of the

    project in Zimbabwe.The internet and literature from

    the university library will also be

    used. A design of the lab model

  • 8/3/2019 Project Proposal for Kutadza Alimon

    14/18

    14

    METHODOLOGY-GAUNTT CHART

    TASK DATES1 Introduction 10/10/2011-17/10/20112 Literature review 10/10/2011-31/10/20113 Design process 17/10/2011-30/11/20114 Design sheet 05/12/2011-12/12/20115 Construction of labmodel/Implementation

    13/11/2011-28/03/2012

    6 Testing of lab model 29/03/2012-05/04/20127 Discussions(limitations andrecommendations)

    05/04/2012-12/04/2012

  • 8/3/2019 Project Proposal for Kutadza Alimon

    15/18

    15

    4:EQUIPMENT AND MATERIALSThe initial stage in design procedure is the

    selection of suitable basic materials to

    use.Conducting materialCopper is the most suitable material to use

    for electrical machines. Availability of

    copper is fast becoming compromised asa result of dwindling deposits of copper aswell as its price fluctuations. Thereforecopper is fast being replaced by

    aluminum.Magnetic materialSilicon steel is the most important for

    construction of electrical machines.Insulating material

  • 8/3/2019 Project Proposal for Kutadza Alimon

    16/18

    16

    Equipment and materials contd

    For the synchronous generators the

    desirable characteristics of the magneticcircuits are shown in the table below.

    A variety of other construction materialsand equipment like windings, ball bearings,drilling machines, centre lathes and othermachining equipment are required. Most ofthe stator and rotor construction materials

    would be supplied by Relmo.

    PART MATERIAL NORMALLYUSED

    Stator core Silicon steel

    Stator tooth Silicon steel

    Gap Air(in cooled machines)

    Pole Silicon steel(for salient polemachines)

    Rotor core Silicon steel

  • 8/3/2019 Project Proposal for Kutadza Alimon

    17/18

    BUDGET

    SUBMITTED COST ENQUIRES AND

    AM STILL TO RECIEVE A

    RESPONSE.ALTHOUGH FOR THE

    LAB MODEL STATOR AND ROTOR

    CONSTRUCTION WILL BE PROVIDED

    BY RELMO.

  • 8/3/2019 Project Proposal for Kutadza Alimon

    18/18